This is a Change Order Notice issued by the Illinois Tollway (THA - Toll Highway Authority) through the Chief Procurement Office for General Services regarding an amendment to contract 15-0050 for Vehicle Hoist Inspection, Repair and Certification Services. The contract requires the incumbent vendor, Standard Industrial Automotive & Equipment Inc., to provide annual inspection, replacement, repair, and certification services for Rotary and Joyce brand vehicle hoists located at various facilities throughout the Tollway System on an as-needed basis. The services encompass both in-ground and above-ground lift inspections and maintenance, as well as mandatory annual certifications necessary to maintain operational status. The original contract was established for an initial term from August 1, 2016 through July 31, 2021, with a five-year renewal period extending from August 1, 2021 through July 31, 2026. This amendment continues the contract through its current expiration date of July 31, 2026.
The amendment increases the contract value by an estimated $100,000 to cover unforeseen repair costs through contract expiration, bringing the total estimated contract value to $557,274.85. This consists of the original initial term value of $238,774.85, the five-year renewal value of $120,000, and a first amendment of $98,500, with the current amendment of $100,000. The additional funding is necessary to address unanticipated repairs and maintain required certifications, as certification lapses would render the hoists inoperable and disrupt critical Tollway vehicle maintenance operations. The Tollway has determined that these services are essential to maintaining safe vehicle operations for its fleet and protecting public safety on the roadway system. This amendment qualifies for posting as it increases contract costs by more than $25,000.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: THA - Toll Highway Authority |
| ProcurementTitle: Vehicle Hoist Inspection, Repair and Certification Services |
| BBREFNO.: 26-557THA-OPERA-B-51568 |
| thedetails: The Illinois Tollway is seeking an amendment to its current Vehicle Hoist Inspection, Repair and Certification Services contract. The Vendor (Standard Industrial Automotive & Equipment Inc.) will provide annual Rotary and Joyce brand vehicle inspection, replacement, repair and certification services for its existing vehicle in-ground and above-ground lifts on an as-needed basis at various locations throughout the Tollway System. The resulting amendment to the current estimated contract with the awarded Vendor shall continue to its current expiration date of 7/31/26. This amendment amount is estimated at $100,000.00 which will give the total contract a estimated value of $557,274.85. The additional funding is needed for unforeseen repairs. In addition to repairs of these units this contract also covers all vehicle lifts certifications which must be certified every year. |
Without the Vehicle Hoist Inspection, Repair and Certification Services contract it could result in certification expiration. If certification expires this jeopardizes the lifts of being out of services until the certification is updated. These vehicle lifts are vital to the operation of the Tollway. In order to provide for a safe roadway, the Tollway must maintain its vehicles for the operators and to protect the general traveling public. This in turn keeps the vehicle in good working order and it can then be resold after its usefulness and return dollars back to the Tollway for future purchases. Without these services in place, it could delay the maintenance of Tollway vehicles.
The Initial Term of the Contract was from August 1, 2016 to July 31, 2021, which had a estimated contract value of $238,774.85 with a five-year renewal.
The 5 Year Renewal is from August 1, 2021 to July 31, 2026 an has a estimated value of $120,000.00.
The total Estimated Value of this Contract (Initial Term and Renewal) is $358,774.85.
The First Amendment added $98,500 to the contract which made the new total Estimated Value of this Contract (Initial Term and Renewal) $457,274.85
The Tollway is requesting a Estimated $100,000.00 contract increase to cover the spend through the end of the contract.