This document is a pre-bid conference site tour presentation for the Navajo-Gallup Water Supply Project (NGWSP) Reach 21 DZ Booster Pump Plant and Tank, scheduled for November 12, 2026. The NGWSP is a $2.4 billion Bureau of Reclamation project that began construction in June 2012 and is scheduled to end in December 2028. The project encompasses 300 miles of pipelines (20"-48" diameter), two conventional water treatment plants with capacities of 5 and 38 MGD, 19 pumping plants, 13 turnout buildings, and numerous storage tanks across two main laterals (Cutter and San Juan).

The Reach 21 DZ Booster Pump Plant and Tank work involves installation of a pre-engineered concrete booster pump station with foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing, and pipe connections; installation of a secondary 500,000-gallon regulation tank at Regulation Tank No. 3 site with foundation, electrical equipment, yard pipe, and pipe connections; replacement of gravel surfacing at Regulation Tank No. 3; erosion and scour restoration including a retaining wall, swale, runoff channel, and site regrading; and SCADA equipment installation. The booster station will connect the Reach 21 supply pipe to the ENWP Phase 3 delivery pipe and includes pumps, piping, valving, building facilities, chain link fencing with vehicle access gates, electrical power, SCADA and radio communications, and erosion control features. The project site is located at coordinates 36.4027, -107.8389 near Dzilth-Na-O-Dith-Hle, New Mexico, approximately 5-6 minutes driving distance via NM 7575 and County Road 325. The Job Hazard Analysis identifies hazards related to travel, outdoor weather conditions, uneven terrain, wildlife, and water safety, with emergency response procedures designating San Juan Regional Medical Center in Farmington, New Mexico as the nearest hospital.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navajo-Gallup Water Supply Project (NGWSP)

November 12, 2026

Reach 21 DZ Booster Pump Plant and Tank Pre-Bid Conference Site Tour

Agenda

• Introduction

• NGWSP Overview

• Reach 21 DZ Booster Pump and Tank Locations and Scope

• Procurement Requirements

• Travel Plan

• JHA

• Questions

• Adjourn

NGWSP Background

• Description

• Currently estimated at $2.4 Billion

• 2 Main Laterals (Cutter and San Juan) totaling 300 miles of Pipelines (20”-48”)

• 2 Conventional Water Treatment Plants with ultimate capacity of 5 & 38 MGD

• 19 Pumping Plants -- raw and finished water

• 13 Turnout Buildings

• Numerous Storage Tanks

• Construction began in June 2012

• Scheduled to end in December 2028

Project Overview Map

Cutter LateralSan Juan

Lateral

Operational Completed Under Construction In Design Subject Project in Solicitation (As of November 2026)

FCWR

Reach 1 San Juan Lateral WTP

Shiprock Connection

Intake Pumping Plant

Block 2-3

CLWTP

CrownpointWindow Rock

City of Gallup

Reach 21 DZ Booster PP and Tank

DZ Booster and Tank Location

• Temporary inline booster installed in 2020.

• Reg Tank 3 operating with minimum water surface elevation of 20-ft

• 17-ft needed for DZ Distribution Tanks

DZ Dist Tanks DZ Reg Tank Reg Tank 3DZ Carson System

20’

4.5’

• Reg Tank 3 base elevation built 15.5-ft lower than DZ tanks

• 15.5-ft of water in Reg Tank 3 = 0-ft in DZ Reg Tank

Issues and Goals

Presenter Notes Presentation Notes 20’ of water in Reg tank 3 = 4.5’ of water in DZ Reg Tank Booster line allows 17’ to be achieved

Summary of Work

• Pre-engineered concrete booster pump station, concrete foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing, and pipe connections.

• Installation of secondary regulation tank at Regulation Tank No. 3 site, foundation, electrical equipment, yard pipe, and pipe connections.

• Replacement of gravel surfacing at Regulation Tank No. 3 site.

• Erosion and scour restoration/prevention:

• Includes a retaining wall, swale, runoff channel, and site regrading.

• Supervisory Control and Data Acquisition (SCADA) equipment.

DZ Booster PP Features

• Pumps, Piping, and Valving

• Building with Foundation

• Connection to Reach 21 pipe (supply)

• Connection to ENWP Ph 3 pipe

(delivery)

• Chain link fence with vehicle access gates

• Electrical Power

• SCADA and Radio Communications

• Erosion control features

Reg. Tank 3 Features

• New 500,000 gal Tank

• Foundation

• Piping and Valving

• Resurfacing with gravel

• Cathodic Protection

• SCADA and Radio Comm.

• Erosion control features

Travel Plan

Coordinates:

36.4027, -107.8389

Job Hazard Analysis

Navajo-Gallup Water Supply Project (NGWSP)
Agenda
NGWSP Background
Project Overview Map
DZ Booster and Tank Location
Slide Number 6
Summary of Work
DZ Booster PP Features
Reg. Tank 3 Features
Travel Plan
Job Hazard Analysis
Job Hazard Analysis
Job Hazard Analysis
Slide Number 14

File details come from the government source that posted it. Updated .