Amendment_No__0001_0001.pdf
PDF 3 MB Posted
- Solicitation number
- 140R6022Q0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R6022Q0012_Amd_0001.pdf | ||
| Sol_140R6022Q0012.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R6022Q0012 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
03/22/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/01/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Darlene Dillon
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Title: WY-Control of Noxious Weeds for the Wyoming Area Office and Surrounding Areas
Please submit Quotations via email to Contracting Officer Darlene Dillon at email address
DDillon@usbr.gov.
This purchase order will have a base year and four (4) option periods and an option period for a six month extension.
CONTRACTORS MUST COMPLETE ALL (PRICE) LINE ITEMS AND PROVIDE A TOTAL OF ALL (PRICE)LINE ITEMS ON THIS AMENDMENT No. 0001/OPTIONAL FORM(S) 336. FAILURE OF CONTRACTORS' COMPLETION TO PROVIDE ALL (PRICE) LINE ITEMS AND THE TOTAL OF ALL PRICE LINE ITEMS ON THE OF 336(s) MAY BE FOUND Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X 1 electronic
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 15CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R6022Q0012/0001
NON-RESPONSIVE. PLEASE ENSURE TO COMPLETE WITH
SIGNATURE BLOCKS 15A, 15B, and 15C on page 1 (of the Standard Form 30)on this amendment.
Quotations will be evaluated in accordance with
52.212-2 Evaluation-Commercial Items, which is provided within this solicitation.
NOTE: Effective October 26, 2018, contractors interested in doing business with the Federal
Government must be registered in the System for
Award Management (SAM) database at www.SAM.gov.
Beginning April 4, 2022, the new Unique Entity ID from SAM.gov will be the official, government-wide identifier used for federal awards.
NOTE: Contractors must submit their Tax
Identification Number, Data Universal Number
(DUNS) and Unique Entity ID with their quotation.
Tax Identification Number
Data Universal Number
(DUNS)_________________________
Unique Entity ID
SEE THE FOLLOWING PAGES FOR ALL ITEM NUMBERS.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00010
00020
00030
00040
00050
00060
00070
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Casper Mountain East Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Casper Mountain West Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Sybrant Microwave Site-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Pine Ridge Microwave Site-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Sand Draw Microwave Site-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Mills Office Area-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Alcova Dam, Powerplant, Warehouse-ACCORDING TO THE PERFORMANCE WORK
STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
4 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00080 Base Period: Gray Reef Dam-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
00090 Base Period: Seminoe Camp, Dam, and
Road-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
00100 Base Period: Pathfinder Dam & Dike-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
00110 Base Period: Miracle Mile Area-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
00120
00130
00140
Base Period: Kortes Dam and Road-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Base Period: Pathfinder Interpretive
Trail-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
Period of Performance: 05/01/2022 to 04/30/2023
Option Period One: Casper Mountain East
Microwave Site-ACCORDING TO THE PERFORMANCE WORK
STATEMENT AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
5 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00150
00160
00170
00180
00190
00200
00210
Option Period One: Casper Mountain West
Microwave Site-ACCORDING TO THE PERFORMANCE WORK
STATEMENT
AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Sybrant Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Pine Ridge Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Sand Draw Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Mills Office Area-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Alcova Dam, Powerplant, Warehouse-ACCORDING TO THE PERFORMANCE WORK
STATEMENT AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Gray Reef Dam-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
6 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00220
00230
00240
00250
00260
00270
00280
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Seminoe Camp, Dam, and
Road-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Pathfinder Dam &
Dike-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Miracle Mile Area-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Kortes Dam and Road-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period One: Pathfinder Interpretive
Trail-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2023
Period of Performance: 05/01/2023 to 04/30/2024
Option Period Two: Casper Mountain East Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Casper Mountain West Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024 Period of Performance: 05/01/2024 to 04/30/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
7 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00290
00300
00310
00320
00330
00340
Option Period Two: Sybrant Microwave Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Pine Ridge Microwave Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Sand Draw Microwave Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Mills Office Area-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Alcova Dam, Powerplant, Warehouse-ACCORDING TO THE PERFORMANCE WORK
STATEMENT AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Gray Reef Dam-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Seminoe Camp, Dam, and00350 Road-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024 Period of Performance: 05/01/2024 to 04/30/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
8 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00360
00370
00380
00390
00400
00410
00420
Option Period Two: Pathfinder Dam &
Dike-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Miracle Mile Area-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Kortes Dam and Road-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Two: Pathfinder Interpretive
Trail-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2024
Period of Performance: 05/01/2024 to 04/30/2025
Option Period Three: Casper Mountain East
Microwave Site-ACCORDING TO THE PERFORMANCE WORK
STATEMENT
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
Option Period Three: Casper Mountain West
Microwave Site-ACCORDING TO THE PERFORMANCE WORK
STATEMENT
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
Option Period Three: Sybrant Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
9 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
00430 Option Period Three: Pine Ridge Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
00440 Option Period Three: Sand Draw Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
00450 Option Period Three: Mills Office Area-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
00460 Option Period Three: Alcova Dam, Powerplant, Warehouse-ACCORDING TO THE PERFORMANCE WORK
STATEMENT AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
00470 Option Period Three: Gray Reef Dam-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
00480 Option Period Three: Seminoe Camp, Dam, and
Road-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
00490 Option Period Three: Pathfinder Dam &
Dike-ACCORDING TO THE PERFORMANCE WORK STATEMENT
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
10 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00500
00510
00520
00530
00540
00550
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
Option Period Three: Miracle Mile Area-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
Option Period Three: Kortes Dam and
Road-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
Option Period Three: Pathfinder Interpretive
Trail-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2025
Period of Performance: 05/01/2025 to 04/30/2026
Option Period Four: Casper Mountain East
Microwave Site-ACCORDING TO THE PERFORMANCE WORK
STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
Option Period Four: Casper Mountain West
Microwave Site-ACCORDING TO THE PERFORMANCE WORK
STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
Option Period Four: Sybrant Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
11 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00560 Option Period Four: Pine Ridge Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
00570 Option Period Four: Sand Draw Microwave
Site-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
00580 Option Period Four: Mills Office Area-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
00590 Option Period Four: Alcova Dam, Powerplant, Warehouse-ACCORDING TO THE PERFORMANCE WORK
STATEMENT AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
00600 Option Period Four: Gray Reef Dam-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
00610 Option Period Four: Seminoe Camp, Dam, and
Road-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
00620 Option Period Four: Pathfinder Dam &
Dike-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
12 15
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140R6022Q0012/0001
00630
00640
00650
Option Period Four: Miracle Mile Area-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
Option Period Four: Kortes Dam and Road-ACCORDING
TO THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
Option Period Four: Pathfinder Interpretive
Trail-ACCORDING TO THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2026
Period of Performance: 05/01/2026 to 04/30/2027
Add Item 00660 as follows:
Option Period for the Six (6) Month Extension:
Casper Mountain East Microwave Site-ACCORDING TO
THE PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item) 05/01/2027 Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00670 as follows:
Option Period for the Six (6) Month Extension:
Casper Mountain West Microwave Site-ACCORDING TO
THE PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item) 05/01/2027 Period of Performance: 05/01/2027 to 11/01/2027
Additional Items are Continued on the following page(s).
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
00660
00670
13 15CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R6022Q0012/0001
00680
00690
00700
00710
00720
Add Item 00680 as follows:
Option Period for the Six (6) Month Extension:
Sybrant Microwave Site-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00690 as follows:
Option Period for the Six (6) Month Extension:
Pine Ridge Microwave Site-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00700 as follows:
Option Period for the Six (6) Month Extension:
Sand Draw Microwave Site-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00710 as follows:
Option Period for the Six (6) Month Extension:
Mills Office Area-ACCORDING TO THE PERFORMANCE
WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00720 as follows:
Option Period for the Six (6) Month Extension:
Alcova Dam, Powerplant, Warehouse-ACCORDING TO
THE PERFORMANCE WORK
STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Additional Items are Continued on the following page.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $_______________
1 AU $________________
14 15CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R6022Q0012/0001
00730
00740
00750
00760
00770
00780
Add Item 00730 as follows:
Option Period for the Six (6) Month Extension:
Gray Reef Dam-ACCORDING TO THE PERFORMANCE WORK
STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00740 as follows:
Option Period for the Six (6) Month Extension:
Seminoe Camp, Dam, and Road-ACCORDING TO THE
PERFORMANCE WORK STATEMENT
AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00750 as follows:
Option Period for the Six (6) Month
Extension:Pathfinder Dam & Dike-ACCORDING TO THE
PERFORMANCE WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00760 as follows:
Option Period for the Six (6) Month Extension:
Miracle Mile Area-ACCORDING TO THE PERFORMANCE
WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00770 as follows:
Option Period for the Six (6) Month Extension:
Kortes Dam and Road-ACCORDING TO THE PERFORMANCE
WORK STATEMENT AND MAPS
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
Add Item 00780 as follows:
Option Period for the Six (6) Month Extension:
Pathfinder Interpretive Trail-ACCORDING TO THE
PERFORMANCE WORK STATEMENT
AND MAPS
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $________________
1 AU $________________
1 AU $________________
1 AU $________________
15 15CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R6022Q0012/0001
(Option Line Item)
05/01/2027
Period of Performance: 05/01/2027 to 11/01/2027
TOTAL OF BASE PERIOD AND ALL OPTION PERIODS,
(INCLUSIVE OF ALL LINE ITEMS FOR THE OPTION
PERIOD(S) FOR THE SIX (6) MONTH EXTENSION).
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Bureau of Reclamation
Missouri Basin Region
Wyoming Area Office
Control of Noxious Weeds for the Wyoming Area Office and Surrounding Areas
PERFORMANCE WORK STATEMENT (PWS)
1.0 BACKGROUND
Noxious, invasive, and nuisance species reduce habitat, increase erosion, degrade riparian areas, create fire hazards, cause significant economic losses, and interfere with recreational activities. The
Bureau of Reclamation’s Wyoming Area Office requires noxious weed control in nine (9) different locations throughout the state. Specific locations and information will be provided within this
Performance Work Statement. This project would fulfill Reclamation’s responsibilities to control noxious, invasive, and nuisance species in accordance with State and Federal laws on the identified federal lands.
The contractor is responsible for ascertaining access to each of the sites. Several of the areas
(dams, dikes, switchyards) are not accessible by vehicle. The Alcova powerplant and warehouse are accessible by vehicle. It is recommended a site inspection precede prospective quotes because of varied and difficult conditions. Several sites are located behind locked gates.
At Alcova Powerplant the transformer yard bare ground treatment requires safety clearance from the Casper Control Center and safety measures must be followed. Reclamation will obtain the clearance from the Casper Control Center.
2.0 SCOPE
The work required under the contract is to survey and control noxious, invasive and nuisance species in accordance with Federal and State laws and regulations. The contractor shall furnish all labor, materials, herbicides and equipment to control noxious weeds throughout the location identified in this Performance Work Statement (PWS)
The contractor shall use herbicides based on the weed species, objectives, and other criteria specified below under the individual application sties. For any one site, more than one chemical may be used, depending on the on the variety of pest species and environmental conditions.
Treatments shall be completed using rates indicated on the labels and appropriate for site conditions. All chemicals must be compliant with all State and Federal law and regulation requirements.
Appropriate surfactants shall be used to increase efficacy or when indicated on the label. A dye shall be added to all liquid herbicides and/or tank mixtures at a rate sufficient to assure that the applications are visible to the inspector. The contractor shall submit an applicator report at the time of submitting invoices.
The timely and accurate performance of these services must be recognized as a vital and mandatory requirement of the Purchase Order.
140R6022Q00128
WY-Control of Noxious Weeds for the Wyoming Area Office And Surrounding Areas .
2.1 LOCATION
Access to work area shall be coordinated with the Quality Assurance Evaluator (QAE). The treatment areas are as following:
Item 1: Microwave sites
Item 2: Mills Office Area
Item 3: Alcova Facilities and Casper Canal Headgate
Item 4: Gray Reef Dam
Item 5: Seminoe Camp, Dam, and Road
Item 6: Pathfinder Dam and Dike
Item 7: Miracle Mile Area
Item 8: Kortes Dam
Item 9: Pathfinder Interpretive Trail
The total estimated acreage is approximately 50 acres.
Hours of availability are from 7:30 am to 4:00 pm. Monday through Friday. (Excluding Holidays).
The Contractor must coordinate their activities with the QAE. Request for exceptions to the time periods must be submitted in writing and approved in advance.
3.0 TASKS - The contractor shall perform the following tasks:
Herbicide shall be furnished by the contractor and applied according to the label and all local, State, and Federal laws and regulations. All work shall be performed by a commercial applicator licensed in Wyoming or under the direct supervision of a licensed applicator. The contractor is responsible for the correct application of pesticides and chemicals on the federal lands. The
Contractor shall keep commercial application records in accordance with the State and Federal
Requirements. The contractor shall provide current and valid professional certifications, permits and/or licenses prior to onsite work.
The contractor shall provide a copy of each herbicide label or a Safety Data Sheet (SDS) for each chemical to be used, and a photocopy of the contractor’s commercial applicators license prior to commencement of work. The pesticide coordinator and QAE, Regan Kirchner, shall be contacted at rkirchner@usbr.gov, a minimum of one week prior to any application to ensure that facility personnel are available to provide access, if necessary. Contractor shall list type of equipment to be used per location of application, prior to commencement of work.
In addition to the specific sites and pests identified, the contractor shall treat any noxious weed populations encountered at Reclamation sites during the course of carrying out the purchase order.
If any such noxious weed populations exceed 0.1 acres, the contractor shall notify the QAE.
Treatment shall be done during the dates specified. All “bare ground” or sterilization work shall be done between May 1st and May 31st; all broadleaf treatments shall be done between June 1st and June 30th. Note that if weather, such as high winds or snow on the ground restricts treatment during the designated time period, or (reasonable) delay for time allowed for submittal submissions and approvals, the contractor shall propose alternative dates and/or treatments that will meet Reclamation objectives. Such requests must be submitted in writing and approved in advance.
The Contractor shall have experience in Global Positioning System (GPS) capabilities, including collecting points, lines and areas and correctly attributing them. The contractor shall furnish maps of all contractor activities including the treated areas at the time of invoicing for approval by the
QAE.
Reclamation structures, such as dams and dikes, which have been listed for control of woody vegetation, shall be thoroughly examined by the contractor. All woody plants that are located shall be spot treated. The acreages shown for each site are the gross acres to be examined and spot treated while the actual acreage to be treated with herbicide will be significantly less. All acreages shown are map estimates intended for planning purposes only and will not be used as a basis for adjusting payments.
All pesticide containers shall be removed from Reclamation premises the same day the application takes place. The contractor shall dispose of the containers in accordance with State and Federal laws.
3.1 GPS
Contractor shall have experience in Global Positioning System (GPS) capabilities, including collecting points, lines and areas and correctly attributing them. The contractor shall furnish maps of all contractor activities including the treated areas. The GPS unit shall record the treatment locations with data accuracy of plus or minus not less than one (1) meters and survey shall be performed using the 1983 North American Datum (NAD83) with projection set to Universal
Transverse Mercator, Zone 12 North (UTM12). Any maps provided to Reclamation shall include a legend, legal description, North arrow and a reference scale. The Contractor shall be knowledgeable in using Geographic Information System (GIS) and creating shapefiles/KMLs with attribute tables that include: date of application, treatment type and herbicides used, target weed species, examiner, treatment area in acres and, if applicable, linear miles of treatment area at water's edge.
At Alcova Dam, Gray Reef Dam, Seminoe Camp, Dam and Road, Pathfinder Dam and Dike, Miracle Mile, Kortes Road and Pathfinder Interpretive Trail, the contractor shall record locations of treatments using a GPS. GPS positions will be delivered to Reclamation in a format such as a
Shapefile or KML, so long as the date, target species and chemical used are noted within each individual point, line or polygon. GIS maps shall be submitted at time of invoicing, for approval by the QAE.
General location maps and application site maps are attached following the performance work statement.
3.2 TARGET AVOIDANCE
All spraying shall avoid all water surfaces. The contractor will be responsible for damage to non-target vegetation. None of the areas are near agricultural crops. Several areas, however, are near drinking water sources, surface water, or desirable trees and shrubs. All spraying shall avoid any areas occupied by the recreating public.
140R6022Q0012
WY-Control of Noxious Weeds for the Wyoming Area Office And Surrounding Areas
Table 01 – Treatment Areas
ITEM Name Exhibit Acres Tasks
Casper Mountain
East Microwave
Site
(Bare Ground)
Exhibit K 0.5 Control all vegetation inside the chain link fence. The site is located behind a locked gate and is accessible by vehicle.
Casper Mountain
West Microwave
Site
(Bare Ground
Exhibit K 0.5 Control all vegetation inside the chain link fences. The site is located behind a locked gate, and is accessible by vehicle.
Sybrant
Microwave Site
(Bare Ground)
Exhibit K1 1.0 Control all vegetation inside the chain link fence. The site is located behind a locked gate and is accessible by vehicle.
Pine Ridge
Microwave
Sites (Bare
Ground)
Exhibit K3 .05 Control all vegetation underneath and immediately surrounding the tower.
Sand Draw
Microwave Site
(Bare Ground)
Exhibit K2 .05 Control all vegetation underneath and immediately surrounding the tower and surrounding the support buildings.
Mills Office Area
(Bare Ground) Exhibit L 5.0 Treat the gravel areas within the fenced area, as shown on Exhibit L. Treat all fence lines around gravel areas and around stockpiled materials, equipment, and vehicles.
To assure no weed growth occurs throughout the growing season, a herbicide and pre-emergent should be tank-mixed as appropriate.
Alcova Dam, Powerplant, Warehouse and
Casper Canal
Headgate
(Bare Ground &
Broadleaf)
Alcova Dam
Exhibit E 15.0
BROADLEAF
1. Control all woody vegetation on the upstream and downstream faces of Alcova Dam and at the toe of the dam by the hot springs
2. Control all woody vegetation within 25 ft. of the right abutment contact of the dam
3. Control all woody vegetation within 15 ft. of the
North spillway chute wall
4. Control saltcedar, dalmation toadflax, and other noxious weeds in the drainages Southeast of the powerplant and South of the road to the dam
5. Control burdock, houndstongue, and other noxious weed between the sewage lagoons, and the river, and along the bank, upstream to the bridge.
6. Control Russian knapweed and other noxious weeds
Northeast of Alcova School.
BARE GROUND
7. Control all vegetation on the road and parking areas over the dam
8. Control all vegetation inside the transformer yard adjacent to the East side of the Powerplant
(continued) Casper Canal Exhibit E1 Headgate
9. Spot treat to control all vegetation around the office and parking area inside the fence at the Powerplant.
10. Control all vegetation inside the warehouse yard.
Do not damage trees in the adjacent park.
BARE GROUND
Control all vegetation within the chain link fence with a pre-emergent, non-selective, & post-emergent, non-selective herbicide a
Gray Reef Dam
(Broadleaf)
Exhibit F Less than
1.5
Control all woody vegetation on the upstream and downstream face, crest, toe, and within 25 ft. of the abutments (contact points) for Gray Reef Dam
Seminoe
Camp, Dam &
Road
(Broadleaf &
Bare Ground)
Seminoe Road Exhibit J1
Exhibit J 20.0
BROADLEAF
1. Control broadleaf weeds in the lawns in the
Government Camp area, protecting all ornamental plantings (0.6 acres)
2. Control all thistles on the Seminoe Camp leach field
(0.2 acres)
3. Control all broadleaf vegetation within five feet of the playground, around the shop, garages, and along the chain link fence and guardrail North and East of the warehouse and within the weather station area
(0.2 acres)
BROADLEAF
1.Control all Russian knapweed, burdock, Canada thistle, plumeless thistle, and Dalmatian toadflax and other noxious weeds within 10 feet of the road from
Miracle Mile area to the Seminoe State Park boundary. Note: A drinking water source and other surface water are located along portions of the road.
2. Control all Russian knapweed, Dalmatian toadflax and other noxious weeds within 10 feet of the road to the powerplant
3.Control all Russian knapweed, Dalmatian toadflax and other noxious weeds within 10 feet of the road to the dam
4. Control all Russian knapweed, Dalmatian toadflax and other noxious weeds within 10 feet of the road to
Seminoe Camp
5. Control Dalmatian toadflax and other noxious weeds within 10 feet of each side of the Morgan
Creek Road
Pathfinder Dam &
Dike (Bare Ground
& Broadleaf)
Pathfinder Dam
Exhibit H
6.0 Broadleaf
1. Control all woody vegetation on the upstream and downstream faces of Pathfinder dike, and all woody vegetation and noxious weeds within 25 feet of upstream and downstream contact points (see also item 3 on dike).
2. Control all woody vegetation within 25’ of abutment contacts
Bare Ground
3. Control all vegetation on the hand-placed rip rap on the upstream face of the dike
Miracle Mile
Area
(Broadleaf)
Exhibit G 12 total hours
(acreage is dependent upon survey results)
Control Perennial Pepperweed, as shown on Exhibit G
Control Russian Knapweed, Canada Thistle or other noxious weeds as encountered in the area
Control Saltcedar as encountered in the area
The contractor shall spend twelve (12) hours on-site surveying and treating noxious species at the Miracle
Mile as directed by the Quality Assurance Evaluator
(QAE). This is a designated Class I Water area by WY
DEQ, and as such, a shapefile/kml of the treated areas must be submitted to Reclamation to be forwarded to
DEQ.
Kortes Road
(Bare Ground) Exhibit I2 0.1
Control all vegetation along the parapet wall
(approx. 1000’)
Pathfinder
Interpretive
Trail (Bare
Ground)
Exhibit H1 2.0 Control all vegetation on the approximately 5 feet wide by 1.7 miles along Pathfinder Dam Interpretive
Trail.
Treat all poison ivy adjacent to the Interpretive Trail
The total estimated acreage is approximately 50 acres.
Some of the sites are located behind locked gates. The powerplant and warehouse are accessible by vehicle.
*Note 1 Alcova Dam
1. Control all woody vegetation on the upstream and downstream faces of Alcova Dam and at the toe of the dam by the hot springs
2. Control all woody vegetation within 25 ft. of the right abutment contact of the dam
3. Control all woody vegetation within 15 ft. of the North spillway chute wall
4. Control saltcedar, dalmation toadflax, and other noxious weeds in the drainages Southeast of the powerplant and South of the road to the dam
5. Control burdock, hounds tongue, and other noxious weed between the sewage lagoons, and the river, and along the bank, upstream to the bridge.
6. Control Russian knapweed and other noxious weeds Northeast of Alcova School.
7. Control all vegetation on the road and parking areas over the dam
8. Control all vegetation inside the transformer yard adjacent to the East side of the Powerplant.
9. Spot treat to control all vegetation around the office and parking area inside the fence at the
Powerplant.
Control all vegetation inside the warehouse yard. Do not damage trees in the adjacent park.
*At Alvoca Powerplant, the transformer yard bare ground treatment requires safety clearance from the Casper Control Center and safety measures must be followed. Reclamation will obtain the clearance from the Casper Control Center.
Note 2: Seminoe Road
1. Control all Russian knapweed, burdock, Canada thistle, plumeless thistle, and Dalmatian toadflax and other noxious weeds within 10 feet of the road from Miracle Mile area to the
Seminoe State Park boundary. Note: A drinking water source and other surface water are located along portions of the road.
2. Control all Russian knapweed, Dalmatian toadflax and other noxious weeds within 10 feet of the road to the powerplant.
3. Control all Russian knapweed, Dalmatian toadflax and other noxious weeds within 10 feet of the road to the dam.
4. Control all Russian knapweed, Dalmatian toadflax and other noxious weeds within 10 feet of the road to Seminoe Camp.
5. Control Dalmatian toadflax and other noxious weeds within 10 feet of each side of the
Morgan Creek Road.
Note 3: Miracle Mile Area
The contractor shall treat noxious species at the Miracle Mile as directed by the Quality
Assurance Evaluator (QAE). This is a designated Class I Water area by WY DEQ, and as such, a shapefile/kml of the treated areas must be submitted to Reclamation to be forwarded to
WY DEQ, (In accordance with WY Department of Environmental Quality.)
1. Control Perennial Pepperweed, as shown on Exhibit G.
2. Control Russian Knapweed, Canada Thistle or other noxious weeds as encountered in the area.
3. Control Saltcedar as encountered in the area.
4. GPSing required. Detailed shapefiles/KMLs should include species treated, date treated, and herbicides applied.
4.0 ENVIRONMENTAL PROTECTION
The contractor shall comply with all federal, state, and local laws, regulations, and standards.
All environmental protection matters shall be coordinated with the QAE.
5.0 CONTRACTOR PERSONNEL
All contractor employees must be U.S. citizens or have a valid Immigrant Visa Number, Permanent Resident Card, or Resident Alien Card authorizing them to work in the U.S. The contractor shall abide by all Federal, State, and Local laws pertaining to hiring and assigning tasks to personnel.
In accordance with MB-7 Site Security, the contractor shall provide a listing of all personnel performing work under the purchase order prior to performance. Copies of state issued licenses that pertain to work related tasks may be required. The contractor shall notify the QAE in writing of any personnel change to this list prior to the implementation of such change(s).
The contractor shall report to the QAE any accidents involving injury, death, damage to
Government property, or accidental loss of Government property resulting from the activities of the contractor, their subcontractors, their agents, or their employees. A report shall be forwarded to the QAE and the CO within two (2) working days after the date of the accident.
All accident records required by the Occupational Safety and Health Act shall be maintained in accordance with OSHA guidelines. In addition, the contractor shall cooperate and provide data to follow-up investigation of an accident by Reclamation.
All personnel employed by the contractor for performance of the purchase order or any representative of the contractor entering the Government installation, shall abide by all security regulations of the installation.
6.0 CONTRACTOR FURNISHED SUPPLIES
The Contractor shall furnish all supplies in accordance with standard industry practices required to perform under the purchase order to include at least the following:
a. The contractor is responsible for providing all labor, equipment, materials, supplies, and state issued commercial applicator’s license (if applicable) necessary to meet the requirements of the purchase order. Trucks, vehicles, and personnel will be licensed, insured, and certified as required by the appropriate governing agencies. Trucks shall be operational in accordance with Wyoming Department of Transportation requirements.
7.0 SAFETY AND HEALTH
All requirements concerning personal safety contained in parts 2, 7, 8, and 11 of the
“Reclamation Safety and Health Standards” shall be followed by the applicator. See website https://www.usbr.gov/safety/rshs/index.html for the Reclamation Safety and Health Standards.
8.0 PERFORMANCE CRITERIA
The designated Quality Assurance Evaluator (QAE) will document acceptable and unacceptable purchase order performance. If the QAE considers the contractor's performance to be unsatisfactory, the information will be reported to the Contracting Officer (CO). The
CO may require the contractor to explain, in writing, the cause of the poor performance, any corrective actions the contractor has already taken to obtain an acceptable level and any future corrective actions the contractor will utilize to prevent unacceptable performance.
9.0 PERFORMANCE REQUIREMENTS SUMMARY TABLE
The following table summarizes the tasks, the performance standard, monitoring method, and disincentives/incentives for performance standards.
Task Description Performan ce
Standard
Method of
Monitorin g
Disincentive Incentive
Timeliness Performance completed within designated timeframes, unless existing conditions warrant a different timeframe.
Written approval must be granted for exceptions.
100%
Inspection
1) Re-work at contractor’s expense
1)
Exceptional contractor performanc e will be documented
Quality All tasks with no deviation in quality.
100%
Inspection
10.0 Government Remedies
All work shall be subject to inspection, approval, and acceptance by the Government in accordance with FAR 52.212-4(a) - Contract Terms and Conditions--Commercial Products and Commercial
Services (Nov 2021)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this purchase order. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase to purchase order price. If repair/replacement or re-performance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered;
and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
11.0 REQUIRED SUBMITTALS
Submittals from the contractor are required during the term of the purchase order to ensure quality and safe work under the purchase order. Required submittals are as follows:
*Required Submittal Number
RSN
Clause or
Section Title Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: *
CO QAE
3 Liability Insurance
1452.228-70
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the
Purchase Order
CO 1 electronic 0
4 Invoice DOI – AAAP-0028
Electronic Invoicing and
Payment Requirements (IPP)
DRAFT Invoice before entering into
IPP
10 Days Prior to
Payment Request
CO 1 electronic 1 electronic
6 Payrolls and Basic Records
52.222-8
Copies of all payrolls Weekly for each week of contract performance
QAE 0 1 electronic encrypted
7 Release of Claims
1452.204-70
Release of Claims (DI-
137) against the
Government
After completion of the work and prior to final payment
CO 1 electronic 0
8 Licenses and Permits
3.0 TASKS
Professional certifications, permits and/or licenses
Prior to onsite work
QAE 1 1 electronic
9 Material Safety Data Sheet
3.0 TASKS
Provide a copy of each herbicide label or a Safety Data
Sheet (SDS) for each chemical to be used, and a photocopy of the contractor’s commercial applicators license.
Prior to commencement of work QAE 0 1 electronic
Equipment
3.0 TASKS
Type of equipment in using in each area per application
Prior to commencement of work
QAE
0 1 electronic
GIS Maps
3.1 GPS
The contractor shall furnish maps of all contractor activities of including the treated areas.
At time of invoicing
QAE 0 1 electronic
Applicator Weed Spray
Report
2.0 SCOPE
The contractor shall submit a weed spray report (date, site location, time, weather conditions, pesticide, EPA Registration number, and application rate)
Within 15 days of completion of work.
QAE 0 1 electronic
140R6022Q0012/0001
WY-Control of Noxious Weeds for the Wyoming Area Office and Surrounding Areas
CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: FAR
Clauses - https://www.acquisition.gov/far/
Clause Title Date
52.204-13 System for Award Management Maintenance Oct 2018
52.204-18 Commercial and Government Entity Code Maintenance Aug 2020
52.212-4 Contract Terms and Conditions –Commercial Items Nov 2021
52.222-8 Payrolls and Basic Records Jul 2021
52.232-18 Availability of Funds Apr 1984
52.232-39 Unenforceability of Unauthorized Obligations Jun 2013
52.232-40 Providing Accelerated Payments to Small Business Subcontractors Nov 2021
52.242-15 Stop-Work Order Aug 1989
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO
IMPLEMENT STATUTES AND EXECUTIVE ORDERS (JAN 2022)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and
Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV
2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L.
115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV
2015).
(5) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws
108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
https://www.acquisition.gov/far/ https://acquisition-staging.gsa.gov/far/part-52#FAR_52_203_19 https://acquisition-staging.gsa.gov/far/part-52#FAR_52_204_23 https://acquisition-staging.gsa.gov/far/part-52#FAR_52_204_25 https://acquisition-staging.gsa.gov/far/part-52#FAR_52_209_10 https://acquisition-staging.gsa.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://acquisition-staging.gsa.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN
2020), with Alternate I (NOV 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV
2021) ( 41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and
Reinvestment Act of 2009 (JUN 2010)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .