This document is an amendment to a solicitation for the Norton Dam Shop Building Replacement project. The Bureau of Reclamation seeks to replace an existing shop building at the Norton Dam in Kansas. The amendment provides responses to questions from prospective contractors. It acknowledges a revised proposal due date of January 8, 2021 and clarifies design responsibilities, permitting requirements, and other project details. Specifically, the amendment confirms the contractor's delegated design responsibility for certain building elements. It also references relevant specification sections regarding safety management, utility capacity, and the type of heating system to be installed. The amendment is intended to inform contractors' proposals for the shop building replacement at the Norton Dam facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R6021R0011_Amd_0002.pdf | ||
| Sol_140R6021R0011_Amd_0001.pdf | ||
| Amendment No. 0001_0001.pdf | ||
| Sol_140R6021R0011.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R6021R0011 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
12/23/20200002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/18/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Shop Building Replacement, Norton Dam, Almena Unit, Kanaska Division, Pick-Sloan Missouri Basin Program, Kansas
Please see the following pages.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Darlene Dillon
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation No. 140R6021R0011 Amendment No. 0002
Description of amendment details: Please see For Informational Purposes below.
Acknowledgement: See Block 11 above regarding acknowledgement by offerors to this amendment. The Government requires acknowledgement of this amendment at the place designated for receipt of bids. (Please See Block 19 of the Standard Form 1442).
Receipt of Proposals: The date and hour for receipt of proposals is January 8, 2021 at 3:00 PM (Mountain Standard Time Zone).
Third Party: If you have provided a copy of this solicitation to another company or person, please forward this amendment accordingly.
For Informational Purposes: A list of questions from prospective contractors and their respective answers/responses are attached for informational purposes only.
Norton Shop Building Replacement Questions &Answers/Responses
1) Question: Is it the GCs delegated design responsibility for the foundation, PEMB and MEPs?
Response: Yes
2) Question: Will a civil design engineer and architect be required?
Response: Refer to Specification Section 13 34 30, Part1.04, Subpart A
3) Question: Certain aspects of the floor layout in the solicitation does not conform to code/safety requirements, is it the GCs delegated design responsibility to develop the proper layout, elevations, and safety requirements for the government?
Response: Refer to Specification Section 06 10 05, Part1.02, Subpart C.2
4) Question: Is permitting required?
Response: No.
5) Question: Is this project subject to Davis-Bacon wages?
Response: Refer to Specification Section J.
6) Question: Will the government be supplying a survey, topographical survey and geo-technical evaluation of the site?
Response: No.
7) Question: The government has cleared the lot; will the government be further grading, compacting and performing compaction tests on the lot prior to the GC arrival for foundation install?
Response: No. Refer to Note 2 on Drawing 492-701-60001
8) Question: If the budget goes beyond the estimated range of $500,000, will the government be open to value engineering?
Response: No.
9) Question: Will the GCs full-time, on-site superintendent be allowed to dual-hat the safety manager’s role?
Response: Refer to Specification Section 01 35 30, Part1.04, Subpart A.4
10) Question: Does the current electrical utility pole have the capacity to handle both the new and existing building upon completion of the project?
Response: Yes.
11) Question: The plans indicate a “propane heater” to be installed in the larger section of the warehouse, however, when on site there seems to be only natural gas. Will the government require the GC to tap into the existing natural gas system, extend the piping and connect to a new natural gas heater? Or will the government require the GC to provide a propane tank system for as-drawn propane heater?
Response: Refer to Specification Section 26 05 02, Part3.01, Subpart I. The drawing will be changed to natural gas to match the specification section. This drawing revision will not be made prior to the proposal due date.
12) Question: Government states that a benchmark will be given to the GC; please confirm.
Response: Yes.
13) Question: Can you tell me the basis of design or manufacturer for the Metal Building specification?
Response: There is no specific building manufacturer. Refer to Specification Section 13 34 30, Foundation and Metal Building System, for details on design requirements.
File details come from the government source that posted it. Updated .