Attachment_1__LV_Dewatering_Well_Repair_PWS_Final.pdf
PDF 695 KB Posted
- Attached to
- EC LMDT Dewatering Well #1 Repair
- Solicitation number
- 140R6026Q0046
About this file
This is a Performance Work Statement (PWS) for the repair of Dewatering Well #1 at the Leadville Mine Drainage Tunnel Water Treatment Plant near Leadville, Colorado, owned and operated by the Bureau of Reclamation.
The contractor shall remove and replace the deteriorated well casing screen in a single groundwater pumping well located at pump station 10+25 along the tunnel alignment. The primary task involves removing the existing 100 HP motor and 1500 gpm American Marsh vertical turbine pump, inserting a new 16-inch by 0.500-inch steel sleeve casing approximately 125 feet in length, and installing a Johnson 316 stainless steel screen (16-inch by 10 feet by 0.200 slot with stainless steel bottom plate). The contractor must install a dielectric coupler between the stainless steel screen and steel casing using appropriate welding rods, conduct video inspection of the completed installation, and reinstall the pump and motor. Reclamation staff will disconnect and reconnect motor power connections and handle pump startup. Work must be completed between July 1 and September 30, 2026, during normal business hours (6:30 a.m. to 5:00 p.m., Monday through Friday) at the treatment plant located at 749 Highway 91, Leadville, Colorado. The contractor must provide a Job Hazard Analysis, comply with Reclamation Safety and Health Standards and OSHA standards (29 CFR 1910 and 1926), furnish company experience references for similar projects completed within the last five years, and submit post-installation video documentation and as-built drawings with dimensional data within 30 days of work completion. Required submittals include written certification of insurance within 10 calendar days of award and company experience and past performance documentation submitted with the quote.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECLAMATION – LEADVILLE TUNNEL TREATMENT PLANT
DEWATERING WELL #1 REPAIR
• Pump Motor connections will be disconnected and reconnected by plant staff.
This work must take place approximately between July 1 and September 30, 2026.
PERFORMANCE WORK STATEMENT (PWS)
1.0 SCOPE
1.1 OBJECTIVE
The purpose for this contract is to acquire contractor services to perform dewatering well repair for one groundwater pumping well near Leadville, Colorado. The Leadville Mine Drainage Tunnel Water Treatment Plant, (Leadville treatment plant), 749 Highway 91, owned and operated by Reclamation, is located near Leadville, Colorado in Lake County. Three pumping wells extract contaminated groundwater from the mine drainage tunnel and convey it to the treatment plant headworks via buried piping. Reclamation is soliciting proposals for the replacement of a well casing screen which has deteriorated and is no longer functioning as designed. This well is located at pump station 10+25 along the tunnel alignment, see attached map.
1.2 BACKGROUND
The Leadville plant processes 1.5-2.5 million gallons per day of mine drainage water to remove dissolved zinc, manganese, iron, and other trace metals in accordance with EPA discharge permit standards. Pumping wells provide raw water influent to the treatment plant via vertical turbine pumps controlled by variable frequency drives through the plant programmable logic control system.
Due to poor water quality, the screened portion of Dewatering well #1 casing has deteriorated and must be replaced. The screen is necessary to prevent particulate material from the tunnel interior from being drawn into the dewatering pump with the potential of damaging the pump.
Access to dewatering well stations is via unimproved forested mining roads, within 5 minutes of the treatment plant, and may require four-wheel drive vehicles.
Contractor shall arrive on site with all equipment and personnel to perform the required tasks unless specifically addressed. Equipment will be in good working order set by industry standards in order to avoid any unnecessary impacts to the environment or project delays.
Government furnished property will include only that specifically listed below, the remainder is the responsibility of the contractor.
Labor for all removal, inspection, installation, and screen cleaning work will be performed by vendor(s) as the project requires work and equipment beyond plant capability, with the following exceptions:
140R6026Q0046
2.0 REFERENCES - The following list of documents are required in the performance of this contract:
Number Title and Edition Date Source
1. Dimensional Data for LMDT Dewatering Wells
September 2025 Leadville Plant – provided as attachment
2. LMDT Dewatering Wells location map
May 2017 Leadville Plant – provided as attachment
3.0 TASKS: The contractor shall perform the following tasks:
3.1 TASK 1: Dewatering Well 1 at Station 10+25
• Travel to Leadville Treatment Plant, check in with plant supervisor to review Job Hazard Analysis, and review job plan.
• Mobilize pump rig to 10+25 pump station, approximately 1 mile of unimproved forest road, and set up pump rig.
• Motor will be disconnected by Reclamation staff.
• Remove existing 100 HP motor and 1500 gpm, American Marsh vertical turbine pump
(approximately 120 feet of 8-inch column pipe and shaft/ oil tube) from Well #1. Bring enough cribbing to lay out 20-foot sections of column pipe and shaft tube on ground adjacent to wells.
• Insert sleeve well casing and new screen inside existing 20-inch OD well casing o Casing will be 16-inch x 0.500-inch x approximately 125 feet o Screen will be Johnson screen, 316 stainless steel, 16-inch x 10 feet x 0.200 slot with stainless steel bottom plate o Screen will be situated below casing within tunnel void space between 140 feet (tunnel floor) and 130 feet (tunnel roof) from top of casing.
o Install dielectric coupler between stainless steel screen and steel casing. Use stainless steel welding rod on stainless steel screen side of coupler, and standard carbon steel welding rod on solid steel casing side of coupler.
• Conduct video inspection of completed installation to be provided to Reclamation after completion of work.
• Re-install pump and motor, Reclamation will re-connect power to motor and start-up pump.
4.0 SECURITY
Work shall be performed during regular business hours listed in Normal Business Hours, while plant staff are on site for access to work areas. Hours may be flexible at the discretion of contracting officer and plant supervisor.
5.0 PLACE OF PERFORMANCE
Work shall take place at dewatering well location specified near Reclamation’s LMDT treatment plant, located at 749 Highway 91, Leadville, Colorado (see site map attached). Local point of contact is plant supervisor Jenelle Stefanic, office phone: 719-486-2035, email: jstefanic@usbr.gov.
6.0 PERIOD OF PERFORMANCE
The term of contract performance will be between July 1 and September 30, 2026, following notification to proceed from Contracting Officer. Onsite work will be scheduled and coordinated with the Bureau of Reclamation LMDT Plant Supervisor.
NORMAL HOURS - Between the hours of 6:30 a.m. and 5:00 p.m. Monday through Friday or at the discretion of Contracting Officer and plant supervisor.
7.0 SAFETY
Contractor shall provide Job Hazard Analysis for work to be reviewed and signed by contract personnel on site prior to beginning work. Contractor will be issued a Special Work Permit on arrival and will abide by Reclamation Safety and Health Standards (RSHS) throughout performance of work.
The Contractor shall be responsible for supplying Reclamation with a list of all Subcontractors being used and their safety documentation as mentioned above. The Contractor is responsible for ensuring ALL Subcontractors comply with the requirements set forth in this statement of work, the regulatory standards and the industry standards incorporated by reference.
The RSHS is available at: http://www.usbr.gov/ssle/safety/RSHS/rshs.html
The OSHA standards are available at; www.osha.gov. OSHA Standards in 29 CFR 1910 and 1926 apply to the work within the scope of this Contract.
8.0 COMPANY EXPERIENCE
Company experience is an objective criterion that determines whether the contractor has or has not performed similar work. Therefore, the contractor shall furnish a list (no more than five) of Federal, State, local government, or commercial projects similar in scope, complexity, and magnitude to the work required under this solicitation that the contractor has completed within the last five years.
These projects must clearly demonstrate the contractor’s successful ability to accomplish projects in a timely and satisfactory manner.
140R6026Q0046 mailto:jstefanic@usbr.gov http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.osha.gov/
At a minimum, the contractor shall provide the following information for each project:
• Name of the Customer (Government Agency or Commercial);
• Contract number, type, date, name of project;
• Description of the work performed;
• Initial contract amount and final contract amount; and
• Name, telephone number, and e-mail address of a point of contact for the customer that may be contacted to confirm and verify the information provided.
• The Government may not evaluate references with incorrect or missing phone numbers and contact names, which may potentially result in a less favorable rating of the contractor’s offer.
9.0 PERFORMANCE REQUIREMENTS SUMMARY
Task No. Task Description Performance Indicator
Performance Standard
Minimum Acceptable Quality
Level Section 3.1:
Task 1
Repair / Replace well casing and screen in Dewatering well #1 at Station 10+25
Safe and timely repair or replacement well casing and screen
Restore pumps to full function with no defects or damage to existing equipment
Pump must be fully operational when work is complete
10.0 DATA AND REPORTS - The contractor(s) shall provide the following data and reports:
Item No. Description Content Format Medium Delivery
1. Inspection Video of new screen/ casing installation in Well #1 at Station 10+25.
See Section 3.1 Task 1
Windows media player compatible video
Thumb drive 1 copy to Leadville Plant Supervisor
Due 30 days from work completion
2. As-built documentation, updated Dimensional information
See Section 6.0 Deliverable 2.
Written summary, include applicable drawings or other specifications
MS Word or
1 copy to Leadville Plant Supervisor
Due 30 days from work completion
11.0 DELIVERABLES
The contractor(s) shall submit the following reports in accordance with paragraph 5.0, “DATA
AND REPORTS”:
1. Post-installation video of completed well #1 casing and screen replacement.
2. Provide as-built drawings/ documentation of well with dimensional data within 30 days of completion of field work.
SECTION C- SUBMITTALS
1.1. REQUIRED SUBMITTALS.
Submittals from the contractor are required during the term of the contract to ensure quality and safe work under the contract. Required submittals are as follows:
RSN
Clause Or Section Title Submittals Required Due date or delivery time
No. of sets to be sent to:
CO QAE
Insurance - Work on a Government Installation 52.228-05
Written certification that the required insurance has been obtained
Within 10 calendar days after award
1 0
Liability Insurance 1452.228-70
Acceptable certificate of liability insurance
Within 10 calendar days after award
1 0
3 Section 8 Company Experience
With Quote
1 1
4 Section 9 Company Past Performance With Quote 1 1
1.2. SUBMITTAL REVIEW.
1.2.1. TIME REQUIRED FOR SUBMITTAL REVIEW. Submittal review will require 10 days for review of each submittal or re-submittal, unless otherwise specified. Time required for review of each submittal or re-submittal begins when the Government receives the complete sets of materials required for a particular RSN and extends through the return mailing postmark date.
1.2.2. REVIEWER ADDRESSES. Submittals shall be provided to the following addresses/individuals:
• Contracting Officer (CO): Bureau of Reclamation - MB-5000; Attn: CO; 2021 4th
Avenue North; Billings, MT 59101
• Contracting Officer Representative (COR): Bureau of Reclamation; Leadville Water