15060m12.pdf
PDF 3 MB Posted
- Solicitation number
- N4008525R2603
About this file
This document is a Sequence of Operation specification for HVAC system components, specifically detailing operational procedures for fan coil units, chillers, heating-cooling changeover, converters, hot water pumps, and related mechanical systems. The specification is part of a Navy Public Works Center project for Additions & Renovations to Buildings NH-15, NH-16, and NH-17 at Naval Support Activity Norfolk, with drawing number M-12. The detailed sequence provides technical instructions for starting, operating, and controlling various mechanical system components, including precise temperature management, valve control sequences, and operational protocols for different HVAC equipment stages such as fan coil units, exhaust and supply fans, and hot water pumps. The document appears to be a technical specification sheet providing comprehensive operational guidelines for mechanical system integration and functionality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15060m13.pdf | ||
| 25R2603 Amend 0002.pdf | ||
| 15060m9.pdf | ||
| 15060m10.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .