154-20250404105154 SHARKEY.pdf

PDF 84 KB Posted

Attached to
154-20250404105154 Sharkey
Solicitation number
3170032477
Issued by
Simpson County, Mississippi

About this file

This document is an Advertisement for Bids issued by the Sharkey County Board of Supervisors for the construction of wastewater facilities owned by Truelight Redevelopment Group, Inc. at the Little Panther Burn Subdivision in Rolling Fork, Mississippi. Sealed bids will be received until 10:00 AM local time on May 19, 2025, at the Sharkey County EOC, with electronic bids also accepted via www.heflinengineeringbids.com. Bidding documents can be examined at Heflin Engineering in Brandon, MS, and are available for preview and download from the specified website. Bid security in the form of a Bid Bond, certified check, or cashier's check for 5% of the bid amount is required.

The project is anticipated to be funded in whole or part by the ARPA Mississippi Municipality & County Water Infrastructure Grant (MCWI), subject to applicable Mississippi Code provisions. Minority and women's business enterprises are encouraged to bid as prime contractors or explore subcontracting opportunities. The procurement will be subject to various Uniform Guidance provisions, including federal compliance requirements related to the Coronavirus State and Local Fiscal Recovery Funds. The Sharkey County Board of Supervisors reserves the right to reject any and all bids, waive informalities, and hold bids for examination for up to 60 days. The solicitation emphasizes equal opportunity, with bidders to be considered without discrimination based on race, color, religion, sex, national origin, age, disability, or other protected status.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

Sharkey County Board of Supervisors 120 Locust Street (P.O. Box 218) Rolling Fork, MS 39159 (Owner) (Address)

Separate Sealed Bids for the Construction of wastewater facilities owned by Truelight Redevelopment Group, Inc. at the Little Panther Burn Subdivision in Rolling Fork, MS, will be received by the Sharkey County Board of Supervisors, herein called the “Owner” at the office of the Sharkey County EOC, 48 S. 4th Street, Rolling Fork, MS 39159 or electronic bids submitted via www.heflinengineeringbids.com until 10:00 AM local time on May 19, 2025, and then at said office publicly opened and read aloud.

The PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS may be examined at the following location(s):

Heflin Engineering, 1700 W Government St, Building A, Suite J, Brandon, MS 39042, 601-824-7569 (Consulting Engineer’s Office)

The BID SCHEDULE may be examined at the following location:

Mississippi Procurement Technical Assistance Program (MPTAP) Mississippi Development Authority, Minority & Small Business Development

Woolfolk Building 501 North West Street, Suite B 01

Jackson, MS 39201 601-359-3448

Northwest MS Contract Procurement Office

7075 Golden Oaks Loop W., Suite 12 Southaven, MS 38671

662-349-2379

Copies of the Plans, Specifications, and other Bidding Documents are available for preview, download or in hard copy format from www.heflinengineeringbids.com. Documents must be obtained from the website and such costs are non-refundable. For questions related to the online bidding process, please contact Plan House Bidding Group (662-407-0193).

Bid security in the form of a Bid Bond, certified check or cashier’s check in an amount equal to five percent (5%) of the Bid shall be furnished by each Bidder as required by the Contract Documents.

Minority and women’s business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material and/or supply needs.

Any contract or contracts awarded under this invitation for bids are expected to be funded in whole or in part by anticipated funds from the ARPA Mississippi Municipality & County Water Infrastructure Grant (MCWI). Neither the State of Mississippi, MDEQ, nor any of their employees is or will be a party to this invitation for bids or any resulting or related contracts. This procurement will be subject to all applicable sections of the Mississippi Code of 1972, Annotated, as they apply to local governments, in accordance with MCWI Program Regulations.

Based on the Assistance Listing: Coronavirus State and Local Fiscal Recovery Funds and Part 2 of the US Treasury State and Local Fiscal Recovery Funds Compliance and Reporting Guidance (v3.0 February 2022) (Compliance Guide), the following Uniform Guidance provisions will be required in all contracts:

• Subpart A, Acronyms and Definitions

• Subpart B, General provisions

• Subpart C, Pre-Federal Award Requirements and Contents of Federal Awards (except 2 CFR 200.204, .205, .210, and .213)

• Subpart D, Post Federal; Award Requirements (except 2 CFR 200.305(b)(8) & (9), .308, .309, and .320(c)(4))

• Subpart E, Cost Principles

• Subpart F, Audit Requirements

• 2 CFR Part 25 (Universal Identifier & System for Award Management)

• 2 CFR Part 170 (Reporting Subaward and Executive Compensation Information)

• 2 CFR Part 180 (OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Non-procurement)

• 2 CFR 200 Appendix ii http://www.heflinengineeringbids.com/ http://www.heflinengineeringbids.com/

Sharkey County Board of Supervisors is an Equal Opportunity Employer, and hereby notifies all bidders will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award.

Sharkey County Board of Supervisors reserves the right to reject any and all Bids and to waive any and all informalities, and reserves the right to hold all Bids for examination for a period not to exceed sixty (60) days and to award Contract to the lowest and best Bid complying with the Plans and Specifications within said time.

SHARKEY COUNTY BOARD OF SUPERVISORS

Murindia Williams, Chancery Clerk April 10 & 17, 2025

File details come from the government source that posted it. Updated .