This is a Questions and Answers document addressing clarifications for a Bureau of Reclamation data analytics solicitation (140RR027Q0029). The solicitation is a full and open competition (unrestricted, not set-aside) seeking a commercial off-the-shelf AI/ML platform for predictive analytics on hydroelectric generating units. The base year pilot involves four units from one powerplant with approximately 110 input tags per unit (440 total tags and 16 models), utilizing data from AVEVA PI or GE Proficy historian platforms on Reclamation's on-premise virtualized infrastructure. The contract includes a base year plus three option years, with Option Year 2 and 3 expanding to 30 total units (26 new units plus the original 4). The estimated contract start date is December 1, 2026, with exact dates to be established before award, ideally beginning immediately following award. Offerors must provide firm fixed pricing on Schedule B covering the base year and all three option years, with detailed labor category breakdowns for support services as specified in the Performance Work Statement Section 6.

Quotations must be submitted via email to brittney_murphy@ios.doi.gov by November 30, 2026, at 11:30 PM Mountain Time. Offerors may propose either direct platform solutions or act as systems integrators/resellers, provided proposed personnel and customer references meet qualifications in PWS Section 7, which requires nine references across three categories: three customers using the system for fleet-wide monitoring (minimum 10 units per customer), three customers using PI historian integration, and three hydroelectric generator customers. Subcontracting plans are required only if subcontractors are utilized. The pilot may proceed with manual data transfer and non-production implementation without a full production Authorization to Operate (ATO), but full ATO must be obtained before Option Year 1 deployment. FedRAMP certification is required only for cloud-hosted solutions; on-premise deployments must comply with DOI, Reclamation, FISMA, RMF, and NIST cybersecurity requirements. Data sampling frequency is expected to average approximately one point per second, and all solutions must be deployed on Reclamation-owned or managed on-premises infrastructure, with no approval for external cloud providers identified.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers: Answers are in BOLD

Question 1:

Could you clarify whether contractor personnel who are not U.S. citizens or permanent residents may perform the data analytics work remotely, from outside the United States, subject to Reclamation's data-handling and access requirements? Or must all personnel be U.S.-based or U.S. citizens?

See Section 8

Question 2:

Factor 3 reads: "The quote will be evaluated based on the Offeror's experience with projects similar in scope and size to the work described herein within the past five years. The vendor shall provide references for three customers utilizing the system..."

We would propose an existing commercial (COTS) system supplied and supported through its manufacturer or an authorized reseller. May the Factor 3 experience and the nine customer references be those of the manufacturer of the proposed system, rather than the offeror's own prior contracts?

Vendor must supply qualification and experience as listed in section 7 of the vendor’s customers and employees.

Question 3:

We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?

This is a brand new contract that includes some of the software we are using as listed in the PWS.

Question 4:

In terms of timing, we have a 4.5% global price increase occurring on 1/1/27. Would it be better to provide a quote with a shorter validity date that expires 12/31/26, or include language that provisions the price increase?

Also, I don't see any means for submission through sam.gov. Should I submit the quote to you directly when it's ready?

Provide firm fixed pricing as outlined in section 4.1 and 4.2. This includes Base year plus three Option Years Schedule B that is listed in the solicitation. The submittal instructions listed in the PWS indicates you will submit all quote packages via email to Brittney_Murphy@ios.doi.gov.

Question 5:

an attached table" but I only see a table for tasks in section 9, nor is there a table in any other document included in the RFQ. Am I missing something?

The attached table has been added thank you for bringing this to our attention. It was officially added to the solicitation on 11/17 and due to the delayed post we will be providing a final extension for the solicitation.

Question 6:

Schedule B Pricing. The submission instructions ask quoters to complete Schedule B Pricing, but it does not appear among the posted attachments. Could you post it, or confirm that quoters may use their own format following the PWS Pricing Information section?

We would like for both pricing to be provided. The Schedule B gives us a big picture view of the pricing as well as the breakdown version requested in the PWS which will be used to assist during the evaluation phase.

Question 7:

Pilot powerplant. Can Reclamation identify the powerplant hosting the pilot, and the MW rating, turbine type and OEM of each of the four pilot units? If that cannot be shared before award, can you confirm the number of models and tags per unit in the PWS (about 110 tags per unit, 16 models total) is the basis for pricing?

Not releasing the powerplant name hosting the pilot. For the pilot see section 4.1.2- “Pilot will utilize data from 4 units from 1 powerplant. Each unit has roughly 110 input tags. Four models (such as Generator, Bearings, Turbine) for each unit will be built, trained, deployed, and tested. Total of 440 tags and 16 models.”

You may provide pricing as stated in section 6.2

Question 8:

Option Years 2 and 3. Can Reclamation identify the plants and units that make up the 26 additional units, or their general size range?

This information is not being released. You may provide pricing as stated in section 6.2.

Question 9:

Historian. Is the pilot plant's data in AVEVA PI or GE Proficy today?

AVEVA PI historian

Question 10:

Limitations on subcontracting. The acquisition is unrestricted, but the combined synopsis includes the text of FAR 52.219-14. Does the limitation on subcontracting apply to this award? If it does, will software license fees be treated as other direct costs (supplies) rather than services for that calculation?

Thank you for bringing this to our attention this clause will be removed. This solicitation is purposely posted full and open and not set aside.

Question 11:

FedRAMP. The PWS cybersecurity list includes "Obtain FedRAMP certification prior to commencing operation of the system," while the deployed system is planned on Reclamation's on-premise virtualized infrastructure. Does the FedRAMP item apply to an on-premise deployment, or only to a cloud-hosted pilot option?

FedRAMP requirements apply when a cloud-hosted solution is proposed. For solutions deployed entirely on Reclamation-owned or Reclamation-managed on-premises infrastructure, FedRAMP authorization may not be required. All proposed solutions must comply with applicable DOI, Reclamation, FISMA, RMF, and NIST cybersecurity requirements. The project ISSO/Authorizing Official will have final authority to determine the applicability of FedRAMP and other cybersecurity requirements.

Question 12:

Prior work. Is there an incumbent, or has Reclamation run a similar analytics pilot before?

This will be Reclamation’s first analytics pilot.

Question 13:

CLIN dates. The SF 1449 line items show a period of performance of 03/01/2025 to 02/28/2026 and delivery 02/28/2026, while the synopsis gives 12/1/2026 to 11/30/2030. Can you confirm the synopsis dates govern?

12/1 is an estimated start date, exact dates will be established before award. The other dates listed in the 1449 have been updated to clarify the estimated start date still being 12/1. Ideally this contract will begin immediately after award.

Question 14:

SF 1449 identifies an overall performance period beginning December 1, 2026, but individual line items contain earlier dates. Could you confirm the correct periods of performance for the base and option years?

12/1 is an estimated start date, exact dates will be established before award. The other dates listed in the 1449 have been updated to clarify the estimated start date still being 12/1. Ideally this contract will begin immediately after award and the options will be one year after the start date of the contract.

Question 15:

Would the Government accept a quotation from a systems integrator proposing an established commercial AI/ML platform supplied and supported through a qualified technology partner, provided the proposed team satisfies the solicitation requirements?

Vendor must supply qualification and experience as listed in section 7 of the vendor’s customers and employees.

Question 16:

Could you confirm whether the subcontracting-plan template must be submitted with the initial quotation by a small business offeror, or only upon request if applicable?

The subcontracting template must be submitted if you plan to have a subcontractor.

Question 17:

Following up on our question of November 4 on 140RR027Q0029: may the Factor 3 experience and the nine customer references be those of the manufacturer of the proposed commercial system, rather than the offeror's own prior contracts? The answer decides how we put together our quote ahead of the November 17 close.

Experience and customer references submitted under Factor 3 may be those of the manufacturer of the proposed commercial system. Offerors shall clearly identify the relationship between the Offeror and the manufacturer and describe the manufacturer's role in contract performance under the subcontractor form in the solicitation. The Government will evaluate the submitted experience and references in accordance with the solicitation evaluation criteria.

Question 18:

Before determining whether to pursue a response, could you confirm the designated channel and deadline for solicitation questions and whether a specialist small analytics consulting firm may participate as a subcontractor or teaming member? We will follow the solicitation’s official instructions for all questions and any offer.

As indicated in amendment 2 final questions were to be submitted on 11/18.

Yes. Any size firm may participate as a subcontractor or teaming member. However, the prime contractor will remain responsible for all contract performance and for ensuring compliance with all contract requirements.

All quotations must be submitted to brittney_murphy@ios.doi.gov no later than 11:30 PM Mountain Time on November 30, 2026, in accordance with the solicitation instructions. Late submissions will not be considered.

Question 19:

Also Clause 52.219-14 appears even though this doesn’t appear to be a set-aside. Can you confirm whether there is a set-aside requirement for this?

Thank you for bringing this to our attention this clause will be removed. This solicitation is purposely posted full and open and not set aside.

Question 20:

Q. The RFP states that the Bureau is looking for a solution delivered into USBR owned IT systems. Does this include Bureau controlled cloud infrastructure, or is it limited to on-prem servers? If cloud is an option, can the Bureau please provide a list of approved cloud providers?

Limited to a VM running on On-prem servers.

Question 21:

Q. Does the Bureau have any existing approved Large Language Model (LLM) providers (i.e. OpenAI, Anthropic, Google, etc.). If not, does the Bureau have the ability to provision GPUs, RAM, and disk space to support open source models? We can provide technical specifications for a range of model options, depending on what the Bureau can support.

Limited to a VM running on On-prem servers. Please provide technical specifications required for the system you are proposing

Question 22:

Given our relevant experience supporting DOI and our status as an Indian Small Business Economic Enterprise (ISBEE), I wanted to inquire whether an ISBEE set-aside was considered as part of the acquisition strategy for this requirement?

Due to the specialized nature of hydroelectric generating units, the Government requires vendors with demonstrated hydropower expertise and experience with hydropower-specific operating conditions and failure modes.

Based on the results of the market research and coordination with SBA officials, the acquisition was determined to be appropriate for full and open competition. We will not be reconsidering a set-aside at this time.

Question 23:

The SAM.gov notice does not include a statement of work or submission instructions, so we are submitting this capability statement to the point of contact and respectfully requesting the requirement details — scope/SOW, period of performance, and how Reclamation would like responses or quotes submitted — so we can respond in the requested format before the November 19 date.

I am not sure what this question is referring to. The Performance Work Statement (PWS), period of performance, and submission instructions are all included in the solicitation package. All attachments associated with Solicitation No. 140RR027Q0029 are available on SAM.gov.

Several other vendors have submitted detailed questions regarding specific sections of the Performance Work Statement (PWS), which indicates the solicitation documents are accessible and contain the information needed.

Question 24:

Historian Platform & Interface Protocol: Which centralized historian platform/version (for example, AVEVA/OSIsoft PI, Ignition, Wonderware, or SQL/OPC-UA export) will feed the 4 pilot hydroelectric generating units during the Base Year, and will Year 1 pilot evaluation run on historical CSV/Parquet exports prior to full on-premise historian cutover?

See section 4.1.3 for the pilot year.- “Plant data will be hosted on AVEVA PI historian or GE Proficy historian located on Reclamation’s on-premise virtualized infrastructure. For pilot only, transfer of data between the historian and the Data Analytic System can be performed manually. Goal is to minimize the cost of the pilot and to expedite system setup time. For example, software can be implemented on: a) Reclamation owned appliance, b) Reclamation virtual environment, c) Department of Interior cloud environment, d) on a secured commercial or private cloud, or e) a vendor owned appliance loaned to Reclamation.”

See section 4.2.1 for option years – “Deployment of the solution on Reclamation’s on-premise virtualized infrastructure and interfacing the system with AVEVA PI historian or GE Proficy historian located within the same environment. Interface systems to allow automated access to historic and real time data.”

Question 25:

Approximate Sensor/Tag Scale: Approximately how many time-series sensor tags per generating unit (across the 4 pilot units) and what typical sampling frequency should quoters assume when sizing Base Year software licensing and compute requirements?

See section 4.1.2- “Pilot will utilize data from 4 units from 1 powerplant. Each unit has roughly 110 input tags. Four models (such as Generator, Bearings, Turbine) for each unit will be built, trained, deployed, and tested. Total of 440 tags and 16 models.” Sample frequency will vary but should average around 1 point per second.

Question 26:

On-Premise Virtualized Environment: What hypervisor/OS environment (for example, Windows Server or RHEL Linux VMs, Docker/OCI containers, and CPU vs. GPU availability) is standard within Reclamation's on-premise virtualized infrastructure?

Per section 4.1.8.1 - Please provide a detailed description of your proposed equipment and its configuration to implement the hardware and software required for the pilot system. Include what software platforms will be utilized, details on how data will be kept secured, how the software will be installed and maintained, location of software and hardware, list any hardware/software to be supplied by Reclamation, list any hardware/software that will be supplied by the vendor.

Question 27:

Option Years 1-3 Unit Expansion Basis: For Schedule B CLINs 20, 30, and 40, should quoters price continued support for the 4 pilot units or specify a per-additional-unit/plant expansion tier?

Pilot system – 4 units Option year 1 – 4 units (same as pilot) Option year 2 and 3 – 30 units (26 new units plus 4 units from option year 1)

Question 28:

Block 27a of the SF-1449 says FAR 52.212-3 and 52.212-5 are attached, but we couldn't find either in the posted attachments. Could you send them, or confirm whether they're incorporated by reference?

Thank you for bringing this to our attention. As a matter of practice, we often select that block when completing an SF 1449 for commercial acquisitions. However, under the latest RFO, those clauses have been removed and, where applicable, incorporated into other solicitation provisions and clauses.

The Contracting Officer will correct this oversight, and the box will be unchecked in the forthcoming amendment.

Question 29 The introduction to PWS Section 3 asks offerors to use the attached table to address quote information, but I did not find a table among the posted attachments. Is there a response table you would like us to use? If not, may we submit our own requirement-by-requirement compliance matrix in Excel?

Table was attached to Amendment 2 on 11/17/2026.

Question 30 Factor 3 and PWS Section 7 ask for nine references from customers using the proposed system. If the offeror is an integrator offering a manufacturer's COTS product, may those references be the manufacturer's customers for that product? May a single customer count in more than one of the three categories?

Yes a single customer can count in more than one of the three categories.

Question 31 Schedule B asks for a monthly unit price and a yearly total for each CLIN, while PWS Section 6 asks for yearly license fees and labor categories, hours and rates for option-year support services. Should all option-year support be included in the fixed monthly CLIN prices, with the labor rates shown separately for future modifications? May we price to the Schedule B periods?

We would like for both pricing to be provided. The Schedule B gives us a big picture view of the pricing as well as the breakdown version requested in the PWS which will be used to assist during the evaluation phase.

Question 32 PWS 2.5 requires an ATO before the system begins operating, and PWS

3.9.14 lists FedRAMP certification. Does the pilot, with manual data transfer, need a full ATO before it starts, or is the ATO required before the Stage 1 production deployment? Does FedRAMP apply only if a cloud-hosted option is proposed? And will Reclamation provide the independent security assessor, or should offerors include that cost?

ATO Requirement: The Contractor shall support the activities necessary to obtain an Authorization to Operate (ATO) prior to deployment of the system into Reclamation's operational production environment. If the pilot uses manual data transfer and a non-production implementation approach, a full production ATO may not be required before initiating pilot activities. Final ATO requirements will be determined based on the selected architecture and hosting environment and must be met before deployment of the system during Option Year 1. The ISSO/Authorizing Official for this project will have final authority to determine the applicable ATO requirements.

FedRAMP Requirement: FedRAMP requirements apply when a cloud-hosted solution is proposed. Solutions deployed entirely on Reclamation-owned or Reclamation-managed on-premises infrastructure may not be required to obtain FedRAMP authorization. However, all proposed solutions must comply with applicable DOI, Reclamation, FISMA, RMF, and NIST cybersecurity requirements. The project ISSO/Authorizing Official will have final authority to determine the applicability of these requirements.

Security Assessment Costs: Offerors should include all costs associated with cybersecurity compliance, security documentation, assessments, testing, and support required to obtain Government approval of the proposed solution.

Question 33 The PWS says a subcontracting plan must be submitted if the contractor plans to use subcontractors. Does that apply to a small business offeror under NAICS 541512? Since the acquisition is not set aside, could you also confirm that FAR 52.219-14, Limitations on Subcontracting, does not apply?

This clause has been removed.

Question 34:

The Performance Work Statement seeks a proven commercial-off-the-shelf AI/ML platform — will the Government consider a services-led response in which a small business implements, configures, integrates, and provides training, administration, and reporting support around a commercial platform it partners for or resells, or is a quotation from the platform's own publisher the only acceptable response?

The PWS does not require quotations to be submitted by the platform publisher. However, the vendor must demonstrate that its personnel and customer references satisfy the qualifications and experience requirements specified in Section 7.

Question 35:

Can the Government confirm the exact response date and time, and the set-aside status shown on SAM.gov?

Final Response date will be 11/30 11:30 PM MST

Question 36:

For the four-unit pilot, what data formats and approximate volumes should respondents plan around?

See section 4.1.3 for the pilot year.- “Plant data will be hosted on AVEVA PI historian or GE Proficy historian located on Reclamation’s on-premise virtualized infrastructure. For pilot only, transfer of data between the historian and the Data Analytic System can be performed manually. Goal is to minimize the cost of the pilot and to expedite system setup time. For example, software can be implemented on: a) Reclamation owned appliance, b) Reclamation virtual environment, c) Department of Interior cloud environment, d) on a secured commercial or private cloud, or e) a vendor owned appliance loaned to Reclamation.” Data is currently stored in AVEVA PI Historian; therefore, export formats must be compatible with that platform.

See section 4.1.2- “Pilot will utilize data from 4 units from 1 powerplant. Each unit has roughly 110 input tags. Four models (such as Generator, Bearings, Turbine) for each unit will be built, trained, deployed, and tested. Total of 440 tags and 16 models.” Sampling frequency will vary by tag but is expected to average approximately one data point per second.

Question 37:

May a prime offeror rely on its proposed software partner’s product experience and customer references to satisfy the stated evaluation requirements?

The vendor must provide documentation demonstrating that its personnel and customer references meet the qualifications and experience requirements specified in Section 7. In addition to this contractors that will have a subcontractor are required to complete the subcontractor plan.

Question 38:

Are there any restrictions on teaming arrangements involving a software provider and an implementation subcontractor?

The PWS does not restrict teaming arrangements or the selection of software providers. However, the vendor must demonstrate that its personnel and customer references meet the qualifications and experience requirements specified in Section 7.

Question 39:

Attachment B asks for a Y or N for each requirement. Where a requirement is met through configuration, a partner product, or a planned release, may offerors add a short comment next to the Y or N to explain how it is met? If not, should a requirement that is met only in part be marked N?

Yes. Offerors may indicate compliance provided the proposed solution supports PI integration through a standard interface. Include sufficient supporting documentation to demonstrate compliance.

Question 40:

Several Attachment B requirements name AVEVA or PI integration. If the quote offers a product from a manufacturer other than AVEVA that connects to PI through a standard interface, will Reclamation accept a Y for those requirements when the quote documents the interface?

The attachment B must Include sufficient supporting documentation to demonstrate compliance.

Question 41:

The notice doesn't list a set-aside. Is this full and open, or is it set aside for small business?

This is a full and open competition.

Question 42:

Can you share an estimated level of effort or number of hours for the base period, so we can size our pricing against the PWS?

The level of effort is expected to vary among vendors based on their proposed approach, capabilities, and experience. Refer to Section 4 for the project scope and requirements.

Question 43:

Is a quote by email to you acceptable, and does the vendor need an active SAM registration at the time of quote or only at award?

Offerors are not required to have an active SAM registration at the time of quotation submission. However, the prospective awardee must be actively registered in the System for Award Management (SAM) and maintain an active registration through the time of award and throughout contract performance, as applicable.

Question 44:

Will the Government accept a small-business teaming arrangement for any gaps?

The PWS does not restrict teaming arrangements. However, the vendor must demonstrate that the personnel proposed to perform the work, as well as the vendor's customer references, meet the qualifications and experience requirements specified in Section 7.

Question 45:

Requirement R013: may an offeror meet "_______ (13) Contractor will provide the contracting officer with a written explanation if" through a teaming partner or subcontractor?

I am no sure what this question is asking. If you are asking to meet the Contracting Officer to explain? If that is the question the answer is no. The contractor must be a written explanation.

Question 46:

Under Factor 3, can the prime rely on the proposed platform subcontractor’s relevant project experience and customer references to meet the past-performance requirements? Is the prime also expected to show similar projects it performed directly?

The Government will consider relevant project experience and customer references submitted for the proposed platform subcontractor when evaluating Factor 3, provided the quotation clearly identifies the subcontractor's role in contract performance. Offerors should clearly describe the relationship between the prime contractor and subcontractor and how the subcontractor's experience relates to the proposed solution.

Question 47:

Can the same customer reference count in more than one category if it meets the criteria for fleet-wide monitoring, PI Historian integration, or current hydrogenerator use?

Yes. The same customer reference may be used to satisfy multiple experience requirements in Section 7, provided the reference meets the criteria applicable to each requirement.

· The vendor shall provide references for 3 customers that are using the system for centralized fleet wide monitoring with at least 10 units monitored per customer.

· The vendor shall provide reference for 3 customers that are using the system with a PI historian.

· The vendor shall provide reference for 3 hydrogenerator customers that are using the system.

Question 48:

Does FAR 52.219-14 apply to an award under this unrestricted RFQ to an offeror that does not claim the HUBZone price evaluation preference?

No this clause has been removed.