Amendment 004 description of changes_0004.pdf
PDF 2 MB Posted
- Attached to
- CFPP GENERATOR REWIND ROTOR REFURB Federal contract opportunity
- Solicitation number
- 140R6021R0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0007_0007.pdf | ||
| Sol_140R6021R0012_Amd_0007.pdf | ||
| Amendment 006_0006.pdf | ||
| Sol_140R6021R0012_Amd_0006.pdf | ||
| Sol_140R6021R0012_Amd_0005.pdf | ||
| Amendment 005_0005.pdf | ||
| Sol_140R6021R0012_Amd_0004.pdf | ||
| Amendment 003_0003.pdf | ||
| Sol_140R6021R0012_Amd_0003.pdf | ||
| Sol_140R6021R0012_Amd_0002.pdf | ||
| SF 30_0002.pdf | ||
| Sol_140R6021R0012_Amd_0001.pdf | ||
| sf 30_0001.pdf | ||
| Solicitation updated 1.11.pdf | ||
| Sol_140R6021R0012.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R6021R0012 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
01/12/20210004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended,
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/12/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Gerri Voto-Braun
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
x
Canyon Ferry Powerplant G1 – G3 Generator Rewinds Canyon Ferry Unit, Helena-Great Falls Division Pick–Sloan Missouri Basin Program, Montana
See attached for changes:
Solicitation# 140R6021R0012
Amendment No. 0003
Description of Changes:
1. Replace Table of Contents with revised Table of Contents
2. In Part 1 – The Schedule, Section A – 1442 – Solicitation, Offer, and Award replace in its entirety with the new Section A – 1442 – Solicitation, Offer, and Award.
3. In Part 1 – The Schedule, Section C - Specification replace Section 01 33 00 Submittals in its entirety with the new Section 01 33 00 Submittals.
4. In Part 1 – The Schedule, Section F - Deliveries or Performance replace in its entirety with the new Section F – Deliveries or Performance.
5. In Part 2 – Contract Clauses, Section I – Contract Clauses replace in its entirety with the new
Section I – Contract Clauses.
6. In Part 4 – Representations and Instructions, Section L - Instructions, Conditions, and Notices to
Bidders, Replace in its entirety with the new revised Section L – Instructions, Conditions, and
Notices to Bidders.
7. In Part 4 – Representations and Instructions, Section M – Evaluation Factors for Award, Replace in its entirety with the new revised Section M – Evaluation Factors for Award.
8. Questions and answers for prospective contractors are attached.
Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The
Government must receive the acknowledgement at the place designated for receipt of bids (See Block
10 of the Standard Form 1442).
Closing Date for the Receipt of Proposals- The hour and date for receipt of proposals is hereby extended to March 10, 2021 at 1300 MT.
Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
Canyon Ferry Powerplant G1-G3 Generator Rewinds Canyon Ferry Unit, Helena-Great Falls Division Solicitation No. 140R6021R0012 Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Table of Contents Revised 00 01 10 - 1
TABLE OF CONTENTS
PART I – THE SCHEDULE
SECTION A – Solicitation, Offer, and Award (SF 1442)
SECTION B – Schedule
SECTION C – Specifications
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions 01 14 30 Interruption of Service 01 31 19 Project Management and Coordination 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 54 20 Use of Government Crane and Tools 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 60 00 Product Requirements 01 74 10 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 - EXISTING CONDITIONS
02 80 10 General Requirements for Coatings Containing Hazardous Materials Abatement 02 83 30 Removal and Disposal of Coatings Containing Regulated Metals
DIVISION 22 - PLUMBING
22 11 85 Generator Air Coolers
DIVISION 26 – ELECTRICAL
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Table of Contents
Revised 00 01 10 - 2
26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 33 Electrical Conduit
DIVISION 48 - ELECTRICAL POWER GENERATION EQUIPMENT
48 13 00 Hydroelectric Project Information 48 13 64 Stator Cores 48 13 71 Armature Windings 48 13 73 Field Windings
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 10 Generator Loading Tests 51 00 20 Generator Material Sampling Results
DIVISION 52 - DRAWINGS
52 00 00 Drawings
SECTION D –
D.1 Preparation for Shipment and Handling
SECTION E – Inspection and Acceptance E.1 Material and Workmanship E.2 Inspection of Supplies-Fixed-Price
E.3 Inspection of Construction E.4 Responsibility for Supplies E.5 Warranty of Construction
SECTION F – Deliveries or Performance F.1 Time of delivery – ALT III F.2 Commencement, Prosecution, and Completion of Work F.2 Suspension of Work
F.3 Liquidated damages – Supplies, Services or Research and Development F.4 Liquidated damages – construction F.5 Time Extensions F.6 Variation in Estimated Quantity F.7 Suspension of Work F.8 Stop-Work Order F.9 Government Delay of Work F.10 F.O. B Destination
Revised 00 01 10 - 3
F.11 Delivery Information F.12 Delivery and Task Order Issuance Procedures F.13 Contract Ordering Period F.14 Delivery Order – Delivery Dates F.15 Task Order Performance Periods F.16 Failure to Meet Performance Warranties
SECTION G – Contract Administration Data G.1 Authorities and Delegations G.2 Contracting Officer’s Representatives Authorities and Delegations G.3 Electronic Invoicing and Payment Requirements Invoice Processing Platform
(IPP)
G.4 Post-Award Conference G.5 Contractor’s Administration Personnel G.6 Notice to Contractors - Contractor Performance Assessment Reporting System
SECTION H – Special Contract Requirements
H.1 Schedule of Values H.2 Payment for Technical Data H.3 Site Security H.4 Implementation of Homeland Security Presidential Directive-12
PART II – CONTRACT CLAUSES
SECTION I – Contract Clauses I.1 Clauses Incorporated by Reference
I.2 Commercial and Government Entity Code Maintenance I.3 Display of Hotline Poster(s) I.4 Basic Safeguarding of Covered Contractor Information Systems I.5 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment I.6 Order of Precedence -- Uniform Contract Format
I.7 Notice of Total Small Business Set-Aside I.8 Limitations on Subcontracting
I.9 Minimum Wages Under Executive Order 13658 I.10 Buy American – Construction Materials I.11 Bid Guarantee I.12 Federal, State and Local Taxes I.13 Prompt Payment for Construction Contracts I.14 Performance of Work by The Contractor I.15 Other Contracts (Deviation) I.16 Accident Prevention
Revised 00 01 10 - 4
I.17 Availability and Use of Utility Services I.18 Schedules for Construction Contracts I.19 Specifications and Drawings for Construction I.20 Preconstruction Conference I.21 Authorized Deviations in Clauses I.22 Ordering
I.23 Ordering Limitations I.24 Indefinite Quantity I.25 Additional Bond Security I.26 Performance and Payment Bonds -- Construction I.27 Changes I.28 Warranty of Supplies of a Complex Nature
I.29 Restriction on Endorsements--Department of the Interior I.30 Release of Claims--Department of the Interior I.31 Prohibition on Release of Information -- Bureau of Reclamation I.32 Asbestos-Free Warranty – BOR I.33 Safety and Health – BOR
I.34 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace
I.35 Liability Insurance -- Department of the Interior I.36 Certification of Representatives for Corporate Sureties I.37 Equipment Ownership and Operating Expense--Bureau of Reclamation I.38 Payment for Mobilization and Preparatory Work – Alternate III I.39 Other Invoice Requirements I.40 Claims Accounting -- Bureau of Reclamation I.41 Other Contracts I.42 Preservation of Cultural Resources--Bureau of Reclamation I.43 Security Requirements--Bureau of Reclamation I.44 Modification Proposals - Alternate IV I.45 Failure to Meet Performance Warranties - Alternate iib
PART III – DOCUMENTS, EXHIBITS, AND OTHER
SECTION J – List of Documents, Exhibits, and Other Attachments ATTACHMENT NUMBER 0001 .............General Decision Number: MT20200075 10/16/2020 ATTACHMENT NUMBER 0002 ..................................................Standard Form 24 - Bid Bond ATTACHMENT NUMBER 0003 ......................... ............. Draft Proposed Subcontracting Plan ATTACHMENT NUMBER 0004 ................................................................................. GP-PIV-1
ATTACHMENT NUMBER 0005…………...…………………….……………………. OF-306
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors
Revised 00 01 10 - 5
K.1 Prohibition on Contracting with Entities That Require Certain Internal Confidentiality Agreements—Representation
K.2 Annual Representations and Certifications K.3 Representation Regarding Certain Telecommunications And Video
Surveillance Services Or Equipment K.4 Information Regarding Responsibility Matters K.5 Certification Regarding Tax Matters K.6 Cost Accounting Standards Notices and Certification
SECTION L – Instructions, Conditions and Notices to Bidders L.1 System for Award Management L.2 Commercial and Government Entity Code Reporting L.3 Alternative Line Item Proposal
L.4 Availability of Specifications Listed in The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29
L.5 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
L.6 Submission of Offers in The English Language L.7 Submission of Offers in U.S. Currency L.8 Instructions to Offerors -- Competitive Acquisition L.9 Type of Contract L.10 Construction wage Rate Requirements - Secondary Site of the Work L.11 Notice of Requirement for Affirmative Action to Ensure Equal Employment
Opportunity for Construction L.12 Notice of Buy American Requirement--Construction Materials L.13 Site Visit (Construction) L.14 Preparation of Proposals – Construction L.15 Authorized Deviations in Provisions L.16 Use and Disclosure of Proposal Information L.17 Service of Protest -- Department of the Interior (JUL 1996) (DEVIATION) L.18 Source Evaluation and Selection Procedures L.19 General Proposal Instructions L.20 Technical Proposal Instructions L.21 Pricing Proposal Instructions L.22 Notice of Proposed Partnering L.23 Instruction for Mobilization and Preparatory Work Schedule Line Item – Multiple
Schedules
SECTION M – Evaluation Factors for Award M.1 Evaluation Factors for Award
M.2 Notice of World Trade Organization Government Procurement Agreement Evaluations M.3 Evaluation of Equipment Efficiency and Losses
Revised 00 01 10 - 6
END OF CONTENTS
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040484161
Bureau of Reclamation
Great Plains Region
Regional Office PO Box 36900
R60
Billings MT 59107
Stormy Gallagher 406-247-7820
1x
140R6021R0012
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
_TBD
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
calendar days and complete it within
NSN 7540-01-155-3212
x x copies to perform the work required are due at the place specified in Item 8 by _____________ ________1300_____ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________ ______
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
___1825____ calendar days after receiving x
Paragraph F.1 x
Bureau of Reclamation Great Plains Region Regional Office 2021 4th Ave N STE 5000 Billings MT 59107
The estimated price range for this work is $10,000,000 and $25,000,000 The project is issued for full and open competition The North American Industrial Classification Code is 238990 The Small Business Size Standard is $16.5 Million
Proposals will be received at the Bureau of Reclamation Missouri Basin Regional Office, addresses identified in Blocks 7 and 8 above.
Taxpayer Identification Number:____________________
Data Universal Numbering System: __________________
Commercial and Government Entity Code:_____________ sgallagher Highlight
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
R60
Bureau of Reclamation Missouri Basin Region Regional Office PO Box 36900 Billings MT 59107
Gerri Voto-Braun
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Invoice Processing Platform www.ipp.gov
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R6021R0012
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
0010 1 AU $_________ $__________________See Continuation of Section B - Supplies or Services and Prices
(CLINS A1-A9)
(CLINS B1-B4)
(CLINS C1-C4)
(CLINS D1-D4)
(CLINS E1-E4)
(CLINS F1-F4)
(CLINS G1-G4)
(CLINS H1-H4)
(CLINS I1-I4)
(CLIN J1)
(CLIN K1)
(CLIN L1)
(CLIN M1)
Canyon Ferry Unit, Helena-Great Falls Division
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedules for other items of work.
1.02 REFERENCE STANDARDS
A. American National Standards Institute (ANSI)
1. ANSI Y14.1 Decimal Inch Drawing Sheet Size and
Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-14 United States National CAD Standards, Version 6
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236-
21, Specifications and Drawings for Construction.
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
1. In case of conflict between submittal time deration requirements of this section and derations included elsewhere in these specifications, time requirements included in this section take precedence.
B. General:
1. Prepare in English.
2. Label with contract number and title, and RSN.
3. Measurement Units: US Customary Units.
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 2
C. Drawings:
1. Minimum Identification in Title Block:
a. Contract number and title.
b. Contractor or supplier’s title and drawing number.
c. Date.
2. Reserve 3-by-3 inch space next to title block for review stamps.
3. Print Size: ANSI D size (22 inches by 34 inches).
4. Computer drafted drawings:
a. Draw to scale using computer drafting.
b. In accordance with NIBS NCS.
c. Electronic file format: Compatible with AutoCAD, Version 2015 or later.
d. Compile using “eTransmit” utility in AutoCAD.
e. Government will provide electronic AutoCAD format template.
f. Title Block and sheet format:
1) As shown on Standard Drawing 40-D-7102
2) Government will supply template.
3) Government will supply specific title block information to be used.
D. Manuals:
1. Copies:
a. Printed copies: Bound and indexed
b. Electronic copies: Adobe pdf on CD or DVD disks
1) Bookmark longer files (in excess of 50 pages) in a manner consistent with the Table of Contents.
2. Contents:
a. Parts identification lists, lists of special tools and accessories.
b. Schematics and wiring diagrams.
c. Detailed instructions for installing, operating, lubricating, and maintaining equipment.
d. As-built drawings, photographs and test records or reports if required by the specification.
E. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
Submittals
Revised 01 33 00 - 3
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
F. Certifications:
1. Certifications by a Registered Professional: Signed and sealed by registered professional.
2. Manufacturer’s Certifications: Signed by authorized representative of manufacturer.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals
Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of
Submittals.
1. Electronic submittals:
a. In Portable Document Format (PDF).
1) Optical Character Recognition (OCR).
2) 508 compliant.
3) RSNs having more than one requirement shall be bookmarked.
4) RSNs with requirements for files other than PDF (e.g. .XER, .PLF, .DWGs, etc) shall be combined using WINZip.
b. Include RSN transmittal letter.
c. Personally Identifiable Information (PII) shall be encrypted using WINZip or Adobe Acrobat before transmitting electronically.
2. Submit electronic submittals via email, CD/DVD, or thumb drive based on size:
a. The Government can receive e-mails up to 25 MB. However, e-mails over
10 MB should be considered extra-large. E-mailing of electronic submittals exceeding 10 MB should only occur after transmittal of larger size e-mail has been verified.
b. Address e-mail of electronic submittals less than extra-large size to:
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 4
1) sha-GPR-CONSTSVCS@usbr.gov
c. Electronic submittals that are too large to e-mail shall be submitted on CD, DVD, or thumb drive.
d. Submittals received after 5:00 p.m. Mountain Time, shall be documented as received the next business day.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
a. Resubmitted drawings shall include revision block with date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 14 days after receiving the comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
5. Resubmittals shall be complete submittals without reference to the original submittal.
F. Each submittal shall be submitted under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned to the Contractor for resubmittal.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.
B. Time in Excess of Specified:
1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.
mailto:sha-GPR-CONSTSVCS@usbr.gov
Revised 01 33 00 - 5
a. The time extension will be to the extent that excess review time caused delay to the contract completion date.
b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending the Contract completion date.
2. No time extension will be allowed if the Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to the extent that:
a. Approval was required under the contract, and,
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at
FAR 52.242-14, Suspension of Work, however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Submittal Response:
1. Response letter will indicate whether submittal is acceptable, not acceptable, approved, not approved, or acknowledged receipt.
a. Revise and resubmit submittals not approved.
b. Do not change designs without approval of the CO after drawings, documentation, and technical data have been approved.
1.07 TRANSMITTALS
A. Addresses for codes listed in Table 01 33 00A - List of Submittals:
1. Where the recipient is the Contracting Officer, address the transmittal letter to:
a. CO: Bureau of Reclamation, Attention: GP-5000, P.O. Box 36900, Billings, MT 59107-6900.
b. Physical address: 2021 4th Avenue North, Billings, MT 59101.
2. Where the recipient is the Contracting Officer’s Representative, address the transmittal letter to:
a. COR: Bureau of Reclamation, Attention: GP-2600, P.O. Box 36900, Billings, MT 59107-6900
b. Physical address: 2021 4th Avenue North, Billings, MT 59101.
B. E-mail address for electronic submittals listed in Table 01 33 00A - List of Submittals:
sha-GPR-CONSTSVCS@usbr.gov mailto:sha-GPR-CONSTSVCS@usbr.gov
Revised 01 33 00 - 6
1. Submit electronic submittals that are too large for e-mail to the physical address above.
C. Submittals required by the specifications, but not listed in Table 01 33 00A - List of
Submittals:
1. Submit in accordance with this section.
2. Submit to COR, unless otherwise specified.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 7
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
Price Schedules A Required Submittals
1 Bonds
(52.228-15)
Performance and payment bonds
Within 10 calendar days after award of
Task Order
CO 1 electronic 0
2 Insurance-work on a
Government
Installation
1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
At least 28 days before mobilization
CO 1 electronic
1 electronic
3 Liability insurance
(1452.228-70)
Acceptable
Certificate of
Liability
Insurance
At least 28 days before mobilization
CO 1 electronic 0
4 Reporting
Executive
Compensation and First Tier
Subcontract
Awards
52.204-10
Certification that executive compensation and subcontract awards were reported
Within 28 days of each report being submitted
CO 1 electronic 0
5 Equal
Opportunity
(52.222-26)
Information required by
Executive
Order 11246
(SF-100)
Within 30 days following award
CO 1 electronic 0
6 Release of
Claims
1452.204-70
Release of
Claims (DI-
137) against the
Government
After completion of the work and prior to final payment
CO 1 electronic 0
7 Payroll and
Basic Records
(52.222-8)
Copies of all payrolls
Weekly for each week of contract performance
CO 1 electronic encrypted
1 electronic encrypted
8 Labor Standards
Data
(52.222-11)
List of subcontractors
Submitted and approved at least
28 days before mobilization
COR 1 electronic 1 electronic
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 8
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
9 Labor Standards
Data
(52.222-11)
Statement and
Acknowledgm ent Form (SF-
1413) for each subcontract
Submitted and approved at least
28 days before mobilization
COR 1 electronic 1 electronic
10 Site Security
GP-7
List of all contractor and subcontractor employees
Submitted and approved at least
28 days before mobilization
COR 0 1 electronic encrypted
11 Site Security
GP-7
List of all vehicles and equipment to be brought on site
Submitted and approved at least
28 days before mobilization
COR 0 1 electronic
12 Implementation of Homeland
Security
Presidential
Directive
(HSPD-12)
GP-3
GP-PIV-1 and
OF-306 for each contractor and subcontractor that will be working at the
Government
Facility
At least 30 days prior to an employee’s arrival on site
CO 1
electronic
Encrypted
13 Superintendence by the
Contractor
52.236-6
Site
Superintendent
Submitted and approved at least
28 days before mobilization
COR 0 1 electronic
14 Schedule of
Value
H.3
Schedule of
Values
Required for lump-sum items for each bid schedule:
Submitted and approved before any payments other than Bonds
COR 0 1 electronic
01 14 10-1 Use of Site Area Use Plan Submitted and approved at least
28 days before mobilization
COR 0 1 electronic
01 14 30-1 Interruption of
Service
Interruption of
Service
Request
Submitted and approved at least
28 days before interruption
COR 0 1 electronic
01 31 19-1 Project
Management and
Coordination
Pre-Design
Meeting
Agenda
At least 28 days before meeting
COR 0 1 electronic
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 9
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
01 31 19-2 Project
Management and
Coordination
Pre-Design
Meeting
Minutes
Within one week after meeting is held
COR 0 1 electronic
01 31 19-3 Project
Management and
Coordination
Weekly
Coordination
Meeting
Documentation
5 calendar days prior to meeting
COR 0 1 electronic
01 32 10-1 Construction
Program
Baseline
Schedule
Within 21 days after receipt of
Notice To Proceed and approved before mobilization
COR 1 electronic 1 electronic
01 32 10-2 Construction
Program
Updated
Schedule
Monthly COR 1 electronic 1 electronic
01 35 10-1 Safety Data
Sheets
Complete
LHM and SDS
At least 28 days before jobsite delivery of hazardous material
COR 0 1 electronic
01 35 10-2 Safety Data
Sheets
Updated LHM and SDS
At least 28 days before jobsite delivery of hazardous material not previously listed
COR 0 1 electronic
01 35 20-1 Safety and
Health
Safety
Program
Submitted and accepted at least 28 days before on-site work begins
COR 0 1 electronic
01 35 20-2 Safety and
Health
Monthly
Accident
Summary
Reports
First day of each month
COR 0 1 electronic
01 35 20-3 Safety and
Health
Respirator
User
Documentation
Submitted and accepted at least 28 days before on-site work begins
COR 0 1 electronic
01 35 20-4 Safety and
Health
Crane
Operation
Certificates
Submitted and accepted at least
28 days before on-site work begins
COR 0 1 electronic
01 35 20-5 Safety and
Health
Exposure
Assessment
Form
Submitted and accepted at least
28 days before on-site work begins
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 10
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
01 35 20-6 Safety and
Health
Other Training
Certificates
At least 28 days before beginning work
COR 0 1 electronic
01 35 20-7 Safety and
Health
Pandemic
Notification
Within 24-hours of positive testing
COR 0 1 electronic
01 35 20-8 Safety and
Health
Employee
Return to
Work
Documentation
Submitted and accepted before employee returns to work
COR 0 1 electronic
01 35 30-1 Contractor’s
Onsite Safety and Health
Personnel
Qualifications Submitted and approved at least
28 days before on-site work begins.
COR 0 1 electronic encrypted
01 35 30-2 Contractor’s
Onsite Safety and Health
Personnel
Safety
Inspection
Reports
Within 7 days of inspection.
COR 0 1 electronic
01 46 00-1 Quality
Procedures
Contractor
Quality
Control
Program
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 46 00-2 Quality
Procedures
Contractor’s
Daily Reports
Weekly COR 0 1 electronic
01 46 00-3 Quality
Procedures
Quality
Control
Supervisor
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 54 20-1 Use of
Government
Crane and Tools
Crane Use
Schedule
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 55 00-1 Vehicular
Access and
Parking
Temporary
Site Access and Parking
Plan
Submitted and approved t least 28 days before on-site work begins
COR 0 1 electronic
01 74 10-1 Cleaning and
Waste
Management
Waste
Production and
Disposal Plan
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 74 10-2 Cleaning and
Waste
Management
Monthly
Tabulation of
Construction and
Demolition
Waste
Monthly COR 0 1 electronic
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 11
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
01 78 30-1 Project Record
Documents
As-built
Drawings
Within 28 days of completion of work
COR 0 1 electronic
01 78 30-2 Project Record
Documents
Operations and
Maintenance
Manual
Within 28 days of completion of first unit
COR 0 1 electronic
01 78 30-3 Project Record
Documents
Extra
Materials
Within 7 days of shipping of equipment
COR 0 1 electronic
01 78 30-4 Project Record
Documents
Warranties Within 28 days after commissioning units
COR 0 1 electronic
02 80 10-1
General
Requirements for Coatings
Containing
Hazardous
Materials
Abatement
Resumes and
Qualifications
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
02 80 10-2
General
Requirements for Coatings
Containing
Hazardous
Materials
Abatement
Worker
Protection Plan
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
02 80 10-3
General
Requirements for Coatings
Containing
Hazardous
Materials
Abatement
Background
Results for
Arsenic, Cadmium, and
Lead
Submitted and approved at least
28 days before on-site work begins.
COR 0 1 electronic
02 80 10-4
General
Requirements for Coatings
Containing
Hazardous
Materials
Abatement
Working Level
Test Results for
Arsenic, Cadmium, and
Lead
Weekly during
Coatings Removal
Revised 01 33 00 - 12
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
02 80 10-5
General
Requirements for Coatings
Containing
Hazardous
Materials
Abatement
Air Clearance
Results
Within 2 days of sampling.
COR 0 1 electronic
02 83 30-1
Removal and
Disposal of
Coatings
Containing
Regulated
Metals
Qualifications
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
02 83 30-2
Removal and
Disposal of
Coatings
Containing
Regulated
Metals
Coating
Removal
Debris
Abatement Plan
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
02 83 30-3
Removal and
Disposal of
Coatings
Containing
Regulated
Metals
Waste
Characterizatio n, Handling, and Disposal
Plan
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
02 83 30-4
Removal and
Disposal of
Coatings
Containing
Regulated
Metals
Waste
Characterizatio n Report
Within 14 days of analysis COR 0 1 electronic
02 83 30-5
Removal and
Disposal of
Coatings
Containing
Regulated
Metals
Manifest for
BOR Signature
After At least 14 days prior to shipping
Hazardous Waste
COR 0 1 electronic
02 83 30-6
Removal and
Disposal of
Coatings
Containing
Regulated
Metals
Manifest from
TSDF
Within 45 days of shipping to TSDF.
Revised 01 33 00 - 13
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
02 83 30-7
Removal and
Disposal of
Coatings
Containing
Regulated
Metals
Bill of Lading Within 7 days of shipping.
COR 0 1 electronic
22 11 85-1 Generator Air
Coolers
Approval
Drawings and
Data
Within 91 days of
Notice to Proceed
COR 0 1 electronic
22 11 85-2 Generator Air
Coolers
Test Plans Submit at least 91 days before manufacturing
COR 0 1 electronic
22 11 85-3 Generator Air
Coolers
Test Reports Within 21 days after tests are completed
COR 0 1 electronic
22 11 85-4 Generator Air
Coolers
Final
Drawings and
Data
Within 21 days after tests are completed
COR 0 1 electronic
26 05 10-1 Conductors and
Cables
Approval Data Submit within 140 days after receipt of Notice to
Proceed
COR 0 1 electronic
26 05 10-2 Conductors and
Cables
Field Test
Reports
Within 28 days after commissioning each unit
COR 0 1 electronic
48 13 64-1 Stator Cores Work Platform
Approval
Drawings and
Data
Submit Within 91 days of Notice to
Proceed
COR 0 1 electronic
48 13 64-2 Stator Cores Stator Frame
Inspection
Procedure
Submit Within 91 days of Notice to
Proceed
COR 0 1 electronic
48 13 64-3 Stator Cores Stator Frame
Inspection
Report
Submit Within 91 days of Notice to
Proceed
COR 0 1 electronic
48 13 64-4 Stator Cores Approval
Drawings and
Data
Submit Within 91 days of Notice to
Proceed
COR 0 1 electronic
48 13 64-5 Stator Cores Manufacturing and Factory
Test
Procedures
Submit at least 91 days before manufacturing
COR 0 1 electronic
48 13 64-6 Stator Cores Factory Test
Reports
Within 21 days after tests are completed
Revised 01 33 00 - 14
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
48 13 64-7 Stator Cores Field
Assembly and
Test
Procedures
Submit at least 91 days before installation
COR 0 1 electronic
48 13 64-8 Stator Cores Field Test
Reports
Within 21 days after tests are completes
COR 0 1 electronic
48 13 71-1 Armature
Windings
Approval
Drawings
Submit within 91 days after Notice to Proceed
COR 0 1 electronic
48 13 71-2 Armature
Windings
Design Data Submit within 91 days after Notice to Proceed
COR 0 1 electronic
48 13 71-3 Armature
Windings
Manufacturing
Procedures
Submit at least 91 days before tests
COR 0 1 electronic
48 13 71-4 Armature
Windings
Factory Test
Procedures
Submit at least 91 days before tests
COR 0 1 electronic
48 13 71-5 Armature
Windings
Factory Test
Reports
Within 21 days after tests are completed
COR 0 1 electronic
48 13 71-6 Armature
Windings
Installation
Procedures
Submit at least 91 days before installation
COR 0 1 electronic
48 13 71-7 Armature
Windings
Field Test
Procedures
Submit at least 91 days before tests
COR 0 1 electronic
48 13 71-8 Armature
Windings
Field Test
Reports
Within 21 days after tests are completed
COR 0 1 electronic
48 13 71-9 Armature
Windings
Performance
Tests
Within 28 days after installation
COR 0 1 electronic
48 13 71-10 Armature
Windings
Warranty
Inspection
Procedures
Submit at least 90 days before first scheduled inspection
COR 0 1 electronic
48 13 71-11 Armature
Windings
Warranty
Inspection
Reports
Within 28 days after each inspection
COR 0 1 electronic
48 13 73-1 Field Windings Removal Plans and Procedures
Submit within 120 days after Notice to Proceed
COR 0 1 electronic
48 13 73-2 Field Windings Approval
Drawings
Submit within 120 days after Notice to Proceed
COR 0 1 electronic
48 13 73-3 Field Windings Refurbish and
Factory Test
Procedures
Submit at least 91 days before refurbishment
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 15
Table 01 33 00A
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
48 13 73-4 Field Windings Rotor
Inspection
Report
Within 21 days after inspection is completed
COR 0 1 electronic
48 13 73-5 Field Windings Factory Test
Reports
Within 21 days after tests are completed
COR 0 1 electronic
48 13 73-6 Field Windings Field
Assembly and
Test
Procedures
Submit at least 91 days before assembly
COR 0 1 electronic
48 13 73-7 Field Windings Field Test
Reports
Within 21 days after tests are completed
COR 0 1 electronic
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
Price Schedules B, D, F, and H (Supply) Required Submittals
1 Bonds
(52.228-15)
Performance and payment bonds
Within 10 calendar days after award of
Task Order.
CO 1 0
3 Liability insurance
(1452.228-70)
Acceptable
Certificate of
Liability
Insurance
At least 28 days before mobilization
CO 1 0
4 Reporting
Executive
Compensation and First Tier
Subcontract
Awards
52.204-10
Certification that executive compensation and subcontract awards were reported
Within 28 days of each report being submitted
CO 1 0
01 32 10-1 Construction
Program
Baseline
Schedule
Within 21 days after receipt of
Notice to Proceed and approved before mobilization
COR 1 electronic 1 electronic
01 32 10-2 Construction
Program
Updated
Schedule
Monthly COR 1 electronic 1 electronic
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 16
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
01 78 30-4 Project Record
Documents
Warranties Within 28 days after commissioning units
COR 0 1 electronic
22 11 85-1 Generator Air
Coolers
Approval
Drawings and
Data
Submit within 28 days after Notice to Proceed
COR 0 1 electronic
22 11 85-2 Generator Air
Coolers
Test Plans Submit at least 28 days before manufacturing
COR 0 1 electronic
22 11 85-3 Generator Air
Coolers
Test Reports Within 21 days after tests are completed
COR 0 1 electronic
22 11 85-4 Generator Air
Coolers
Final Drawings and Data
Within 21 days after tests are completed
COR 0 1 electronic
48 13 71-1 Armature
Windings
Approval
Drawings
Submit within 28 days after Notice to Proceed
COR 0 1 electronic
48 13 71-2 Armature
Windings
Design Data Submit within 28 days after Notice to Proceed
COR 0 1 electronic
48 13 71-3 Armature
Windings
Manufacturing
Procedures
Submit within 28 after Notice to
Proceed
COR 0 1 electronic
48 13 71-4 Armature
Windings
Factory Test
Procedures
Submit at least 28 days before tests
COR 0 1 electronic
48 13 71-5 Armature
Windings
Factory Test
Reports
Within 21 days after tests are
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 17
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
Price Schedules C, E, G, and I (Construction) Required Submittals
1 Bonds
(52.228-15)
Performance and payment bonds
Within 10 calendar days after award of
Task Order
CO 1 0
2 Insurance-work on a
Government
Installation
1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
At least 28 days before mobilization
CO 1
3 Liability insurance
(1452.228-70)
Acceptable
Certificate of
Liability
Insurance
At least 28 days before mobilization
CO 1 0
4 Reporting
Executive
Compensation and First Tier
Subcontract
Awards
52.204-10
Certification that executive compensation and subcontract awards were reported
Within 28 days of each report being submitted
CO 1 0
5 Equal
Opportunity
(52.222-26)
Information required by
Executive
Order 11246
(SF-100)
Within 30 days following award
CO 1 0
6 Release of
Claims
1452.204-70
Release of
Claims (DI-
137) against the
Government
After completion of the work and prior to final payment
CO 1 0
7 Payroll and
Basic Records
(52.222-8)
Copies of all payrolls
Weekly for each week of contract performance
CO 1 1 electronic encrypted
8 Labor Standards
Data
(52.222-11)
List of subcontractors
Submitted and approved at least
28 days before mobilization
COR 1 1 electronic
Revised 01 33 00 - 18
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
9 Labor Standards
Data
(52.222-11)
Statement and
Acknowledgm ent Form (SF-
1413) for each subcontract
Submitted and approved at least
28 days before mobilization
COR 1 1 electronic
10 Site Security
GP-7
List of all contractor and subcontractor employees
Submitted and approved at least
28 days before mobilization
COR 0 1 electronic encrypted
11 Site Security
GP-7
List of all vehicles and equipment to be brought on site
Submitted and approved at least
28 days before mobilization
COR 0 1 electronic
12 Implementation of Homeland
Security
Presidential
Directive
(HSPD-12)
GP-3
GP-PIV-1 and
OF-306 for each contractor and subcontractor that will be working at the
Government
Facility
At least 30 days prior to an employee’s arrival on site
CO 1
electronic encrypted
13 Superintendence by the
Contractor
52.236-6
Site
Superintendent
Submitted and approved at least
28 days before mobilization
COR 0 1 electronic
14 Schedule of
Value
H.3
Schedule of
Values
Required for lump-sum items for each bid schedule:
Submitted and approved before any payments other than Bonds
COR 0 1 electronic
01 14 10-1 Use of Site Area Use Plan Submitted and approved at least
28 days before mobilization
COR 0 1 electronic
01 14 30-1 Interruption of
Service
Interruption of
Service Request
Submitted and approved at least
28 days before interruption
COR 0 1 electronic
01 31 19-3 Project
Management and
Coordination
Weekly
Coordination
Meeting
Documentation
5 calendar days prior to meeting
Revised 01 33 00 - 19
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
01 32 10-1 Construction
Program
Baseline
Within 21 days after receipt of
Notice To Proceed and approved before mobilization
COR 1 electronic 1 electronic
01 32 10-2 Construction
Program
Updated
Monthly COR 1 electronic 1 electronic
01 35 10-1 Safety Data
Sheets
Complete LHM and SDS
At least 28 days before jobsite delivery of hazardous material
COR 0 1 electronic
01 35 10-2 Safety Data
Sheets
Updated LHM and SDS
At least 28 days before jobsite delivery of hazardous material not previously listed
COR 0 1 electronic
01 35 20-1 Safety and
Health
Safety Program Submitted and accepted at least 28 days before on-site work begins
COR 0 1 electronic
01 35 20-2 Safety and
Health
Monthly
Accident
Summary
Reports
First day of each month
COR 0 1 electronic
01 35 20-3 Safety and
Health
Respirator User
Documentation
Submitted and accepted at least 28 days before on-site work begins
COR 0 1 electronic
01 35 20-4 Safety and
Health
Crane
Operation
Certificates
Submitted and accepted at least
28 days before on-site work begins
COR 0 1 electronic
01 35 20-5 Safety and
Health
Exposure
Assessment
Form
Submitted and accepted at least
28 days before on-site work begins
COR 0 1 electronic
01 35 20-6 Safety and
Health
Other Training
Certificates
At least 28 days before beginning work
COR 0 1 electronic
01 35 20-7 Safety and
Health
Pandemic
Notification
Within 24-hours of positive testing
COR 0 1 electronic
01 35 20-8 Safety and
Health
Employee
Return to Work
Documentation
Submitted and accepted before employee returns to work
Revised 01 33 00 - 20
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
01 35 30-1 Contractor’s
Onsite Safety and Health
Personnel
Qualifications Submitted and approved at least
28 days before on-site work begins.
COR 0 1 electronic encrypted
01 35 30-2 Contractor’s
Onsite Safety and Health
Personnel
Safety
Inspection
Reports
Within 7 days of inspection.
COR 0 1 electronic
01 14 30-1 Interruption of
Service
Interruption of
Service Request
Submitted and approved at least
28 days before interruption
COR 0 1 electronic
01 46 00-1 Quality
Procedures
Contractor
Quality Control
Program
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 46 00-2 Quality
Procedures
Contractor’s
Daily Reports
Weekly COR 0 1 electronic
01 46 00-3 Quality
Procedures
Quality Control
Supervisor
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 54 20-1 Use of
Government
Crane and
Tools
Crane Use
Schedule
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 55 00-1 Vehicular
Access and
Parking
Temporary Site
Access and
Parking Plan
Submitted and approved t least 28 days before on-site work begins
COR 0 1 electronic
01 74 10-1 Cleaning and
Waste
Management
Waste
Production and
Disposal Plan
Submitted and approved at least
28 days before on-site work begins
COR 0 1 electronic
01 74 10-2 Cleaning and
Waste
Management
Monthly
Tabulation of
Construction and Demolition
Waste
Monthly COR 0 1 electronic
01 78 30-1 Project Record
Documents
As-built
Drawings
Within 28 days of completion of work
COR 0 1 electronic
01 78 30-2 Project Record
Documents
Operations and
Maintenance
Manual
Within 28 days of completion of first unit
COR 0 1 electronic
01 78 30-3 Project Record
Documents
Extra Materials Within 7 days of shipping of equipment
Pick-Sloan Missouri Basin Project, Montana Amendment No. 004
Submittals
Revised 01 33 00 - 21
RSN
Clause or
Section
Title
Submittals
Required
Due Date or
Delivery Time
Respon sible
Code
Sets to be sent:*
CO COR
01 78 30-4 Project Record
Documents
Warranties Within 28 days after commissioning units
COR 0 1 electronic
26 05 10-1 Conductors and
Cables
Approval Data Submit within 28 days after receipt of Notice to
Proceed
COR 0 1 electronic
26 05 10-2 Conductors and
Cables
Field Test
Reports
Within 28 days after commissioning each unit
COR 0 1 electronic
48 13 64-2 Stator Cores Stator Frame
Inspection
Procedure
Submit within 28 days of Notice to
Proceed
COR 0 1 electronic
48 13 64-3 Stator Cores Stator Frame
Inspection
Report
Submit within 28 days of Notice to
Proceed
COR 0 1…