SF30_140R6025Q0069_0001.pdf

PDF 1 MB Posted

Attached to
WY AL (2) AIR HOUSING COOLERS REFURBISH
Solicitation number
140R6025Q0069
Issued by

About this file

This document is an Amendment (0001) to Solicitation No. 140R6025Q0069 for the WY Alcova Air Cooler Refurbish project in Alcova, Wyoming. The solicitation is a total small business set-aside procurement issued by the Bureau of Reclamation's Missouri Basin Regional Office, with a period of performance from 09/11/2025 to 03/31/2026. Contractors are required to submit electronic quotes to mhirsch@usbr.gov, with file size limitations of 25MB per email.

The project involves refurbishing air coolers, specifically requiring the creation of comprehensive CAD drawings showing all dimensions, components, and modifications. The air coolers consist of 50 bi-metal tubes with 90/10 copper-nickel inner tubes and extruded aluminum fins, with specific requirements for tube and fin materials. Key logistics include loading via overhead crane or forklift, with a static pressure test required to verify no transport damage. The estimated replacement value of each cooler is $50,000, and contractors must provide 2 weeks' notice and vehicle details for pick-up and delivery, with no additional on-site requirements. This is a supply contract with no removal or installation services.

View the file

Other files

File Type Posted
Alcova_Cooler_Refurb_Q_A_0001.pdf PDF
Amendment_pg2_0001.pdf PDF
Sol_140R6025Q0069_Amd_0001.pdf PDF
Sol_140R6025Q0069.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R6025Q0069 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

R60

Billings MT 59101 2021 4th Avenue North Missouri Basin Regional Office Bureau of Reclamation

08/22/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/12/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See the continuation pages for details.

Period of Performance: 09/11/2025 to 03/31/2026

This solicitation is issued as a total small business set-aside procurement.

Contractors shall submit their quotes electronically by e-mailing their quotes to mhirsch@usbr.gov. Due to server restrictions, file sizes larger than 25MB will require multiple e-mails.

Period of Performance: 09/11/2025 to 03/31/2026

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Michael I. Hirsch

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation No. 140R6025Q0069 Amendment 0001

Description of Changes:

1. Questions and Answers: It is attached to this amendment.

2. Quotation Due Date: The hour and date for receipt of quotes hereby remain unchanged at 28 August 2025, 1430 MDT.

3. Third Party: If you have given a copy of this solicitation to someone else, please forward this amendment accordingly.

4. Acknowledgement Requirement: See Block 11 on the Standard Form 30 form above regarding how to acknowledge this amendment. The Government must receive acknowledgment of each amendment issued under this solicitation at time of your quote submission.

PROJECT TITLE: WY Alcova Air Cooler Refurbish, Alcova, Wyoming

Questions and Answers

Q: What is the value of the air cooler for insurance coverage for pick-up and delivery?

A: Estimate $50,000.00 for the replacement of each cooler.

Q: Is there any security requirements for pick-up and delivery?

A: Provide 2 weeks' notice and a description of the vehicle with a POC that will be in the vehicle. There are no other requirements to be on-site.

Q. Verify that this performance of work does not include installation?

A: Correct - This is a supply contract that requires no removal or installation.

Q. Could more details of Tube Support Plate Grommets be had? Could you provide a close-up picture of this?

A: Pictures attached below. This appears just to be a port in which multiple fins are supported about 1” in length.

Q. Fin attachment to tube process or style is not noted. Is there a requirement for this? Or a really close-up picture.

A: Finned Tubes:

1. Consisting of bi-metal tubes with the following properties:

a. Inner tube: 90/10 copper-nickel alloy in accordance with ASTM B111.

b. Outer tube:

1) Aluminum from which the integral fins are extruded and continuously mechanically bonded to the inner tube.

2) Aluminum purity of not less than 99.5 percent.

2. With extruded aluminum fins, allow a 3/8-inch gap at each end to prevent aluminum fins from contacting the copper alloy tube sheets.

Q. Fin material is not specified. Is there a requirement for this?

A: See previous answer. Aluminum purity of not less than 99.5 percent.

Q. 10 of the noted “50” tubes look to be of a different size or configuration. Can this be verified.

A: Tubes are "belled" at one end to allow for the removal of individual tubes for replacement. The opposite end would show 40 small (1") openings with 10 larger openings (Approximately 1.75" OD)

Q. Specs. and references to measuring tape in pictures denote possible “Belling” of tube ends larger than 1” OD. It seems that the opening is larger than 1”

A: Correct. Tubes are belled to allow the removal of finned tubes individually— approximately 1.75" OD.

Q. How will air cooler be loaded from facility?

A: Overhead Crane or forklift.

Q. Is there a loading dock available?

A: Not at this facility.

Q. Will testing be performed at the plant to replicate the operational environment needed to test as requested?

A: The only testing required at the plant is a static pressure test only to verify no damage occurred during transport as described in the solicitation and work statement.

Q. Will CAD drawings be required if no modifications need to be made for the refurbishment?

A: Yes. There are currently no existing drawings for these coolers.

Q. Could you please expound on drawing needs?

A: This includes electronic copies of a complete CAD-generated schematic showing all necessary dimensions, components, and modifications to coolers. Drawings include dimensioned individual components as well as dimensioned assembled views of the coolers.

File details come from the government source that posted it. Updated .