Amendment 0005 Signed_0005.pdf
PDF 2 MB Posted
- Attached to
- WYAO - SE PP ROOF AND WINDOW REPLACEMENT
- Solicitation number
- 140R6020R0002
About this file
This document is an amendment to a federal solicitation for roof and window replacement work at the Seminoe Powerplant in Wyoming. The key details are as follows:
The amendment extends the proposal due date to November 6, 2020 at 2:00pm MDT. It revises drawings in the solicitation and adds one new drawing. Prospective contractors submitted questions which are answered to provide additional information. The amendment acknowledges that videos of the site have been made available upon request to help inform responses. The work involves removing the existing roof and replacing roofing materials to a depth specified in the specifications. It also includes abating caulking around damaged glass blocks and replacing specified window areas as shown in the drawings. The solicitation is issued by the Bureau of Reclamation for the Department of the Interior to solicit proposals for the roof and window replacement work at the Seminoe Powerplant facility.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
R60
Linda Melnick
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEMINOE POWERPLANT, SEMINOE POWERPL:ANT ROOF AND WINDOW REPLACEMENT, Kendrick Project, Wyoming
This amendment extends the proposal due date to: November 6, 2020 at 2:00pm MDT.
Bureau of Reclamation Missouri Basin Region Regional Office PO Box 36900 Billings MT 59107
Bureau of Reclamation Missouri Basin Region Regional Office 2021 4th Ave North Billings MT 59101
140R6020R0002
08/28/2020
SEE BLOCK 16C
X
Amendment No. 0004 Solicitation No. 140R6020R0002
Description of Changes: The following changes are hereby incorporated and made a part of this solicitation.
1. In Part I – The Schedule, Section C – Specifications, Section 52 00 00 – Drawings, remove pages 52 00 00-1 through 52 00 00-6, and substitute therefor the attached revised pages 52 00 00-1 through 52 00 00-6.
2. In Part I – The Schedule, Section C – Specifications, Section 52 00 00 – Drawings, attached new Drawing No. 144-D-60023 is hereby incorporated into and made a part of the solicitation.
Receipt of Proposals: The hour and date for receipt of proposals remain the same: October 28, 2020 at 2:00 PM MDT.
Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of bids (See Block 10 of the Standard Form 1442).
Third Party: If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
A list of questions from prospective contractors are also included with this amendment and are provided for informational purposes only.
Additional videos of the site have been made available for information only. The link to these will be made available upon request to lmelnick@usbr.gov.
mailto:lmelnick@usbr.gov
Amendment No. 0004 Solicitation No. 140R6020R0002
Prospective Contractor Questions and Answers
3. Clarification that we are only abating the caulking around damaged glass blocks and not all of the caulking.
A: Refer to Drawing No. 144-600-60049.
4. What is the substrate under the roof to be removed?
A: Refer to Drawing No. 144-D-2297.
5. What is the depth of material on the roof?
A: Refer to specifications Section 07 54 23, Paragraph 1.02 A.2.
6. Is there sufficient space at the base of the windows to erect scaffolding?
A: Refer to Drawing No. 144-D-1968.
Seminoe Powerplant Amendment No. 004 Seminoe Powerplant Roof and Window Replacement Solicitation No. 140R6020R0002
Drawings Revised 52 00 00 - 1
SECTION 52 00 00
DRAWINGS
PART 1 GENERAL
1.01 DISCREPANCIES, ERRORS, OR OMISSIONS
A. Inform the CO of discrepancies discovered on drawings in accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction.
B. In accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction, in case of discrepancies, written specifications take precedence over drawings unless otherwise specified.
1.02 PROJECT CONDITIONS
A. Where there are differences as determined by the CO between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.
1.03 SPECIFICATION DRAWINGS
A. Reference drawings referred to on specification drawings and not considered necessary for contract purposes are not included in specifications.
1.04 INFORMATION DRAWINGS
A. Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract.
These drawings do not show work to be performed under this contract.
B. If there are differences as determined by the CO between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.
1.05 COPIES OF DRAWINGS
A. The Government will not provide copies of drawings for the Contractor’s use. The Government will provide electronic read-only copies of drawings for the Contractor’s use in making drawing copies.
1.06 LIST OF DRAWINGS
A. Drawings listed in Table 52 00 00A - List of Drawings are made a part of Section C - Description/Specifications.
Drawings
Revised 52 00 00 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Revised 52 00 00 - 3
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
General:
1 144-D-4992 Seminoe and Kortes Powerplants Vicinity Map
2 144-600-60045 Seminoe Reservoir Recreation Area Borrow Area Site #2 Vicinity Map
3 144-600-60047 Seminoe Powerplant Site Plan`
Roof Replacement and Window Repair Details:
4 144-600-60048 Seminoe Powerplant Powerplant Roof Sections & Details
5 144-600-60049 Seminoe Powerplant Glass Block Replacement Replacement Areas
6 144-600-60050 Seminoe Powerplant Powerplant Roof and Window Replacement Roof Concrete Repair
Information Drawings:
7 144-D-3199 Seminoe Dam and Power Plant Plan, Elevations and Sections
8 144-D-431 Seminoe Power Plant Transverse Section on Center Line of Unit
9 144-D-1370 Seminoe Power Plant General Arrangement Transverse Section
10 144-D-1959 Seminoe Power Plant Substructure-Concrete Outline Section Plane at El. 6154.0 First Stage
Revised 52 00 00 - 4
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
11 144-D-1968 Seminoe Power Plant Substructure-Concrete Outline Transverse Sections Between 4 and 10 Lines First Stage
12 144-D-1982 Seminoe Power Plant Architectural Elevations
13 144-D-2298 Seminoe Power Plant Superstructure-Concrete-Outline Wall Details
14 144-D-2299 Seminoe Power Plant Superstructure-Concrete-Outline Sections and Details
15 144-D-1983 Seminoe Power Plant Architectural Details
16 144-D-2296 Seminoe Switchyard Superstructure-Concrete-Outline Plans
17 144-D-2297 Seminoe Power Plant Superstructure-Concrete Outline Elevations of Exterior Walls
18 144-D-2370 Seminoe Power Plant Roof Drains and Sanitary Vent Details
19 144-D-2383 Seminoe Power Plant Roofing - Details
20 144-D-2389 Seminoe Power Plant Glass Block Installation Plans and Details
21 144-D-2388 Seminoe Power Plant Miscellaneous Structural Steel Glass Block Supports
22 144-D-2656 Seminoe Power Plant Anchor Bolt and Stub Plan For Roof
Drawings Revised 52 00 00 - 5
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
23 144-D-3890 Seminoe Power Plant Construction Drawing Roof Alterations For Oil Circuit Breaker Pads
24 144-D-2357 Seminoe Power Plant Switching Station on Roof Steel Bus Structure – Sub Details
25 144-D-60023 Seminoe Powerplant River Outlet Works Repair and Stoplog Replacement Metalwork and Fencing Layout Miscellaneous Metalwork and Fencing Plan and Sections
END OF SECTION
Drawings Revised 52 00 00 - 6
This page intentionally left blank.
FO
R I
N
FO
R M
A
TI
O N
O N
LY
| 2020-10-28T13:52:35-0600 | |
| LINDA MELNICK |
File details come from the government source that posted it. Updated .