Question_and_Answers_0002.pdf
PDF 2 MB Posted
- Attached to
- YELLOWTAIL FIBER Federal contract opportunity
- Solicitation number
- 140R8123R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R8123R0001_Amd_0002.pdf | ||
| 140R8123R0001_v2_0001.pdf | ||
| 140R8123R0001_v2.pdf | ||
| Sol_140R8123R0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R8123R0001
Yellowtail Fiber
Questions and Responses
1. Are there any photos of exis ng condi ons? Currently there are not exis ng photos. A site survey at vendor cost is highly recommended. It’s expected that much of the area to be trenched will be surrounded by granite and hard rock.
a. Outside
b. Building
c. Road crossing
d. Termina on loca on
2. Are we only installing LC patch panels at termina on loca ons? Or do we need to provide addi onal equipment. LC termina ons, fiber tes ng and patch panels. Reclama on will provide all other equipment.
3. Is there a standard depth the conduit/innerduct needs to maintain? This is an unknow to us, if there are any laws or regula ons those will need to be followed.
4. Is there a requirement for marking tape above conduit during backfill? Not sure what this is?
5. Will exis ng buried services(water, power, sewer, etc.) be located and marked with paint? Reclama on will have exis ng u li es marked.
6. POP is 4/2/23 – 4/2/24, this should take 3‐4 weeks depending on site condi ons. Are we able to schedule work any me within the POP? Yes, we did a one year POP due to weather, ground condi ons and the current manufacturing and shipping lead mes across all industries.
Visitor to Ware house, red line on image
Warehouse to
Gate Same trench, green line on image
Warehouse to Gate additional trench, blue line on image
507.89 180.33 76.4
205.16 281.57 1488.14
720.64 1230.38 370.65
113.49 1692.28 85.8
242.38 41.53
173.05 2062.52
57.35
263.87
73.67
65.43
307.88
283.34
827.64
127.67
143.7
94.91
345.43
109.37
74.03
456.77
94.36
75.01
364.42
145.46
1230.38
281.57
180.33
7565.2
11320
14150
Notes:
Trench from Visitor Center to Warehouse.
Trench from Warehouse to Employee Gate.
Install conduit for fiber optic cable.
Install 24 strand Single Mode Fiber Optic Cable and terminate all ends and test all fiber strands.
Fill trench and replace asphalt.
Lenght in feet. Calculated from Google Earth.
Total
Total with 25% Error
Lengths and 25% error are estimates based off of google maps.
File details come from the government source that posted it. Updated .