Question_and_Answers_0002.pdf

PDF 2 MB Posted

Attached to
YELLOWTAIL FIBER Federal contract opportunity
Solicitation number
140R8123R0001
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to YELLOWTAIL FIBER, newest first.
File Type Posted
Sol_140R8123R0001_Amd_0002.pdf PDF
140R8123R0001_v2_0001.pdf PDF
140R8123R0001_v2.pdf PDF
Sol_140R8123R0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R8123R0001

Yellowtail Fiber

Questions and Responses

1. Are there any photos of exis ng condi ons? Currently there are not exis ng photos. A site survey at vendor cost is highly recommended. It’s expected that much of the area to be trenched will be surrounded by granite and hard rock.

a. Outside

b. Building

c. Road crossing

d. Termina on loca on

2. Are we only installing LC patch panels at termina on loca ons? Or do we need to provide addi onal equipment. LC termina ons, fiber tes ng and patch panels. Reclama on will provide all other equipment.

3. Is there a standard depth the conduit/innerduct needs to maintain? This is an unknow to us, if there are any laws or regula ons those will need to be followed.

4. Is there a requirement for marking tape above conduit during backfill? Not sure what this is?

5. Will exis ng buried services(water, power, sewer, etc.) be located and marked with paint? Reclama on will have exis ng u li es marked.

6. POP is 4/2/23 – 4/2/24, this should take 3‐4 weeks depending on site condi ons. Are we able to schedule work any me within the POP? Yes, we did a one year POP due to weather, ground condi ons and the current manufacturing and shipping lead mes across all industries.

Visitor to Ware house, red line on image

Warehouse to

Gate Same trench, green line on image

Warehouse to Gate additional trench, blue line on image

507.89 180.33 76.4

205.16 281.57 1488.14

720.64 1230.38 370.65

113.49 1692.28 85.8

242.38 41.53

173.05 2062.52

57.35

263.87

73.67

65.43

307.88

283.34

827.64

127.67

143.7

94.91

345.43

109.37

74.03

456.77

94.36

75.01

364.42

145.46

1230.38

281.57

180.33

7565.2

11320

14150

Notes:

Trench from Visitor Center to Warehouse.

Trench from Warehouse to Employee Gate.

Install conduit for fiber optic cable.

Install 24 strand Single Mode Fiber Optic Cable and terminate all ends and test all fiber strands.

Fill trench and replace asphalt.

Lenght in feet. Calculated from Google Earth.

Total

Total with 25% Error

Lengths and 25% error are estimates based off of google maps.

File details come from the government source that posted it. Updated .