Reach_21_Booster_Site_Visit_meet_up_location_change_4Nov26_0001.pdf
PDF 20 MB Posted
- Attached to
- NGWSP Cutter Lateral Reach 21 Booster Plant
- Solicitation number
- 140RR027B0004
About this file
This document is an internal email communication regarding a site visit for the Reach 21 Booster project. Kevin Drechsel, an Engineering Technician with the Bureau of Reclamation, notified Philoma Singer at the Department of Interior regarding the scheduled site visit location and details.
The site visit is scheduled for November 12, 2026, at 9:00 a.m. at the Cutter Lateral Water Treatment Plant, located at 323 County Road 7575, Bloomfield, New Mexico 87413. The email includes an aerial map image showing the project area with marked routes and water infrastructure features in the region, indicating the geographic scope of the Reach 21 Booster initiative in the Four Corners area of New Mexico.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .