Environmental Chambers Retrofit Federal contract opportunity
Solicitation number
140R8121R0008
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document provides details on a federal solicitation for environmental chambers retrofit services. Solicitation number 140R8121R0008 was issued by the Department of the Interior Bureau of Reclamation seeking offers to retrofit environmental chambers located in Denver, Colorado. Offerors are required to provide all labor, materials, equipment, tools, supervision and other items and services necessary to retrofit the environmental chambers. The solicitation does not specify pricing terms, response dates, or award timing. The opportunity is designated for all offerors and does not contain any set-aside provisions.

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Chambers Retrofit, newest first.
File Type Posted
Sol_140R8121R0008_Amd_0004.pdf PDF
SF24_Bid_Bond_0004.pdf PDF
140R8121R0008_0004_0004.pdf PDF
Sol_140R8121R0008_Amd_0003.pdf PDF
Sol_140R8121R0008_Amd_0002.pdf PDF
Sol_140R8121R0008_Amd_0001.pdf PDF
Sol_140R8121R0008.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environmental Chambers Retrofit

Denver, Colorado Solicitation No. 140R8121R0008

U.S. Department of the Interior Bureau of Reclamation Acquisition Operations Branch Denver, Colorado July 2021

This solicitation issued by Amanda Somerville Contracting Officer

Acquisition Operations Branch Bureau of Reclamation Denver Federal Center

6th & Kipling Denver CO 80225

Phone inquiries regarding this solicitation should be made to Amanda Somerville

Telephone Number: (303) 445-2515

Work is located at Building 56 at the Denver Federal Center located at 6th & Kipling in Denver, Colorado (Jefferson County). The principal components include retrofitting of controlled-environment chambers by renovation to re-establish a reliable, current state of the practice for the chambers to fulfill current testing program needs and to be adaptable for future unforeseen testing needs.

140R8121R0008 Environmental Chambers Retrofit

PART I THE SCHEDULE ..................................................................................................... A-1

SECTION A SOLICITATION/CONTRACT FORM ........................................................ A-2

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ..................................... B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ................ C-1

SECTION D PACKAGING AND MARKING .................................................................. D-1

SECTION E INSPECTION AND ACCEPTANCE ............................................................E-1

E.1. 52.236-5 Material and Workmanship (Apr 1984) .....................................................E-1

E.2. 52.246-12 Inspection of Construction (Aug 1996)....................................................E-1

E.3. 52.246-21 Warranty of Construction (Mar 1994) .....................................................E-1

SECTION F Section F Deliveries and Performance ........................................................... F-1

F.1. 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)...... F-1

F.2. 52.211-18 Variation in Estimate Quantities (Apr 1984) ........................................... F-1

F.3. 52.242-14 Suspension of Work (Apr 1984) .............................................................. F-1

SECTION G CONTRACT ADMINISTRATION .............................................................. G-1

G.1. Government Point of Contact ................................................................................... G-1

G.2. 1452.201-70 Authorities and Delegations ................................................................ G-1

G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice

Processing Platform (IPP) ................................................................................................... G-1

G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and

Limitations – Bureau of Reclamation (May 2018).............................................................. G-2

SECTION H SPECIAL CONTRACT REQUIREMENTS................................................. H-1

H.1. DOI-AAAP-0050 Contractor Performance Assessment Reporting System (Feb 2015)

…………………………………………………………………………………… H-1

H.2. Executive Order 13991 on Protecting Worker Health and Safety (Jan 2021)…... H-2

PART II CONTRACT CLAUSES .......................................................................................... I-1

SECTION I CONTRACT CLAUSES .................................................................................I-1

I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) ..........................................I-1

I.2. 52.202-1 Definitions (Nov 2013) ...............................................................................I-1

I.3. 52.203-3 Gratuities (Apr 1984) ..................................................................................I-1

I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) .........................................I-1

I.5. 52.203-6 Restriction on Subcontractor Sales to the Government (Sep 2006)............I-1

I.6. 52.203-7 Anti-Kickback Procedures (May 2014) ......................................................I-1

I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper

Activity (May 2014) ..............................................................................................................I-1

I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) ..... I-1

I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Actions (Oct 2010)

………………………………………………………………………………………I-1

I.10. 52.203-13 Contractor Code of Business Ethics and Conduct (Oct 2015) ..............I-1

I.11. 52.203-14 Display of Hotline Poster(s) (Oct 2015) ................................................I-1

I.12. 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform

Employees of Whistleblower Rights (Apr 2014) ..................................................................I-1

I.13. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (Jan 2017)............................................................................................................I-1

I.14. 1452.203-70 Restrictions on Endorsements – Department of Interior (Jul 1996) ..I-1

I.15. 52.204-4 Printed or Copied Doubled-Sided on Postconsumer Fiber Content Paper

(May 2011) ............................................................................................................................I-1

I.16. DOI-AAAP-0081 Security Requirements: Facility Access Information Technology

(Aug 2016).............................................................................................................................I-1

I.17. 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) ........I-6

I.18. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(Oct 2018) ..............................................................................................................................I-6

I.19. 52.204-12 Unique Entity Identifier Maintenance (Oct 2016).................................I-6

I.20. 52.204-13 System for Award Management (Oct 2018)..........................................I-6

I.21. 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016) ....I-6

I.22. 52.204-19 Incorporation by Reference Representations and Certifications

(Dec 2014)………………………………………………………………………………….I-6

I.23. 52.204-21 Basic Safeguarding of Covered Contract Information Systems

(Jun 2016)…………………………………………………………………………………..I-6

I.24. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) ..............I-6

I.25. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services and Equipment (Aug 2019) ................................................................I-6

I.26. 1452.204-70 Release of Claims – Department of Interior (Jul 1996).....................I-6

I.27. 52.209-6 Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) .........................I-6

I.28. 52.209-9 Updates of Publicly Available Information Regarding Responsibility

Matters (Oct 2018).................................................................................................................I-6

I.29. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations

(Nov 2015)……………………………………………………………………….…………I-6

I.30. 52.215-2 Audit and Records – Negotiation (Oct 2010) .......................................... I-6

I.31. 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997) .................I-6

I.32. 52.215-10 Price Reduction Defective Cost or Pricing Data (Aug 2011)................I-6

I.33. 52.215-11 Price Reduction Defective Cost or Pricing Data – Modifications

(Aug 2011)…………………………………………………………………….….I-6

I.34. 52.215-12 Subcontractor Cost or Pricing Data (Oct 2010).....................................I-6

I.35. 52.215-13 Subcontractor Cost or Pricing Data – Modifications (Oct 2010) ..........I-6

I.36. 52.215-15 Pension Adjustments and Asset Reversions (Oct 2010) .......................I-6

I.37. 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997) .......................I-6

I.38. 52.215-18 Reversion of Adjustment of Plans Postretirement Benefits (PRB) Other

Than Pensions (Jul 2008) ......................................................................................................I-6

I.39. 52.215-19 Notification of Ownership Changes (Oct 1997)....................................I-7

I.40. 1452.215-70 Examination of Records by the Department of Interior (Aug 1996)

(Deviation)………………………………………………………………………………….I-7

I.41. 52.219-6 Notice of Total Small Business Set-Aside (DEVIATION 2019-01) ....... I-7

I.42. 52.219-8 Utilization of Small Business Concerns (Oct 2018)................................I-7

I.43. 52.219-14 Limitations on Subcontracting (DEVIATION 2019-01).......................I-7

I.44. 52.219-28 Post Award Small Business Program Rerepresentation (May 2020) ....I-7

I.45. 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) .......................I-7

I.46. 52.222-3 Convict Labor (Jun 2003)........................................................................I-7

I.47. 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation

(Mar 2018) .............................................................................................................................I-7

I.48. 52.222-6 Construction Wage Rate Requirements (Aug 2018) ...............................I-7

I.49. 52.222-7 Withholding of Funds (May 2014) ..........................................................I-7

I.50. 52.222-8 Payrolls and Basic Records (Aug 2018)..................................................I-7

I.51. 52.222-9 Apprentices and Trainees (Jul 2005) .......................................................I-7

I.52. 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) ...................I-7

I.53. 52.222-11 Subcontracts (Labor Standards) (May 2014).........................................I-7

I.54. 52.222-12 Contract Termination – Debarment (May 2014) ...................................I-7

I.55. 52.222-13 Compliance with Construction Wage Rate Requirements and Relation

Regulations (May 2014) ........................................................................................................ I-7

I.56. 52.222-14 Disputes Concerning Labor Standards (Feb 1988)................................I-7

I.57. 52.222-15 Certification of Eligibility (May 2014) .................................................I-7

I.58. 52.222-21 Prohibition of Segregated Facilities (Apr 2015)....................................I-7

I.59. 52.222-26 Equal Opportunity (Sep 2016)...............................................................I-7

I.60. 52.222-27 Affirmative Action Compliance Requirements for Construction

(Apr 2015)………………………………………………………………………………….I-8

I.61. 52.222-30 Construction Wage Requirements – Price Adjustment (None or

Separately Specified Method) (Aug 2018)……………………………................................I-8

I.62. 52.222-35 Equal Opportunity for Veterans (Oct 2015) .......................................... I-8

I.63. 52.222-36 Equal Opportunity for Workers With Disabilities (Jul 2014) ...............I-8

I.64. 52.222-37 Employment Reports on Veterans (Feb 2016) ......................................I-8

I.65. 52.222-40 Notification of Employee Rights Under the National Labor Relations

Act (Dec 2010) ......................................................................................................................I-8

I.66. 52.222-50 Combating Trafficking of Persons (Jan 2019) ......................................I-8

I.67. 52.222-54 Employment Eligibility Verification (Oct 2015)...................................I-8

I.68. 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) ...............I-8

I.69. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) ..................I-8

I.70. 52.223-2 Affirmative Procurement of Biobased Products Under Service and

Construction Contracts (Sep 2013) ........................................................................................ I-8

I.71. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) ........I-8

I.72. 52.223-6 Drug Free Workplace (May 2001) ..........................................................I-8

I.73. 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-

Designated Items (May 2008) ...............................................................................................I-8

I.74. 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration, Equipment, and Air Conditioners (Jun 2016) ...........................................................................................I-9

I.75. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

(Aug 2011).............................................................................................................................I-9

I.76. 52.223-20 Aerosols (Jun 2016)...............................................................................I-9

I.77. 52.223-21 Foams (Jun 2016) ..................................................................................I-9

I.78. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Oct 1992)

……………………………………………………………………………………………..I- 9

I.79. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (Dec 2009) ........I-9

I.80. WBR 1452.223-82 Protecting Federal Employees and the Public From Exposure to

Tobacco Smoke in the Federal Workplace (Dec 2009).......................................................I-10

I.81. 52.225-9 Buy-American – Construction Materials (May 2014)...........................I-10

I.82. 52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008)........................I-14

I.83. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) .................I-14

I.84. 52.228-14 Irrevocable Letter of Credit (Nov 2014)...............................................I-14

I.85. 52.228-15 Performance and Payment Bonds - Construction.................................I-14

I.86. 1452.228-70 Liability Insurance – Department of Interior (Jul 1996) .................I-14

I.87. WBR 1452.228-84 Certification of Representatives for Corporate Sureties

(Jul 1993)…………………………………………………………………………………..I-14

I.88. 52.229-3 Federal, State, and Local Taxes (Feb 2013) ..........................................I-14

I.89. WBR 1452.231-81 Equipment Ownership and Operating Expense (Jul 1998) ...I-14

I.90. 52.232-5 Payment Under Fixed-Price Construction Contracts (May 2014).........I-17

I.91. 52.232-17 Interest (May 2014) .............................................................................I-17

I.92. 52.232-23 Assignment of Claims (May 2014) .....................................................I-17

I.93. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017).....................I-17

I.94. 52.232-33 Payment by Electronic Funds Transfer – System for Award

Management (Oct 2018) ......................................................................................................I-17

I.95. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) .................I-17

I.96. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors

(Dec 2013)………………………………………………………………………………...I-17

I.97. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of

Reclamation (May 2000) ..................................................................................................... I-17

I.98. WBR 1452.232-82 Other Invoice Requirements – Bureau of Reclamation

(Dec 2002)………………………………………………………………………….……..I-19

I.99. 52.233-1 Disputes (Mar 2014), Alternate I (Dec 1991)........................................I-19

I.100. 52.233-3 Protest After Award (Aug 1996) ...........................................................I-19

I.101. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) ...................I-19

I.102. WBR 1452.233-81 Claims Accounting – Bureau of Reclamation (Jul 1993)......I-19

I.103. 52.236-1 Performance of Work by the Contractor (Apr 1984) ............................I-19

I.104. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) ............I-20

I.105. 52.236-6 Superintendence by the Contractor (Apr 1984).....................................I-20

I.106. 52.236-7 Permits and Responsibilities (Nov 1991) ..............................................I-20

I.107. 52.236-8 Other Contracts (Apr 1984) ...................................................................I-20

I.108. 52.236-9 Protecting Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (Apr 1984) ...................................................................................................I-20

I.109. 52.236-10 Operation and Storage Areas (Apr 1984) ............................................I-20

I.110. 52.236-11 Use and Possession Prior to Completion (Apr 1984) ..........................I-20

I.111. 52.236-12 Cleaning Up (Apr 1984) ......................................................................I-20

I.112. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) ..................I-20

I.113. 52.236-14 Availability and Use of Utility Services (Apr 1984) ...........................I-20

I.114. 52.236-15 Schedule for Construction Contracts (Apr 1984) ................................I-20

I.115. 52.236-16 Quantity Surveys (Apr 1984), Alternate I (Apr 1984) ........................I-20

I.116. 52.236-17 Layout of Work (Apr 1984).................................................................I-20

I.117. 52.236-21 Specifications and Drawings for Construction (Feb 1997) .................I-20

I.118. 52.236-26 Preconstruction Conference (Feb 1995) ..............................................I-20

I.119. 1452.236-70 Prohibition of Lead-Based Paint – Department of Interior (Jul 1996)

…………………………………………………………………………………………… I- 20

I.120. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation

(Feb 2000)............................................................................................................................I-20

I.121. WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Feb 2017)

………………………………………………………………………………………..….. I-22

I.122. 52.242-13 Bankruptcy (Jul 1995) .......................................................................... I-34

I.123. 52.243-4 Changes (Jun 2007) ...............................................................................I-34

I.124. 52.243-6 Change Order Accounting (Apr 1984) ..................................................I-34

I.125. WBR 1452.243-80 Modification Proposals– Bureau of Reclamation (Dec 2001)

……………………………………………………………………………………………..I- 34

I.126. 52.245-1 Government Property (Jan 2017) ..........................................................I-35

I.127. 52.245-9 Use and Charges (Apr 2012) .................................................................I-35

I.128. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) ..........................................................................................................I-35

I.129. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) ...................................I-35

I.130. 52.249-14 Excusable Delays (Apr 1984)...............................................................I-35

I.131. 52.252-6 Authorized Deviation in Clauses (Apr 1984) .........................................I-35

I.132. Computer Generated Forms (Jan 1991) .................................................................I-35

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ............J-1

SECTION J LIST OF ATTACHMENTS ........................................................................... J-1

J.1. Department of Labor, General Wage Decision No. CO20210023, Modification No.

2, dated March 4, 2021, 8 pages

J-2. Federal Non-Disclosure Agreement, 3 pages. ................................................... J-1

J.3. Bid Bond, two pages............................................................................................... J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS .................................................. K-1

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS................................................................................... K-1

K. 1. 52.203-2 Certificate of Independent Price Determination (Apr 1985)................... K-1

K. 2. 52.204-8 Annual Representations and Certifications (Mar 2020)........................... K-2

K.3. 52.204-24 Representation Regarding Certain Telecommunications and Video

Surveillance Services or Equipment (Dec 2019)................................................................. K-6

K.4. 52.209-7 Information Regarding Responsibility Matters (Oct 2018) ...................... K-7

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS.........L-1

L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) .................L-1

L.2. 52.204-7 System for Award Management (Oct 2018) ..............................................L-1

L.3. 52.204-16 Commercial and Government Entity Code Reporting (Jul 2016) ............L-1

L.4. 52.211-1 Availability of Specifications Listed in the GSA Index of Federal

Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29

(Aug 1998)………………………………………………………………………………. L-1

L.5. 52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisitions Streamlining and Standardization Information System (ASSIST)

(Apr 2014)…………………………………………………………………………………L-1

L.6. 52.215-1 Instructions to Offerors – Competitive Acquisitions (Jan 2017)................ L-1

L.7. 1452.215-71 Use and Disclosure of Proposal Information – Department of Interior

(Apr 1984) ............................................................................................................................L-6

L.8. WBR 1452.215-81 General Proposal Instructions – Bureau of Reclamation

(Mar 2021)………………………………………………………………………………….L-8

L.9. 52.216-1 Type of Contract (Apr 1984) ....................................................................L-12

L.10. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment Opportunity for Construction (Feb 1999) ..........................................L-12

L.11. 52.222-56 Certification Regarding Trafficking of Persons Compliance Plan

(Mar 2015)…………………………………………………………...……………L-14

L.12. 52.225-10 Notice of Buy American Requirement – Construction Materials

(May 2014)………………………………………………………………………..L-14

L.13. 52.228-1 Bid Guarantee (Sep 1996) .......................................................................L-14

L.14. 1452.233-2 Service of Protest – Department of Interior (Deviation) (Aug 1996)

…………………………………………………………….……………………….L-14

L.16. WBR 1452.233-82 Notice of Proposed Partnering (May 1994)..........................L-14

L.17. 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995) ............L-14

L.18. 52.236-28 Preparation of Offers – Construction (Oct 1997) ...............................L-15

L.19. 1452.236-71, Additive and Deductive Items – Department of Interior (Jul 1997)

…………………………………………………………………………………………....L- 15

L.20. 52.252-5 Authorized Deviation in Provisions (Apr 1984)...................................L-15

SECTION M EVALUATION FACTORS FOR AWARD ................................................ M-1

M.1. WBR 1452.215-80 Source Evaluation and Selection Procedures – Bureau of

Reclamation (Mar 2021) .....................................................................................................M-1

M.2. WBR 1452.215-82 Evaluation for Award – Quality Predominance – Bureau of

Reclamation (Mar 2021)……………………………………………………………..……M-1

M.3. WBR 1452.225-82 Notice of World Trade Organization Government Procurement

Agreement Evaluations - Bureau of Reclamation (May 2005) ......................................... M-3

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Denver Office

Acquisition Operations Branch Building 67 - Denver Federal Center

R81

MS 84-27810

Denver CO 80225

Amanda Somerville

Contracting Officer asomerville@usbr.gov Electronic Proposals Only

Amanda Somerville

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

303-445-2515

1x 07/27/2021

140R8121R0008

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Environmental Chamber Retrofit

In accordance with FAR 36.204(f), the magnitude for this project is between $250,000 and $500,000.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

14 548 calendar days and complete it within ________________ ________________ calendar days after receiving

________________________ 08/27/2021

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Denver Office

Acquisition Operations Branch Building 67 - Denver Federal Center

R81

MS 84-27810

Denver CO 80225

Amanda Somerville

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R8121R0008

Period of Performance: 09/20/2021 to 03/20/2023

00010 Lab Environmental Chambers Retrofit 1 EA

In accordance with FAR 36.204(f), the magnitude for this project is between $250,000 and $500,000.

Product/Service Code: J066

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- INSTRUMENTS AND LABORATORY EQUIPMENT

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Denver, Colorado Solicitation No. 140R1021R0008

SUPPLIES OR SERVICES AND PRICES/COSTS

CLI

N

Section Supplies or Services

Quantit y and Unit

Unit Price Amount

1 WBR

1452.232-81

Mobilization and preparatory work

For the lump sum of $

7.2 Demolition and

Disposal

For the lump sum of

3 2 Chamber 1 For the lump sum of $

4 2 Chamber 2 For the lump sum of $

2 Chamber 3 For the lump sum of

6 2 Chamber 4 For the lump sum of $

7 2 Chamber 5 For the lump sum of $

8 7.7 Training For the lump sum of $

9 7.6 Commissioning Tests

5 EA $ $

2 Maintenance 12

MO

TOTAL $

Schedule B-2

Denver, Colorado Solicita tion No. 140R1021R0008

Statement of Work C-1

STATEMENT OF WORK

Bureau of Reclamation

Concrete and Structural Laboratory Denver, Colorado

Lab Environmental Chamber Retrofit

1.0 INTRODUCTION:

The Bureau of Reclamation is a water management agency with 600 dams in the 17 western states. We are known best for construction of dams, power plants, and canals, including Hoover Dam on the Colorado River, Grand Coulee Dam on the Columbia River, and Folsom Dam on the American River.

Reclamation is the largest wholesaler of water in the country and second largest producer of hydroelectric power in the western US.

2.0 SCOPE:

Reclamation’s Concrete and Structural Laboratory (CSL) is located at the Denver Federal Center complex at an elevation of 5630 feet above sea level. The CSL has six large controlled-environment chambers, herein referred to as “chambers,” that are housed within a room measuring 49 by 57 feet (Ante Room) within a large single-story temperature-controlled building. The controlled-environment chambers allow great flexibility in the testing of construction materials at various temperatures and humidity. The current chamber dimensions are: five (5) chambers measuring 10x10x8 feet, and one (1) large chamber measuring 15x18x8 feet.

The current chambers were manufactured and constructed in the 1990’s to provide temperature control tolerances and 1990 state of the practice for applicable heating and refrigeration and monitoring and control technologies. Given the age of the equipment and maintenance/repairs, the heating, refrigeration, monitoring, and control technology require renovation to re-establish a reliable, current state of the practice for the environmentally-controlled chambers to fulfill current testing program needs and to be adaptable for future unforeseen testing needs.

Economical Operations and Maintenance (O&M) life-cycle cost requirements of the chambers are critical to maintain reliable operational capability in support of the CSL activities. Details of the existing chambers and their components are provided in Paragraph - 10.0 Background Information. This current system needs to be renovated because they have failed to perform reliably from time of original installation. The new retrofitted configuration should not rely on the previous designs or components of the heating and cooling, control system, or data acquisitions from the existing configuration. Only the existing insulated chambers (walk-ins), building power, and dedicated chiller should be considered for reuse in new configuration. The reuse of any other existing components in the new configuration will require approval by Reclamation.

To the maximum extent possible, the existing insulated prefabricated chambers (walk-ins) will be reused, and modified, if necessary, to meet Reclamation’s needs. It is expected that the existing wall, floor, and ceiling panels of each chamber are adequate and can be retrofitted with updated equipment.

A detailed price-per-chamber proposal, and also indicating price reductions for multiple chamber renovations at one time, are required so Reclamation can determine how many chambers will ultimately

C-2 be retrofitted. It is desired that the retrofitted configuration will retain at least five of the six existing insulated chambers (walk-ins) in their existing locations and encompass the same general boundary conditions. Chamber(s) not retrofitted may remain in place; or may be removed by the contractor if more space for the new configuration is needed. As part of this contract, refrigerant shall be removed and reclaimed/reused/disposed of from all non-retrofitted chambers in accordance with local, state, and federal regulations.

The desired retrofitted configuration includes controlled-environment chambers that operate independently from one another. Reclamation currently has six chambers accessible by the Ante Room, shown in Figure 1. Currently, system components are above the chambers in a confined space, making it difficult to perform maintenance, and the control consoles are large and stand outside each unit impairing forklift mobility. Elimination of one or more of the existing chambers is acceptable as long as operational testing flexibility is maintained within the other chambers. Elimination and removal of an existing chamber to create a centralized area for refrigeration or data acquisition equipment would be considered.

All equipment required for operation of each chamber shall be supplied by the contractor. Each chamber shall be a standalone unit without need of sharing any other equipment, with the exception of the chilled water system provided by a chiller on the exterior of the building. Reclamation may approve the use of shared equipment between multiple chambers if it is a more efficient solution AND, if suitable redundancy is established to maintain reliability of each chamber. All chambers shall maintain a similar configuration, share common parts to the maximum extent possible, and operate from the same type of controls and operating procedures. All components shall have easy access for troubleshooting.

Each chamber shall tie into the existing chilled water system. Note: Reclamation’s 2021 planned maintenance on the existing chiller will include galvanizing the interior and replacing the heater. The chiller is expected to be replaced in-kind around 2028. The specifications of the existing chiller are provided in Attachment A.

Reclamation may perform daily, or periodic, inspections of the work performed for compliance with the approved retrofitted configuration plan and conformance to the specifications. The contractor shall provide access for Reclamation inspectors.

The following functionality, or better, are required:

2.1. For the purpose of this project, naming conventions for the controlled-environment chambers are identified as Chamber 1 through 5 and Large Test, which were previously named on 1990 drawings as CAL 1, CAL 2, and CAL 3, Cold Test, Cold Storage, and Large Test (See Paragraph - 10.0 Background Information Figure 1).

2.2. The chambers are used for a variety of tests, but generally are used for two types of tests:

1) USBR 4911-92 Procedure for Temperature Rise of Concrete (See Temperature Rise

Acceptance Test Requirement Attachment C) to determine the amount of heat generated by a specific concrete mix design without any heat loss occurring over a 56-day period. This test does not require temperatures lower than 50°F but does require precise temperature control.

The tightest temperature control possible is desired in the 50 to 180°F range.

2) Freezing and Thawing testing of construction materials (e.g. concrete samples with ponded water) which is performed using the general temperature tolerance as ASTM C666 Standard Test Method for Resistance of Concrete to Rapid Freezing and Thawing. A tolerance range of 2°F or less is acceptable below 50°F. A lower temperate limit of -20°F is desired. Defrost cycles may be excluded from the time-weighted average.

2.3. Reclamation typically uses 3-wire RTD probes with an insulated wire and BX armored cable to measure specimen temperatures. The new retrofitted configuration shall be capable of connecting to this RTD connector for chamber control. Contractor will provide training regarding the procedure for in-house calibration of these new sensors.

2.4. The table below shows the required temperature ranges and temperature control accuracy desired in each chamber.

Chamber Name (insulated room)

Interior Size (in feet)

Functional Range Temperature Range

Control Tolerance Time Weighted Average)

Chamber 1,2,3,4,6 (Previously named CAL 1, CAL 2, and CAL 3, Cold Test, and Cold Storage)

10 x 10 x 8 Total Range -20 to 180°F Varies with Range

Heat Rise Range 50 to 180°F < 1°F Freezing and Thawing Range

-20 to 50°F < 2°F **

Chamber 5 (Previously named Large Test)

15 x 18 x 8 Total Range -20 to 180°F Varies with Range

Heat Rise Range 50 to 180°F < 1°F Freezing and Thawing Range

-20 to 50°F < 2°F **

*Minimum temperature rate of chagne of 30°F/hour in both increasing and decreasing temperature directions **Defrost cycle may be excluded from the time-weighted average

2.5. The ability to concurrently use a minimum of three chambers for Temperature Rise of

Concrete testing is required. All chambers shall be capable of performing this test in the event one chamber is being serviced.

Statement of Work C-3

C-4

2.6. Suitable redundancy is required to maintain reliability of each chamber.

2.7. The interior size or dimensions of the chambers are not expected to change. Carts and pallet jacks are used to transfer samples into and out of the chambers, so changes to the floor or floor height are not acceptable.

2.8. To the maximum extent possible, the existing insulated chamber boxes (walk-ins) will be reused and modified to meet Reclamation needs. The insulated chamber boxes may be removed and replaced, with Reclamation approval, if the contractor deems removal to be a more cost-effective solution to rebuilding and retrofitting the existing structures.

2.9. Retrofit Configuration Plan Required: Describe and diagram your approach to this retrofit including the make/model of major components involved.

2.10. All the current system’s refrigeration equipment is on top of the chambers in a 45-inch high space and difficult to access and perform maintenance. Ease of access and simplicity of maintenance is a top priority of this project.

2.11. All refrigeration equipment shall be clearly marked on the drawings. All such equipment must be located for convenient maintenance and servicing access. Refrigeration and other equipment noise shall be contained in some manner to minimize the noise transmitted into the Ante Room and be protected from hazards. Any interior rooms, walls or doorways shall match existing and meet GSA requirement, and local and federal codes.

2.11.1 Valving shall be provided for isolation of components to expedite repairs.

2.11.2 The refrigeration equipment shall use refrigerants which are environmentally safe, non-flammable, non-explosive and have a Zero Ozone Depletion Potential (ODP).

Refrigerants should comply with ASHRAE 15 and the International Mechanical code.

2.12. All existing conditioning equipment and assemblies shall be removed and replaced, (or with exceptions for reuse as approved by Reclamation).

2.12.1 For contractor removal of existing equipment, this assembly is currently comprised of the return air duct, the air plenum containing the refrigeration coil, heater, and the air circulating blower, flexible ducts to the air diffusers, and ceiling-mounted diffusers. In the Large Test chamber, the air plenum also contains a dehumidification coil, a humidification spray nozzle, and steam generator for humidity control. This list is not intended to be complete, but to give a general sense of the current configuration.

2.13. All air circulation equipment and existing flexible ductwork shall be removed and replaced with rigid ducting. Duct shall be manufactured and installed per SMACNA 006.

C-5

2.14. All heating system components and assemblies shall be replaced.

2.15. All electrical and electronic control equipment and control cabinets shall be removed and replaced according to the approved retrofitted configuration.

2.15.1 For contractor removal of existing electrical/electronic equipment, a fused disconnect switch is mounted above each chamber within sight of the refrigeration and air circulating equipment. Power is fed from disconnect to the control cabinet located in front of each chamber. The control cabinet contains circuit breakers, motor contactors, relays, and other control equipment. This list is not intended to be complete, but to give a general sense of the existing configuration.

2.15.2 New circuit breakers shall be provided as part of the retrofitting for all major pieces of equipment.

2.16. The retrofit configuration shall include new sensors deemed necessary for the safe operation of the equipment. The sensors and controls must be safely configured to protect personnel as well as the equipment from abnormal conditions.

2.16.1 For contractor removal of existing equipment, the existing sensors include compressor low refrigerant pressure, compressor high refrigerant pressure, compressor low oil pressure, heater high temperature, heater over-current, and blower low air flow. This list is not intended to be complete, but to give a general sense of the existing configuration.

2.17. If standalone controls cabinets are used in the retrofitted configuration, the location must be presented in the proposal and final location approved by Reclamation. Location must not impede regular laboratory traffic or limit cart or pallet jack access to all chambers.

2.18. The retrofitted chambers shall encompass a temperature range of -20 to 180°F with a minimum temperature rate of change of 30°F/hour in both increasing and decreasing temperature directions.

2.19. A defrost system shall be incorporated into the retrofitted configuration. Interruptions to freezing due to defrost cycle are acceptable as long as the approximate cycle time and duration are stated in the proposal.

2.20. Maximize the use of readily available off-the-shelf components or commonly stocked proprietary components for longevity of equipment O&M is required.

2.21. All existing computers along with its control hardware should be removed and replaced by the contractor. The existing control equipment shall be dismantled. The government may retain components of the existing equipment and will do so prior to contractor’s Notice to Proceed.

The contractor shall be responsible for removal and disposition of all remaining equipment.

C-6

2.22. The system shall be controlled using customizable software written in LabVIEW (or similar, easy to learn and configurable software that is designed for laboratory use) which controls each chamber temperature separately and acquires data from the chambers and test specimens to make the temperature adjustments.

2.23. The new controls shall have the capability to automatically run a user-programmed profile.

System shall be able to execute a profile having a minimum of 50 steps and repeat the profile up to 500 cycles. Profiles shall have the capability to set the ramp rate and hold times for each step.

2.24. Controller software shall display the current step and setpoint of a profile being executed.

2.25. The controller shall have the capability to graphically display the setpoint and process value of temperature (historical record of the current control profile).

2.26. The controller shall have the capability to log temperature.

2.27. The data logging function shall have a programmable acquisition rate.

2.28. The controller shall have a USB 2.0, or better, interface and the capability to download logged data to a compatible USB 2.0, or better, storage device.

2.29. Controller software data collection of a minimum of: two (2) inputs from chamber temperature, and four (4) inputs from test specimen(s) temperature(s) is required. The system shall be capable of using any or all of these inputs to control temperature set point.

2.30. The system shall be able to accept digital remote input (for example: for temperature set point or cycle controlling).

2.31. One control system per chamber is required. System shall include an operator interface for controlling the tests and displaying the status and graphs of tests in progress. Remote monitoring of the system and remote alarm notifications are desired.

2.32. Control software and hardware shall NOT collect or process data in a Cloud-based server. All data shall be housed and processed internally to the retrofitted system. Connecting to the internet for updates is NOT acceptable.

2.33. Control hardware should be capable of a data collection rate of greater than or equal to one (1) reading per second. The software should be capable of modifying the rate at which data is written to files to between one data point per second and one data point per ten minutes, as specified by the operator. Data shall be stored in (or be downloadable in) a standard file convention (ASCII text or similar) that allows input, viewing, and/or content manipulation by standard text editors or spreadsheets. The system shall have a digital output for temperature readings.

2.34. Control hardware is required to be the most current version/models of technology at time of installation (no hardware near end-of-design-life or near end-of-warranty will be accepted).

2.35. Submission of multiple controller options and different price points is acceptable/desirable for Reclamation consideration.

2.36. All transducers provided shall be calibrated with their associated readout device and traceable to national standards. This shall include the temperature transducer and controller for all chambers.

2.37. Control Hardware must be Windows-based, and loaded on a PC or Tablet - must be new, not refurbished, and have a 3-year extended warranty.

2.37.1 If control hardware is PC based:

2.37.1.1 The software user interface shall incorporate standard MS Windows conventions (i.e. use of mouse, use of minimize and maximize window functions, tab and arrow keys [to move between fields], enter key [to accept information], function keys, numeric keypad, standard Windows tools such as cut, copy, paste, etc.) where relevant. The user interface shall be internally consistent (i.e. if function key means one thing in one part of that program it shall mean that same thing in another part of the program).

2.37.1.2 Form factor: mid-tower

2.37.1.3 Processor: six core, 3.1 ghz minimum frequency, 12 MB cache, 64-bit capable

2.37.1.4 Memory: 16 gb, DDR4, 3200 mhz minimum frequency

2.37.1.5 Storage: 1 TB, solid state drive, PCIe interface, NVMe host protocol, 1500K/350K sequential read/write, 200K/80K random read/write

2.37.1.6 Graphics: Integrated

2.37.1.7 Optical disk drive: Minimum 8x DVD-ROM 9.5 mm

2.37.1.8 USB: 4 ports minimum total, 2 ports USB 3.0, 1 port USB-C

2.37.1.9 Microphone/Speaker: integrated

Work C-7

2.37.1.10 Power: NEMA 5-15 (Type B) grounded plug, 260-watt minimum 80Plus bronze power supply

2.37.1.11 Networking: 1 gb ethernet

2.37.1.12 Operating System: Windows 10 Pro 64 bit

2.37.1.13 Standard Software: Microsoft Office Home and Business 2019 (not cloud based)

2.37.1.14 Keyboard/Mouse: USB wired, optical mouse, standard size

2.37.1.15 Monitor: 20 inch minimum, LED backlit, LCD, 1080 at 60 hz, HDMI, DisplayPort, VGA interface, Energy Star certified

2.37.2 If control hardware is tablet based, or other, it should include easy to use and intuitive functions:

2.37.2.1 Windows®-based software designed to run an environmental chamber

2.37.2.2 Ethernet and USB for transferring data files via flashdrive or USB Hard Drive, minimum 2 USB ports

2.37.2.3 Touch screen color display, minimum 12-inches

2.37.2.4 Ability to view data graphically

2.37.2.5 Training shall include standard and advanced operating instructions for non-

PC based controllers

2.38. Design and installation shall adhere to the International Building Code, International Mechanical Code, International Plumbing Code and NFPA 70. Equipment shall be energy star rated if available, otherwise shall adhere to ASHRAE 90.1. Commercial/Industrial grade components shall be used throughout. Tying into the building electrical and plumbing systems must be performed by and coordinated with the General Services Administration (GSA) and its contractors. This retrofitted configuration should not interfere with the external walls or ceiling of the building. Use existing chamber room plumbing and electrical penetrations to the maximum extent possible.

2.39. All surplus/decommissioned components of the existing systems will be removed and disposed of by the contactor, including any hazardous material disposal. The removed components shall be recycled to the greatest extent possible.