140R6021R0029_Amendment_0003_0003.pdf
PDF 499 KB Posted
- Attached to
- EC - EAST PORTAL DAM SPILLWAY REPAIR
- Solicitation number
- 140R6021R0029
About this file
This document is an amendment to a solicitation for concrete repair work at the East Portal Diversion Dam spillway in Colorado. The Bureau of Reclamation issued Amendment 0003 to Solicitation 140R6021R0029 for the EC - EAST PORTAL DAM SPILLWAY REPAIR project. Offerors must acknowledge receipt of this amendment by the time and date specified for proposal receipt. A virtual site visit was held on October 7, 2021 and questions must be submitted by October 12, 2021, with answers provided in a future amendment. Proposals are due by 2:00 PM MDT on October 29, 2021. Interested contractors can request a copy of the site visit presentation. This amendment provides additional details on the project scope and responses to questions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R6021R0029 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
R60
10/08/2021
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
Bureau of Reclamation Missouri Basin Region Regional Office PO Box 36900 Billings MT 59107
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/20/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
East Portal Diversion Dam, Spillway Concrete Repair, Colorado Big-Thompson Project, Colorado
See the attached for the incorporated changes:
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Linda Melnick
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0003 Solicitation No. 140R6021R0029
Acknowledgement: See Block 11 on the Standard Form 30 regarding acknowledgement by offerors to this amendment. The Government requires acknowledgment by offerors to this amendment at the place designated for receipt of proposals. (Please see Block 19 on the Standard Form 1442.)
Receipt of Proposals: The hour and date for receipt of proposals remains the same; 2:00 PM MDT on October 29, 2021.
Third Party: If you have provided a copy of this solicitation to another company or individual, please forward this amendment accordingly.
Site Visit: The virtual site visit was held on October 7, 2021 at 2:00 MDT on Microsoft Teams.
The list of interested contractors and those who confirmed their attendance of the virtual site visit is attached below.
Interested contractors who would like a copy of the PowerPoint presentation from the virtual site visit shall request it via email from Ms. Maurer (camaurer@usbr.gov). Due to file size limitations, requested copies will be sent to interested contractors using the KiteWorks software.
Questions: The Government will not acknowledge questions received after 4:00 PM MDT on October 12, 2021. Answers to the questions received will be addressed by the Government within a future amendment.
mailto:camaurer@usbr.gov
East Portal Diversion Dam, Colorado Big-Thompson Project, Colorado Virtual Site Visit, 2:00 PM MDT, October 7, 2021
List of Interested Contractor Requests / Attendance Sheet
Name Company Email Attended Luis Garza Acacia Builders
Group, Inc.
luisgarza@acaciabg.com
Eddie Hammonds ACU Construction eddie@acuconstruction.com Harry Clincy ACU Construction hclincy@acuconstruction.com
Daragh Goode Affordable Concrete, LLC daragh@affordableconcretellc.com X
Jeff Frederickson Affordable Concrete, LLC jeff@affordableconcretellc.com X
Ethan Namink Aggregate Technologies, Inc ethann@aggregatetechnologies.com X
Mike Sondag Alltech Engineering Corp.
msondag@AlltechEngineering.com X
Evan Willeke American Mine Services, LLC ewilleke@americanmineservices.com
Zack Meints American Mine Services, LLC zmeints@americanmineservices.com X
Jacob Vasquez Artisan Works, LLC jacob@artisanironworksllc.com Jaime Vasquez Artisan Works, LLC jaime@artisanironworksllc.com
Douglas DeLozier
Aslan Construction, Inc douglasd@aslanconstruction.com X
Joe Sanchez Dub-l-ee, LLC jsanchez@dub-l-ee.com Joshua Baca Dub-l-ee, LLC jbaca@dub-l-ee.com
Danny Thomason Epoxy Design Systems, Inc dthomason@epoxydesign.com X
Hank Taylor Epoxy Design Systems, Inc hank@epoxydesign.com X
Bob Lawrence Hallmark, Inc hallmark5040@hotmail.com X Nathan Randall Hallmark, Inc hallmark5040@hotmail.com David DePaco Harrison Western ddepaco@harwest.com X
Scott Teel Harrison Western steel@harwest.com X Chris O’Bryan LaCreek
Development, Corp chrisobryan@lacreekdevelopment.com
CJ Means LaCreek Development, Corp cjmeans@lacreekdevelopment.com X
Paul Wagner Lillard & Clark Construction pwagner@lillardclark.com X
Tammy Hampton Medved Global, Inc tammy@medvedgbl.com X Brett Wallgren Monarch
Management & Consulting, Inc brett@monarch-pm.com X mailto:luisgarza@acaciabg.com mailto:eddie@acuconstruction.com mailto:hclincy@acuconstruction.com mailto:daragh@affordableconcretellc.com mailto:jeff@affordableconcretellc.com mailto:ethann@aggregatetechnologies.com mailto:msondag@AlltechEngineering.com mailto:ewilleke@americanmineservices.com mailto:zmeints@americanmineservices.com mailto:jacob@artisanironworksllc.com mailto:jaime@artisanironworksllc.com mailto:douglasd@aslanconstruction.com mailto:jsanchez@dub-l-ee.com mailto:jbaca@dub-l-ee.com mailto:dthomason@epoxydesign.com mailto:hank@epoxydesign.com mailto:hallmark5040@hotmail.com mailto:hallmark5040@hotmail.com mailto:ddepaco@harwest.com mailto:steel@harwest.com mailto:chrisobryan@lacreekdevelopment.com mailto:cjmeans@lacreekdevelopment.com mailto:pwagner@lillardclark.com mailto:tammy@medvedgbl.com mailto:brett@monarch-pm.com
Robert Young Monarch Management & Consulting, Inc robert@monarch-pm.com
Reginald West Pima Paving, Inc reggie@pimapaving.com X Jonathan Bradshaw
RealCo Development jbradshaw@realcodev.com X
Chase Velarde RIZZO International, Inc chase.velarde@rizzointl.com X
Dan Barton RIZZO International, Inc dan.barton@rizzointl.com
Duston Marlow RIZZO International, Inc duston.marlow@rizzointl.com
Paul Rizzo RIZZO International, Inc paul.rizzo@rizzointl.com
Steve Bennett RIZZO International, Inc steve.bennett@rizzointl.com
Tyler Warren RIZZO International, Inc tyler.warren@rizzointl.com X
Bill Scott Scott Tucker Construction
Company, LLC bill@stcctx.com
Amber Lunceford SCS Repair Group, LLC amber@scsrg.net
Michele DiBassie Structural Concrete Systems (SCS), LLC michele@scs.net X
Colin VanKampen
Structures, Inc ColinV@structuresinc.net X
Mark David Toro Defense Contracting, LLC mark.david@toro-dc.com
Michael Evangelista-
Ysasaga
Toro Defense Contracting, LLC michael.ey@toro-dc.com X
Anthony Aguirre Triple A Building Services, Inc anthony@tabsincwy.com X
Srivishnu Ravilla Triple A Building Services, Inc srivishnuravilla@tabsincwy.com X
William Garrison Triple A Building Services, Inc william@tabsincwy.com X
John Swain Velocity Contractor, Inc jswain@velocityci.com X
John Jacob Velocity Contractors, Inc jjacob@velocityci.com
Dan Sewczak Zak Dirt, Inc dsewczak@zakdirt.com X mailto:robert@monarch-pm.com mailto:reggie@pimapaving.com mailto:jbradshaw@realcodev.com mailto:chase.velarde@rizzointl.com mailto:dan.barton@rizzointl.com mailto:duston.marlow@rizzointl.com mailto:paul.rizzo@rizzointl.com mailto:steve.bennett@rizzointl.com mailto:tyler.warren@rizzointl.com mailto:bill@stcctx.com mailto:amber@scsrg.net mailto:michele@scs.net mailto:colin@structuresinc.net mailto:mark.david@toro-dc.com mailto:michael.ey@toro-dc.com mailto:anthony@tabsincwy.com mailto:srivishnuravilla@tabsincwy.com mailto:william@tabsincwy.com mailto:jswain@velocityci.com mailto:jjacob@velocityci.com mailto:dsewczak@zakdirt.com