SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040403934
OSMRE Lakewood, CO
DOI, Office of Surface Mining & Rec
Acquisition Management Branch Building 25
S30
Kipling St & W 6th Ave
Lakewood CO 80235
Sherry Stuart at sstuart1@osmre.gov
Nicole Caveny at ncaveny@osmre.gov Elizabeth Shaeffer at eshaeffer@osmre.gov
Sherry Stuart (303) 2360330
WA-18-003
x
08/24/2018
140S0318B0008
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Plans and Specs for 754 Sunrise Pl SW written by Hart Crowser, number 19047-86, dated August 17, 2018.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
5 18 calendar days and complete it within ________________ ________________ calendar days after receiving
09/07/2018
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
OSMRE Lakewood, CO DOI, Office of Surface Mining & Rec
Acquisition Management Branch Building 25
S30
Kipling St & W 6th Ave
Lakewood CO 80235
Sherry Stuart
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140S0318B0008
PROJECT NUMBER: WA-18-003
754 SUNRISE PL SW
ISSAQUAH, WA 98027-4617
King County
COR: Nicole Caveny (303) 293-5078 ncaveny@osmre.gov
Bonding Requirement- Payment Bond or Irrevocable
Letter of Credit (ILC):
The penal amount of the payment bond or the amount of Irrevocable Letter of Credit (ILC) must equal 100 percent of the original contract price;
and if the contract price increases, an additional amount equal to 100 percent of the increase.
This is a Total Small Business set-aside.
NAICS 237990 is applicable.
Size Standard: $36.5M.
Estimated price range between $25,000 and
$100,000.
Davis Bacon Act applies.
Wage determination is attached to IFB and can be found at http://www.wdol.gov/dba.aspx
A Mandatory Pre-Bid Meeting has been scheduled at
9AM PT on Wednesday, August 29, 2018. Meet at 754
Sunrise Pl SW, Issaquah, WA 98027-4617.
Bids must be received by email at Sherry Stuart sstuart1@osmre.gov by 12:00 PM MT on September 7, 2018.
Bids must include construction schedule.
Successful lowest bidder must have an ACTIVE
Registration in the System for Award Management at sam.gov. Award will not be made to a contractor that has not satisfied these requirements.
Delivery: 10/20/2018
Delivery Location Code: 0003820492
OSM, Western Region
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140S0318B0008
1999 Broadway, Suite 3320
Denver CO 80202 US
FOB: Destination
00010 Mob, Prep, & Access
Period of Performance: 09/17/2018 to 10/20/2018
00020 Excavation and Grading
Period of Performance: 09/17/2018 to 10/20/2018
00030 Temporary Bulkhead
Period of Performance: 09/17/2018 to 10/20/2018
00040 Reinforcing Steel 850 LF
00050 Concrete Plug Placement 30 CD
00060 Site Restoration and Demob
Period of Performance: 09/17/2018 to 10/20/2018
TOTAL $
Bids determined to be materially unbalanced may be rejected. Unit prices are for payment purposes only. Extended prices shall prevail in the evaluation of bids.
SPECIAL NOTICE!
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140S0318B0008
All Office of Surface Mining Reclamation and
Enforcement (OSMRE) Contractors and
Sub-Contractors who receive 10% or more of the contract funding are required under 30 CFR 874.16 to obtain an Applicant/Violator System (AVS) data evaluation to determine eligibility for award of contracts under the Abandoned Mine Lands (AML)
Program. The OSMRE's automated Applicant/Violator
System must confirm Contractor eligibility.
Completion of the AML Contractor Information Form
(OMB 1029-0119) is necessary to obtain an AVS data evaluation. All bidders shall complete the
AML Contractor Information Form and submit it with your bid under this solicitation. Attach your AVS printout (See Part C on the Form) if appropriate. The award of any contract under this solicitation cannot be made until the OSMRE AVS office has processed the form.
As stated above, all Sub-Contractors who receive or are expected to receive 10% or more of the total contract funding (including all modifications) are required to obtain the AVS data evaluation. The evaluation should be obtained prior to the Sub-Contractor performing work equal to or greater than 10% of the contract cost. If the proposed Sub-Contractor is determined not eligible under the AVS evaluation, they shall be replaced by another Sub-Contractor at no additional cost to the Government. All replacement Sub-Contractor shall be subject to the requirements of this notice.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
140S0318B0008 754 Sunrise Pl SW WA-18-003
SECTION B - Supplies or Services/Prices Description of Project WA-18-002 Project Description SECTION C - Description/Specifications Project Description Mine Feature Description Reclamation Layout of Work. (APR 1984) 52.236-17 Specifications and Drawings for Construction. (FEB 1997) 52.236-21 SECTION E - Inspection and Acceptance Government Inspector LSM 1452.236-80 Inspection of Construction. (AUG 1996) 52.246-12 SECTION F - Deliveries or Performance Commencement, Prosecution, and Completion of Work. (APR 1984) 52.211-10 Liquidated Damages - Construction. (SEP 2000) 52.211-12 Variation in Estimated Quantity. (APR 1984) 52.211-18 Suspension of Work. (APR 1984) 52.242-14 SECTION G - Contract Administration Data Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-5 Specifications and Drawings LSM 02AML Offset of Payments LSM 23AML Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013) Invoice Submission Invoice Contents Invoice Payment Final Invoice Authorities and Delegations (SEP 2011) 1452.201-70 SECTION H - Special Contract Requirements Physical Data. (APR 1984) 52.236-4 Liability Insurance. (JUL 1996) 1452.228-70 Public and Private Road Maintenance LSM 1452.236-81 Location and Protection of Utilities and other Improvements LSM 1452.236-82 Equipment Responsibility LSM 1452.236-83 Rights of Entry - Project Site Area LSM 1452.236-85 Storage Areas - Waste Areas - Borrow Areas LSM 1452.236-86 Detours, Traffic Control Plan, Traffic Barricades, Warning and Safety Protection Devices LSM 1452.236-88 Open Fire Burning LSM 1452.236-89 Safety, Regulations, Laws to be Observed LSM 1452.237-80 Equitable Adjustment for Deleted Work LSM 19AML Minimum Wages Under Executive Order 13658 (JAN 2015) SECTION I - Contract Clauses Definitions. (NOV 2013) 52.202-1 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (Deviation 2015-02) (FEB 2015) 52.203-99 System for Award Management (OCT 2016) 52.204-7 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) 52.209-6 Time Extensions. (SEP 2000) 52.211-13 Order of Precedence - Sealed Bidding. (JAN 1986) 52.214-29 Notice of Total Small Business Set-Aside. (NOV 2011) 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011) - Alternate I (NOV 2011) 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011) - Alternate II (NOV 2011) 52.219-6 Post-Award Small Business Program Representation. (JUL 2013) 52.219-28
140S0318B0008 754 Sunrise Pl SW WA-18-003
Convict Labor. (JUN 2003) 52.222-3 Construction Wage Rate Requirements (May 2014) 52.222-6 Withholding of Funds. (MAY 2014) 52.222-7 Payrolls and Basic Records (MAY 2014) 52.222-8 Apprentices and Trainees. (JUL 2005) 52.222-9 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-10 Subcontracts (Labor Standards). (MAY 2014) 52.222-11 Contract Termination - Debarment. (MAY 2014) 52.222-12 Compliance with Davis-Bacon and Related Act Regulations. (MAY 2014) 52.222-13 Disputes Concerning Labor Standards. (FEB 1988) 52.222-14 Certification of Eligibility. (MAY 2014) 52.222-15 Prohibition of Segregated Facilities. (APR 2015) 52.222-21 Equal Opportunity. (SEP 2016) 52.222-26 Affirmative Action Compliance Requirements for Construction. (APR 2015) 52.222-27 Equal Opportunity for Veterans. (OCT 2015) 52.222-35 Affirmative Action for Workers with Disabilities. (JUL 2014) 52.222-36 Employment Reports on Veterans. (FEB 2016) 52.222-37 Combating Trafficking in Persons. (MAR 2015) 52.222-50 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) 52.223-2 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011) 52.223-18 Buy American Act - Construction Materials. (MAY 2014) 52.225-9 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.225-13 Authorization and Consent. (DEC 2007) 52.227-1 Patent Indemnity--Construction Contracts. (DEC 2007) 52.227-4 Additional Bond Security. (OCT 1997) 52.228-2 Pledges of Assets. (JAN 2012) 52.228-11 Prospective Subcontractor Requests for Bonds. (MAY 2014) 52.228-12 Alternative Payment Protections. (Jul 2000) 52.228-13 Irrevocable Letter of Credit. (NOV 2014) 52.228-14 Assignment of Claims. (MAY 2014) 52.232-23 Prompt Payment For Construction Contracts. (JAN 2017) 52.232-27 Payment by Electronic Funds Transfer – System for Award Management. (JUL 2013) 52.232-33 Disputes. (MAY 2014) - Alternate I (DEC 1991) 52.233-1 Protest after Award. (AUG 1996) 52.233-3 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.233-4 Differing Site Conditions. (APR 1984) 52.236-2 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-3 Material and Workmanship. (APR 1984) 52.236-5 Superintendence by the Contractor. (APR 1984) 52.236-6 Permits and Responsibilities. (NOV 1991) 52.236-7 Other Contracts. (APR 1984) 52.236-8 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-9 Operations and Storage Areas. (APR 1984) 52.236-10 Use and Possession Prior to Completion. (APR 1984) 52.236-11 Cleaning Up. (APR 1984) 52.236-12 Accident Prevention. (NOV 1991) 52.236-13 Quantity Surveys. (APR 1984) - Alternate I (APR 1984) 52.236-16 Preconstruction Conference. (FEB 1995) 52.236-26 Changes and Changed Conditions. (APR 1984) 52.243-5 Warranty of Construction. (MAR 1994) 52.246-21 Termination for Convenience of the Government (Fixed-Price). (APR 2012) 52.249-2 Default (Fixed-Price Construction). (APR 1984) 52.249-10
140S0318B0008 754 Sunrise Pl SW WA-18-003
Clauses Incorporated by Reference. (FEB 1998) 52.252-2 Release of Claims - Department of the Interior (JUL 1996) DIAR 1452.204-70 Service of Protest -- Department of the Interior (JUL 1996) (Deviation) DIAR 1452.233-2 Payrolls and Basic Records (Deviation AUG 2009) DOI 52.222-8 SECTION J - List of Documents, Exhibits and Other Attachments SECTION K - Representations, Certifications, and Other Statements of Bidders Annual Representations and Certifications. (JAN 2018) 52.204-8 Subcontracting Representation (PL 95-507) LSM 22AML SECTION L - Instructions, Conditions, and Notices to Bidders Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements— Representation Deviation. (2015-02) (FEB 2015) 52.203-98 Amendments to Invitations for Bids. (DEC 2016) 52.214-3 Submission of Bids. (DEC 2016) 52.214-5 Explanation to Prospective Bidders. (APR 1984) 52.214-6 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999) 52.214-7 Preparation of Bids - Construction. (APR 1984) 52.214-18 Contract Award - Sealed Bidding - Construction. (AUG 1996) 52.214-19 Late Submissions, Modifications, Revisions, and Withdrawals of Technical Proposals under Two-Step Sealed Bidding. (NOV 1999) 52.214-23 Submission of Offers in the English Language. (APR 1991) 52.214-34 Submission of Offers in U.S. Currency. (APR 1991) 52.214-35 Type of Contract. (APR 1984) 52.216-1 Construction Wage Rate Requirements--Secondary Site of the Work. (MAY 2014) 52.222-5 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction.
(FEB 1999) 52.222-23
Notice of Buy American Act Requirement - Construction Materials. (MAY 2014) - Alternate I (MAY 2014) 52.225-10 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995) 52.236-27 Solicitation Provisions Incorporated by Reference. (FEB 1998) 52.252-1 Authorized Deviations in Provisions. (Apr 1984) 52.252-5 Authorized Deviations in Clauses. (Apr 1984) 52.252-6
140S0318B0008 754 Sunrise Pl SW WA-18-003
SECTION B - Supplies or Services/Prices
Description of Project WA-18-003
Project Description: The purpose of this project is to abate the hazard from an abandoned coal mine feature located in a residential lawn at 754 Sunrise Place SW, Issaquah, Washington (King County). The feature has been designated as an approximately 2-foot-by-3.5-foot opening was located along the alignment of a 3.5-foot tall rockery landscaping wall on the northern edge of the 754 Sunrise Place property. From the lower side of the retaining wall, the sloughed soil in the center of the feature is about 2.5 to 4 feet deep. Using a stainless-steel peat probe, soft/loose soil was determined to extend another 1.5 to 8 feet below the top of the sloughed soil, with larger penetrations observed to the north.
SECTION C - Description/Specifications
Project Description: The purpose of this project is to abate the hazard from an abandoned coal mine feature located in a residential lawn at 754 Sunrise Place SW, Issaquah, Washington (King County). The feature has been designated as an approximately 2-foot-by-3.5-foot opening was located along the alignment of a 3.5-foot tall rockery landscaping wall on the northern edge of the 754 Sunrise Place property. From the lower side of the retaining wall, the sloughed soil in the center of the feature is about 2.5 to 4 feet deep. Using a stainless-steel peat probe, soft/loose soil was determined to extend another 1.5 to 8 feet below the top of the sloughed soil, with larger penetrations observed to the north.
Mine Feature Description Feature IS-205
Description. Feature IS-205 is very likely a mine-related subsidence. A collapse in the workings of the Bagley No.
1 and No. 2 seams, or a connecting shaft between the two seams, is the most likely cause of this subsidence. Coal seams in the area are mapped to be dipping at about 26 degrees downward to the north. Based on elevations in maps of the Newcastle-Issaquah Mine, the Bagley No. 2 seam water level workings could be very shallow in this area, with the feature mapping near the projected outcrop of the Bagley No. 2 coal seam; however, the exact depth to the workings is unknown. The Bagley No. 1 seam is located roughly 30 feet below the No. 2 seam, with the May Creek seam another 50 feet lower. The network of shafts and tunnels, connecting up to three coal seams at different depths below the feature, supports the likelihood that the feature is mine-related.
Location/Property Owner and Access. Feature IS-205 is in the northeast quarter of the southeast quarter of Section 33, Township 24N, Range 06E, in a residential front yard at 754 Sunrise Place SW, Issaquah, Washington.
The property is owned by Mr. Paul Gore. The general access route from Seattle is shown on Plans C-1, C-2, and C-3.
Reclamation Feature KR-002
The reclamation for Feature IS-205, as shown on Plan C-4, generally consists of the following tasks:
- Excavate the feature to a depth of approximately 8 to 10 feet in an effort to define a specific opening or throat.
- If the excavation reveals a well-defined opening:
• Install a contractor-designed temporary bulkhead as shown on the plans.
• Place reinforcing steel in the void above the bulkhead as identified on the plans.
• Place structural concrete in the void above the bulkhead as identified on the plans. The top of the final concrete surface shall be sloped to shed water toward the street, Sunrise Place SW.
• Grade the ground surface and place topsoil and seed above the concrete in all lawn areas that have been disturbed by the construction activity.
• Rebuild the rockery to match its condition on each side of the subsidence.
140S0318B0008 754 Sunrise Pl SW WA-18-003
- If the excavation does not reveal a well-defined opening:
• Backfill the excavation with structural concrete as identified on the plans. The top of the final concrete surface shall be sloped to shed water toward the street, Sunrise Place SW.
• Grade the ground surface and place topsoil and seed above the concrete in all lawn areas that have been disturbed by the construction activity.
• Rebuild the rockery to match its condition on each side of the subsidence.
For more details, see attached Plans and Specifications.
Layout of Work. (APR 1984) 52.236-17
Specifications and Drawings for Construction. (FEB 1997) 52.236-21
SECTION E - Inspection and Acceptance
Government Inspector LSM 1452.236-80
Day-to-day inspection activities will be performed by the Contracting Officer's Representative (COR) or OSMRE Field Representatives.
Inspection of Construction. (AUG 1996) 52.246-12
SECTION F - Deliveries or Performance
Commencement, Prosecution, and Completion of Work. (APR 1984) 52.211-10
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 70 calendar days. The time stated for completion shall include final cleanup of the premises.
Liquidated Damages - Construction. (SEP 2000) 52.211-12
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $500.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Variation in Estimated Quantity. (APR 1984) 52.211-18
Suspension of Work. (APR 1984) 52.242-14
SECTION G - Contract Administration Data
Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-5
140S0318B0008 754 Sunrise Pl SW WA-18-003
Specifications and Drawings LSM 02AML
The specifications and drawings and any modifications thereto attached to this contract are by this reference made a part of this contract.
Offset of Payments LSM 23AML
Payments to the prime contractor may be subject to an offset as a result of prior agreements entered into between the Government and i) the prime contractor, or ii) subcontractors, employees, agents, and/or consultants utilized by the prime contractor under this contract. The offset may be for an amount greater than the cost of work performed by the subcontractors, employees, agents, and/or consultants if the agreement with the Government so stipulates.
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov. Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
Included with the electronic IPP invoice shall be an attached itemized (printable) invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the contracting officer with its proposal or quotation.
Invoice Submission
The vendor must submit an invoice for payment no later than 30 calendar days after the end of the month of performance of services for each month services are performed. The vendor must notify the contracting officer in writing if the invoice will not be submitted within the specified time frame. Invoices MUST be submitted
ELECTRONICALLY. HARD COPIES OF INVOICES WILL NOT BE PROCESSED.
The contractor is responsible for ensuring invoices submitted are accurate and complete, and all labor, travel and other direct costs are in accordance with federal guidelines, the Federal Travel Regulations and other Government mandates and directives.
Additional supporting documentation MAY BE REQUESTED at the discretion of the COR.
Invoice Contents
For Fixed-Price Contract Line Item Numbers (CLINs)
Detailed pricing will be provided per deliverable. Invoices will be submitted upon successful delivery and Government acceptance of each deliverable. The contractor shall develop a payment schedule based on deliverables which will be reviewed by both the COR and CO. If the payment schedule is acceptable to the Government, the contractor shall bill based on the deliverable schedule accepted by the Government. Resulting orders will indicate https://www.ipp.gov/
140S0318B0008 754 Sunrise Pl SW WA-18-003 the payment schedule accepted by the Government.
The invoice will contain the following:
A) CLIN/Item number of deliverable B) Description of deliverable C) Price of deliverable D) Qty of deliverable E) Date deliverable was provided to the Government for inspection.
F) Serial number/part number if applicable G) Cumulative CLINs delivered and cumulative paid on delivered CLINS H) Travel costs (Not to Exceed) - must include the name of the traveler, travel itinerary, purpose of travel (event, exercise, workshop, etc), and any other documentation requested by the COR for Finance/Administration. A copy of the approved travel request form is to be attached for reference.
Invoice Payment
Payments under this Order will be due 14 calendar days after the date of actual receipt of proper invoice in the office designated to receive the original invoice or final acceptance of the goods or services, whichever is later.
All payments will be made via electronic funds transfer (EFT). The date of payment by wire transfer through the Treasury Financial Communications System shall be considered to be the day payment is made.
Final Invoice
Within sixty (60) calendar days of product acceptance and/or completion of services for each awarded Order:
a) The contractor shall submit a final invoice designated as such by a clear statement of “FINAL INVOICE” on the face of the invoice document.
b) The contractor shall provide a certificate of completion which certifies all goods and service have been provided as required by the SOW issued with each awarded Order.
c) The contractor shall provide a release of claims against the Government for any further payment under the awarded Order.
The sixty (60) calendar day submission timeframe shall not be extended without written authorization from the CO.
In the event items a, b, or c above are not submitted within the authorized timeframe, the CO will make final cost determinations in order to make final payment and close out the contract unilaterally.
Authorities and Delegations (SEP 2011) 1452.201-70
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
140S0318B0008 754 Sunrise Pl SW WA-18-003
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
SECTION H - Special Contract Requirements
Physical Data. (APR 1984) 52.236-4
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by OSMRE personnel.
Liability Insurance. (JUL 1996) 1452.228-70
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$500,000 each person
$1,000,000 each occurrence
$500,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the
140S0318B0008 754 Sunrise Pl SW WA-18-003
Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
Public and Private Road Maintenance LSM 1452.236-81
The Contractor shall maintain the public roads, private driveways, bridges and culverts in a condition equivalent to the preconstruction condition. Damage caused by the Contractor's equipment or vehicles will be repaired by the Contractor, at the Contractor's expense, at once to allow ingress and egress without delay or damage to passenger cars or other vehicles.
Location and Protection of Utilities and other Improvements LSM 1452.236-82
(a) Prior to the initiation of work, the Contractor shall contact all utility companies and property owners in order to determine the exact location of utilities. All utilities in or near the construction area, both above and below ground, shall be located, protected, and if necessary, relocated by the Contractor prior to construction.
(b) Should damage to a utility occur, the Contractor shall immediately notify the affected utility company, the affected property owner and the COR.
(c) During grouting operations, the Contractor shall continuously monitor all structures and residences in and around the project area in order to avoid damage as a consequence of the work. In the event such damage does occur, the Contractor shall terminate operations immediately and notify the affected owner and the COR. The Contractor shall repair at the Contractor's expense any damage to those structures and residences, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work.
(d) Prior to project initiation, the Contractor shall water test all sewer lines that may be affected by project activities.
The test shall consist of running a water-dye mixture through the sewer line for purposes of determining whether the line is in an open condition. The testing shall be performed in the presence of the Contractor, the Office of Surface Mining Reclamation and Enforcement (OSMRE) Representative, and the utility owner. The results shall be recorded and provided to each participant prior to the Contractor beginning any work on the site. There will be no separate compensation for the performance of sewer testing. Should the tests indicate that an obstruction or other deficiency exists within a tested sewer line, the Contractor shall take appropriate actions to ensure that its activities do not damage or affect the line. Work may be suspended by the Contracting Officer, in part or completely, in order to permit the owner of the affected sewer line to make repairs.
Equipment Responsibility LSM 1452.236-83
(a) All equipment shall be in satisfactory operating condition, capable of safely and efficiently performing the work required, and of a size commensurate with the work to be performed. Qualified operating personnel shall be provided by the Contractor for the operation of this equipment.
(b) The Contractor shall furnish and install all fuel, grease, cables, repair parts, tools, methane monitors, welders, and all other miscellaneous supplies and parts necessary for efficient and safe operation. Repairs and replacements shall be made by the Contractor at the Contractor's own expense, within 48 hours from the time of breakdown.
(c) The Contracting Officer or the COR may at any time inspect the Contractor's equipment on the job site. If said equipment is deemed inadequate or any part thereof improper, the Contractor shall replace or make repairs in a manner consistent with paragraph (b) above.
Rights of Entry - Project Site Area LSM 1452.236-85
Rights of entry from the landowners within the project site area are the responsibility of OSMRE. Any property to
140S0318B0008 754 Sunrise Pl SW WA-18-003 be affected or utilized by the Contractor within the project site shall not be entered upon prior to coordinating with the COR.
Storage Areas - Waste Areas - Borrow Areas LSM 1452.236-86
(a) The Contractor shall make arrangements for the handling, storage and protection of all materials and equipment to be used in this work area. Prior to the storage of any material on private property outside the project site area, the Contractor shall enter into a written agreement with the property owner granting permission for such storage. The agreement between the Contractor and the private property owner shall provide for the restoration of that property used for storage purposes in a manner consistent with the technical specifications of this contract.
(b) The Contractor shall make arrangements for the use of waste areas required for the disposal of unsuitable and/or surplus material. Prior to the use of any private property outside of the project site as a waste area, the Contractor shall enter into a written agreement with the property owner granting permission to use the land for such purposes.
The agreement between the Contractor and the private property owner shall provide for the restoration consistent with the technical specifications of the contract.
(c) The Contractor shall make arrangements for the use of off-site borrow areas. Prior to the use of any private property as an off-site borrow area, the Contractor shall enter into a written agreement with the property owner granting permission to use the land for such purposes. The agreement between the Contractor and the private property owner shall provide for the restoration of the property in a manner consistent with the technical specifications of this contract.
(d) A copy of each agreement between the Contractor and a private property owner shall be provided to the COR.
Each agreement must be approved by OSMRE prior to the storage of any material on the private property, or the use of the property as a waste area or borrow site.
Detours, Traffic Control Plan, Traffic Barricades, Warning and Safety Protection Devices LSM 1452.236-88
(a) The Contractor shall adequately protect work under construction, as well as protect the public from accident and unnecessary inconvenience, with barricades, warning, and safety devices.
(b) Any barricades detour, and directional signs required for implementing the establishment of a detour and/or equipment entrance points, shall be furnished, erected and maintained by the Contractor. No separate compensation shall be allowed for permits, bonding of roads, traffic barricades, warning and safety protection devices, as it shall be considered part of the Contract bid lump sum price for mobilization and demobilization. Damaged, lost and/or stolen warning and safety protection devices shall be replaced with same by the Contractor within 12 hours with no additional compensation allowed for replacement of repair of such devices.
(c) The Contractor shall contact the State or local authority responsible for roads and highways regarding the requirements for the maintenance of traffic along any affected roadways for the duration of the contract.
Open Fire Burning LSM 1452.236-89
Disposal of cleared and grubbed materials by burning will be permitted only insofar as the procedure complies with the provisions of all appropriate Local, County, State, and Federal Anti-Pollution measures adopted for this area.
Such burning of materials shall be permitted only in areas designated by the COR.
Safety, Regulations, Laws to be Observed LSM 1452.237-80
(a) The Contractor, its employees, and its subcontractors and employees shall abide by all safety rules applicable at the site of the work and shall comply with all applicable laws, ordinances, orders, codes, rules, regulations, etc. The Contractor shall furnish employees, including those of subcontractors, with recognized approved safety equipment, devices, and sanitary facilities and enforce compliance in their use consistent with accepted practices and applicable
140S0318B0008 754 Sunrise Pl SW WA-18-003 rules. The Contractor shall provide barricades, signs, and other safety equipment as required by Federal, State, or local codes.
(b) The Contractor shall comply with all regulations of the Occupational Safety and Health Act (OSHA) of 1970.
The Government shall not be liable for any citations received by the Contractor as a result of failure to comply with applicable OSHA standards.
(c) All appropriate Township, County, State, and Federal Regulations, codes, and ordinances shall apply to this Contract. It shall be the Contractor’s sole responsibility to be aware of these regulations and to comply with them.
The Government shall not be liable for any citations received by the Contractor.
(d) The Contractor, at all times, shall observe, comply with, and post as required all Federal, State and local laws, ordinances, and regulations in any manner affecting the conduct of the work applying to employees on the project, as well as all orders or decrees which have been or may be promulgated or enacted by any legal bodies or tribunals having authority or jurisdiction over the work, materials, employees, or contract.
(e) The Contractor shall be aware that the Government may request periodic inspections of the Contractor’s operations, facilities and equipment, by any applicable governing regulatory agency.
(f) If the Contractor fails or refuses to promptly comply with any of the requirements of this special provision, the Contracting Officer, or his authorized representative, shall notify the Contractor of the noncompliance and indicate to the Contractor the corrective action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, either oral or written, when served on the Contractor or his authorized representative(s) at the site of the work, shall be deemed sufficient notice of noncompliance and of the need for corrective action.
(g) In the event the Contractor fails or refuses to promptly take corrective action, the Contracting Officer or his authorized representative may issue an order to suspend all or any part of the work. When satisfactory corrective action is taken, an order to resume work will be issued. The Contractor shall not be entitled to any extension of time, nor to any claim for damages or to excess costs by reason of either the directive or the suspension order.
Failure of the Contracting Officer or his authorized representative to order discontinuance of any or all of the Contractor’s operations shall not relieve the Contractor of his responsibility for the safety of personnel and property.
(h) Compensation for compliance with any of the above items is to be included in the various items of the Contract for the expense involved.
Equitable Adjustment for Deleted Work LSM 19AML
(a) If during the performance of this contract, a line item is deleted in its entirety, the contract will be subject to a downward equitable adjustment based upon what it would have cost the Contractor (including applicable overhead and profit) to perform the work if it had not been deleted from the contract.
(b) The bid price shall not automatically be considered the equitable adjusted price, but rather both parties shall reach a mutual agreement as to what the cost of the work (including applicable overhead and profit) would have been.
(c) If mutual agreement cannot be reached on the equitable adjustment, the Contracting Officer shall issue a final decision subject to the Disputes Clause.
Minimum Wages Under Executive Order 13658 (JAN 2015)
(a) Definitions. As used in this clause—
“United States” means the 50 states and the District of Columbia.
140S0318B0008 754 Sunrise Pl SW WA-18-003
“Worker”—
(1) Means any person engaged in performing work on, or in connection with, a contract covered by Executive Order 13658, and
(i) Whose wages under such contract are governed by the Fair Labor Standards Act (29 U.S.C. chapter 8), the Service Contract Labor Standards statute (41 U.S.C. chapter 67), or the Wage Rate Requirements (Construction) statute (40 U.S.C. chapter 31, subchapter IV),
(ii) Other than individuals employed in a bona fide executive, administrative, or professional capacity, as those terms are defined in 29 CFR part 541,
(iii) Regardless of the contractual relationship alleged to exist between the individual and the employer.
(2) Includes workers performing on, or in connection with, the contract whose wages are calculated pursuant to special certificates issued under 29 U.S.C. 214(c).
(3) Also includes any person working on, or in connection with, the contract and individually registered in a bona fide apprenticeship or training program registered with the Department of Labor's Employment and Training Administration, Office of Apprenticeship, or with a State Apprenticeship Agency recognized by the Office of Apprenticeship.
(b) Executive Order Minimum Wage rate. (1) The Contractor shall pay to workers, while performing in the United States, and performing on, or in connection with, this contract, a minimum hourly wage rate of $10.10 per hour beginning January 1, 2015.
(2) The Contractor shall adjust the minimum wage paid, if necessary, beginning January 1, 2016 and annually thereafter, to meet the Secretary of Labor's annual E.O. minimum wage. The Administrator of the Department of Labor's Wage and Hour Division (the Administrator) will publish annual determinations in the Federal Register no later than 90 days before the effective date of the new E.O. minimum wage rate. The Administrator will also publish the applicable E.O. minimum wage on www.wdol.gov (or any successor Web site) and on all wage determinations issued under the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.
The applicable published E.O. minimum wage is incorporated by reference into this contract.
(3)(i) The Contractor may request a price adjustment only after the effective date of the new annual E.O. minimum wage determination. Prices will be adjusted only if labor costs increase as a result of an increase in the annual E.O.
minimum wage, and for associated labor costs and relevant subcontract costs. Associated labor costs shall include increases or decreases that result from changes in social security and unemployment taxes and workers' compensation insurance, but will not otherwise include any amount for general and administrative costs, overhead, or profit.
(ii) Subcontractors may be entitled to adjustments due to the new minimum wage, pursuant to paragraph (b)(2).
Contractors shall consider any subcontractor requests for such price adjustment.
(iii) The Contracting Officer will not adjust the contract price under this clause for any costs other than those identified in paragraph (b)(3)(i) of this clause, and will not provide duplicate price adjustments with any price adjustment under clauses implementing the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute.
(4) The Contractor warrants that the prices in this contract do not include allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
(5) A pay period under this clause may not be longer than semi-monthly, but may be shorter to comply with any https://www.federalregister.gov/executive-order/13658 https://www.federalregister.gov/executive-order/13658 https://www.federalregister.gov/select-citation/2014/12/15/29-CFR-541 http://api.fdsys.gov/link?collection=uscode&title=29&year=mostrecent§ion=214&type=usc&link-type=html http://www.wdol.gov/
140S0318B0008 754 Sunrise Pl SW WA-18-003 applicable law or other requirement under this contract establishing a shorter pay period. Workers shall be paid no later than one pay period following the end of the regular pay period in which such wages were earned or accrued.
(6) The Contractor shall pay, unconditionally to each worker, all wages due free and clear without subsequent rebate or kickback. The Contractor may make deductions that reduce a worker's wages below the E.O. minimum wage rate only if done in accordance with 29 CFR 10.23, Deductions.
(7) The Contractor shall not discharge any part of its minimum wage obligation under this clause by furnishing fringe benefits or, with respect to workers whose wages are governed by the Service Contract Labor Standards statute, the cash equivalent thereof.
(8) Nothing in this clause shall excuse the Contractor from compliance with any applicable Federal or State prevailing wage law or any applicable law or municipal ordinance establishing a minimum wage higher than the E.O. minimum wage. However, wage increases under such other laws or municipal ordinances are not subject to price adjustment under this subpart.
(9) The Contractor shall pay the E.O. minimum wage rate whenever it is higher than any applicable collective bargaining agreement(s) wage rate.
(10) The Contractor shall follow the policies and procedures in 29 CFR 10.24(b) and 10.28 for treatment of workers engaged in an occupation in which they customarily and regularly receive more than $30 a month in tips.
(c)(1) This clause applies to workers as defined in paragraph (a). As provided in that definition—
(i) Workers are covered regardless of the contractual relationship alleged to exist between the contractor or subcontractor and the worker;
(ii) Workers with disabilities whose wages are calculated pursuant to special certificates issued under 29 U.S.C.
214(c) are covered; and
(iii) Workers who are registered in a bona fide apprenticeship program or training program registered with the Department of Labor's Employment and Training Administration, Office of…