140R8121R0001 Att 3 PPQ Instructions_4.pdf

PDF 875 KB Posted

Attached to
Architect-Engineer (A-E) AND PROFESSIONAL SERVICES IDIQ Federal contract opportunity
Solicitation number
140R8121R0001
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document contains instructions for completing a past performance questionnaire (PPQ) related to an Architect-Engineer (A-E) AND PROFESSIONAL SERVICES IDIQ solicitation issued by the Bureau of Reclamation within the Department of the Interior. Offerors are required to have their clients complete the PPQ and submit it directly to the offeror to be included with their proposal response. The PPQ instructions define adjective ratings of Exceptional, Satisfactory, Unsatisfactory and Neutral to be used when evaluating an offeror's past performance, and provides descriptions of what each rating indicates in terms of meeting contractual requirements, presence of problems, and corrective actions.

View the file

Other files for this federal contract opportunity

Other files attached to Architect-Engineer (A-E) AND PROFESSIONAL SERVICES IDIQ, newest first.
File Type Posted
140R8121R0001 Att 1 Statement of Work_4.pdf PDF
140R8121R0001 Att 2a PPQ Form Word_4.doc DOC document
140R8121R0001 Att 2 PPQ Form_4.pdf PDF
140R8121R0001 Amendment 0001a_4.docx DOCX document
140R8121R0001 Att 4 Q and A 1_4.docx DOCX document
11) TSC Request for Qualifications SF330 Posting_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Reclamation (BOR) Past Performance Questionnaire (PPQ)

INSTRUCTIONS for Past Performance Questionnaire

Instruction to Offeror:

Offerors are required to complete blocks 1-4 of the Past Performance Questionnaire (PPQ) and shall submit the PPQ directly to their client(s) for their input/completion of the form. The completed PPQ's shall be submitted with the offerors SF330 document.

Instruction to Client:

In completing the PPQ form, the client representative(s) that have direct knowledge of the Offerors past performance are encouraged to complete the PPQ (i.e., Administrative Contracting Officers, Contracting Officer Representatives, Project Engineers, etc., who had direct oversight/involvement with the project).

Please provide responses to the questions (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary).

**Important Submission Information** BOR requests that the client complete this questionnaire and submit directly back to the offeror. The offeror will then submit the completed questionnaire to BOR with their proposal.

The Government reserves the right to verify any and all information on this form.

Page 1 of 2 PPQ Instructions Version 1 - 01.02.2021 rrussell Highlight

Bureau of Reclamation (BOR) Past Performance Questionnaire (PPQ)

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional

Performance rating is very good or better, met contractual requirements and exceeded some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

An Exceptional rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner.

There should have been no significant weaknesses identified.

(S) Satisfactory

Performance and information regarding past performance is acceptable and meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified.

(U) Unsatisfactory

Offeror’s record of relevant past performance and information regarding past performance is marginal to unacceptable. Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Neutral Offeror does not have a record of relevant past performance or information regarding past performance is not available.

Rating will be neither positive nor negative.

Page 2 of 2 PPQ Instructions Version 1 - 01.02.2021

File details come from the government source that posted it. Updated .