U.S. Department of the Interior Bureau of Reclamation Great Plains Region July 2019
Request for Proposal Solicitation No. 140R6019R0009
Casper Mountain East Microwave Building and Generator Addition
Transmission Division Maintenance and Service Area Facilities Pick-Sloan Missouri Basin Program Wyoming
U.S. Department of the Interior Bureau of Reclamation Great Plains Region July 2019
This page intentionally left blank
Casper Mountain East Microwave Building and Generator Addition Solicitation No. 140R6019R0009
Foreword – 1
CASPER MOUNTAIN EAST
MICROWAVE BUILDING AND GENERATOR ADDITION
Transmission Division Maintenance and Service Area Facilities
Pick-Sloan Missouri Basin Program Wyoming
FOREWORD
Work is located at Casper Mountain East – Radio Relay Station complex, in Natrona County, approximately 10 miles south of Casper, Wyoming. The Radio Relay Station complex is located approximately 600 yards east of State Route 251 and 40 yards south of Towerhill Campground Road (Route 506) at an approximate elevation of 8,100 feet.
The principal components of work to be performed under these specifications include the following:
1. Remove existing 17 foot by 8 foot corrugated metal building.
2. Prepare site for installation of 20 foot by 20 foot prefabricated concrete building including an adequate building foundation, designed by the Contractor, with a minimum of 12” of compacted gravel.
3. Furnish all materials and perform all work required to install new 20 foot by 20 foot two-room prefabricated concrete building.
4. Install double gate in chain link fence to align with prefabricated buildings double doors.
5. Disconnect and remove existing 15kW generator.
6. Furnish all materials and perform all work required to install a new 35kW generator and automatic transfer switch, to provide emergency backup power to the site.
7. Disconnect and remove existing fuel tank and associated gas lines.
8. Furnish all materials and perform all work required to install a new 500 gallon fuel tank.
9. Install electrical power distribution panels, breakers, cables, and service entrance so that utility power comes through the new building with automatic emergency backup generator controlled by automatic transfer switch.
INQUIRIES REGARDING THIS SOLICITATION SHOULD BE MADE TO:
Contractual Matters: Jeremy Gillespie Contract Specialist Bureau of Reclamation – Great Plains Region Billings, Montana jgillespie@usbr.gov mailto:jgillespie@usbr.gov
Foreword – 2
TYPE OF CONTRACT:
This requirement is solicited as a “Request for Proposal" (RFP) using the Federal Acquisition Regulation Part 15, Contracting by Negotiation. The Bureau of Reclamation anticipates award of a Firm Fixed Price contract.
MAGNITUDE OF PROJECT:
$250,000 - $500,000.
METHOD OF SUBMISSION OF PROPOSALS:
See Section L of this Solicitation.
BUSINESS SIZE COMPETITION REQUIREMENTS:
This acquisition is set-aside for Small Businesses.
NORTH AMERICAN INDUSTRIAL CLASSIFICATION SYSTEM (NAICS) CODE:
236220 – Commercial and Institutional Building Construction
PRE-PROPOSAL SITE VISIT: a pre-proposal site visit will be held on August 13th, 2019, at the Casper Mountain East Radio Relay Station, beginning at 10:00 a.m. local time. Prospective offerors interested in attending the pre-proposal site visit should contact Jeremy Gillespie at jgillespie@usbr.gov. Attendees shall bring and wear safety boots, hard hats, and safety vests.
For date and place of proposal submission, see “solicitation, offer, and award,” Standard Form 1442.
For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health Standards” including revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html which is applicable to work under this contract, see clause at “WBR 1452.223-81 Safety and Health.”
SYSTEM FOR AWARD MANAGEMENT (SAM):
Effective July 29, 2012 all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database prior to an award or agreement. Note: Registering in “SAM” does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS).
Additionally, the contractors “DUNS and BRADSTREET” and banking information are required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220.
INVOICE PROCESSING PLATFORM (IPP):
Payment requests for the anticipated contract or agreement must be submitted electronically through the U.S. Department of Treasury’s “Invoice Processing Platform” (IPP) System via the IPP website at https://www.ipp.gov. Contractors are required to use the IPP website to access http://www.usbr.gov/ssle/safety/RSHS/rshs.htm
Foreword – 3 and use IPP for submitting request for payment. Registration assistance can be obtained by contacting the “IPP Production Helpdesk” via email ippgroup@bos.fbr.org or phone 1-866-973- 3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor can submit a waiver request in writing to the Contractor Officer with its proposal. Note: Waivers will be on a case by case basis and not automatically granted as determined by the Contract Officer.
This Page Intentionally Left Blank.
Table of Contents
TABLE OF CONTENTS
PART I
SECTION A SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442
SECTION B PRICE SCHEDULE
SECTION C DESCRIPTION / SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 15 Adjacent Land Requirements 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 – EXISTING CONDITIONS
02 83 33 Removal and Disposal of Equipment with Coatings Containing Regulated Metals
DIVISION 03 – CONCRETE
03 47 40 Structural Prefabricated Concrete Building
DIVISION 04 through DIVISION 25 – NOT USED
DIVISION 26 – ELECTRICAL
26 05 02 Basic Electrical Materials and Methods
Microwave Building and Generator Addition Solicitation No. 140R6019R0009
Table of Contents
26 05 10 Conductors and Cables 26 05 20 Grounding and Bonding 26 05 33 Electrical Conduit 26 05 90 Wiring Checkout and Tests 26 24 24 Distribution Panelboards 26 32 10 Engine-Generator Set 26 51 10 Luminaires
DIVISION 27 through DIVISION 30 – NOT USED
DIVISION 31 – EARTHWORK
31 02 10 Water for Dust Abatement 31 11 00 Clearing and Grubbing 31 14 10 Stripping 31 23 02 Compacting Earth Materials 31 23 11 Earthwork for Structures 31 23 39 Disposal of Excavated Materials
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 15 10 Compacted Gravel 32 31 01 Fence Grounding 32 31 10 Chain Link Fence
DIVISION 33 through DIVISION 50 – NOT USED
DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 10 01 Photo Log
DIVISION 52 – DRAWINGS
DIVISION 53 – NOT USED
SECTION D – PACKAGING AND MARKING – NOT USED
SECTION E – INSPECTION AND ACCEPTANCE
E.1 Material and Workmanship .................................................................................... E-2 E.2 Inspection of Construction .................................................................................... E-2 E.3 Warranty of Construction ....................................................................................... E-3
SECTION F – DELIVERIES OR PERFORMANCE
F.1 Commencement, Prosecution, and Completion of Work ...................................... F-2 F.2 Suspension of Work ............................................................................................... F-2
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 Authorities and Delegations .................................................................................. G-2
Microwave Building and Generator Addition Solicitation No. 140R6019R0009
G.2 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) ....................................................................................................... G-3
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 Site Security .......................................................................................................... H-2 H.2 Schedule of Values ................................................................................................ H-3 H.3 Payment for Technical Data .................................................................................. H-3
PART II
SECTION I – CONTRACT CLAUSES
I.1 Clauses Incorporated by Reference ......................................................................... I-2 I.2 Commercial and Government Entity Code Maintenance ....................................... I-4 I.3 Basic Safeguarding of Covered Contractor Information Systems .......................... I-5 I.4 Order of Precedence – Uniform Contract Format ................................................... I-7 I.5 Minimum Wages Under Executive Order 13658.................................................... I-7 I.6 Estimate of Percentage of Recovered Material Content for EPA Designated Items .................................................................................................................... I-12 I.7 Buy American – Construction Materials .............................................................. I-12 I.8 Bid Guarantee........................................................................................................ I-16 I.9 Additional Bond Security ...................................................................................... I-16 I.10 Performance and Payment Bonds - Construction ................................................. I-17 I.11 Payments Under Fixed-Price Construction Contracts .......................................... I-18 I.12 Prompt Payment for Construction Contracts ........................................................ I-21 I.13 Differing Site Conditions ...................................................................................... I-29 I.14 Accident Prevention Alternate I ............................................................................ I-29 I.15 Schedules for Construction Contracts ................................................................... I-31 I.16 Specifications and Drawings for Construction Alternate II .................................. I-31 I.17 Changes ................................................................................................................. I-33 I.18 Authorized Deviations in Clauses ......................................................................... I-34 I.19 Restrictions on Endorsements – Department of the Interior ................................. I-34 I.20 Release of Claims – Department of the Interior.................................................... I-34 I.21 Examination of Records by the Department of the Interior .................................. I-34 I.22 Liability Insurance – Department of the Interior .................................................. I-34 I.23 Asbestos-Free Warranty ........................................................................................ I-35 I.24 Safety and Health – Bureau of Reclamation ......................................................... I-35 I.25 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace – Bureau of Reclamation ................................. I-36 I.26 Certification of Representatives for Corporate Sureties – Bureau of Reclamation........................................................................................................... I-36 I.27 Equipment Ownership and Operating Expense – Bureau of Reclamation ........... I-37 I.28 Payment for Mobilization and Preparatory Work ................................................. I-39 I.29 Claims Accounting – Bureau of Reclamation ....................................................... I-41 I.30 Preservation of Cultural Resources – Bureau of Reclamation .............................. I-41 I.31 Security Requirements – Bureau of Reclamation ................................................. I-43 I.32 Modification Proposals – Bureau of Reclamation Alternate IV ........................... I-52
Microwave Building and Generator Addition Solicitation No. 140R6019R0009
PART III
SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
ATTACHMENT NUMBER 0001............Department of Labor General Decision: MT20190027 ATTACHMENT NUMBER 0002..................................................Standard Form 24 – Bid Bond ATTACHMENT NUMBER 0002......................................Subcontracting Percentage Worksheet
PART IV
SECTION K -- REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
K.1 Annual Representations and Certifications ........................................................... K-2
SECTION L -- INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
L.1 System for Award Management............................................................................. L-2 L.2 Commercial and Government Entity Code Reporting ........................................... L-3 L.3 Alternative Line Item Proposal .............................................................................. L-4 L.4 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 ................................................................................................. L-5 L.5 Availability of Specifications Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST) ................................................................................................... L-5 L.6 Submission of Offers in the English Language...................................................... L-6 L.7 Submission of Offers in U.S. Currency ................................................................. L-6 L.8 Instructions to Offerors – Competitive Acquisition ............................................... L-6 L.9 Type of Contract .................................................................................................. L-11 L.10 Construction Wage Rate Requirements – Secondary Site of Work ..................... L-11 L.11 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction ......................................................... L-11 L.12 Notice of Buy American Requirement – Construction Materials ........................ L-12 L.13 Site Visit (Construction) ...................................................................................... L-13 L.14 Preparation of Proposals – Construction .............................................................. L-14 L.15 Authorized Deviations in Provisions ................................................................... L-14 L.16 Use and Disclosure of Proposal Information – Department of the Interior ......... L-14 L.17 Service of Protest – Department of the Interior (Deviation) ................................ L-16 L.18 Source Evaluation and Selection Procedures – Bureau of Reclamation .............. L-16 L.19 General Proposal Instructions – Bureau of Reclamation ..................................... L-19 L.20 Technical Proposal Instructions – Bureau of Reclamation .................................. L-21 L.21 Pricing Proposal Instructions and Submission of Cost of Pricing Data – Bureau of Reclamation ............................................................................. L-24 L.22 Instruction for Mobilization and Preparatory Work Schedule Line Item ............ L-27
Microwave Building and Generator Addition Solicitation No. 140R6019R0009
SECTION M -- EVALUATION FACTORS FOR AWARD
M.1 Evaluation Factors for Award – Quality Predominance – Bureau of Reclamation ...................................................................................................... M-2 M.2 Notice of World Trade Organization Government Procurement Agreement Evaluations – Bureau of Reclamation ................................................................... M-5
END OF CONTENTS
PART I – THE SCHEDULE
SECTION A
SOLICITATION, OFFER, AND AWARD
(STANDARD FORM 1442)
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040441484
Bureau of Reclamation
Great Plains Region
Regional Office PO Box 36900
R60
Billings MT 59107
Jeremy Gillespie 406-247-7817
1x
140R6019R0009
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See Paragraph F.1 of the solicitation.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
calendar days and complete it within _____10____
NSN 7540-01-155-3212
x x x x
a. Sealed offers in original and (See Paragraph L.X) copies to perform the work required are due at the place specified in Item 8 by ________1500___________ (hour) local time
90_____________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
7/29/2019
Bureau of Reclamation Great Plains Region - GP5000 2021 4th Avenue North Billings, Montana 59101
Project Title: Casper Mountain East Microwave Building and Generator Addition
Location of the Work: Work is located at Casper Mountain East – Radio Relay Station complex, in Natrona County, approximately 10 miles south of Casper, Wyoming. The Radio Relay Station complex is located approximately 600 yards east of State Route 251 and 40 yards south of Towerhill Campground Road (Route 506) at an approximate elevation of 8,100 feet.
Set-Aside Information: Total Small Business Set-aside.
North American Industrial Classification Code(NAICS): 236220 – Commercial and Institutional Building Construction
Estimated Magnitude: The magnitude of this project is estimated between $250,000.00 and $500,000.00
Small Business Size Standard: $36.5 Million
This solicitation uses Request for Proposal procedures in accordance with FAR Part 15 - Contract by Negotiation, and is expected to result in a Firm Fixed Price Contract.
Proposals will be received at the Bureau of Reclamation Great Plains Regional Office via email to jgillespie@usbr.gov. Hand-Carried proposals and express mail proposals will be received at the Bureau of Reclamation, Department of the Interior Building, Acquisition Services, GP-5000, 2021 4th Avenue North, Billings, Montana 59101. Individuals delivering proposals in person shall possess valid photo identification and allow adequate time to pass through on-site security.
Taxpayer Identification Number: __________________________________
Data Universal Numbering System: _________________________________
Commercial and Government Entity Code: ___________________________
______200______calendar days after receiving
8/29/2019
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Great Plains Region
Regional Office PO Box 36900
R60
Billings MT 59107
Jeremy Gillespie
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
The Invoice Processing Platform https://www.ipp.gov
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R6019R0009
00010
SECTION B Supplies or Services and Prices
Casper Mountain East - Microwave Building and Generator Addition
(Price Schedule CLINS 1-7)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1 AU $___________ $________________
SECTION B
THE SCHEDULE
Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
CASPER MOUNTAIN EAST
MICROWAVE BUILDING AND
GENERATOR ADDITION
Transmission Division
Pick-Sloan Missouri Basin Program Wyoming
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(c) Offerors are strongly encouraged to attend Pre-Proposal Site Visit.
(d) Definitions:
(1) CLIN – Contract Line Item Number
Price Schedule
B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Unit Price Amount
1 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum of
2 02 83 33 Removal of Corrugated Metal Building Containing Lead Paint, Interior Equipment and Two Propane Tanks and Associated Underground Pipe.
For the lump sum of
3 03 47 40 Furnish and Install Prefabricated Concrete Building
For the lump sum of
4 26 32 10 Relocate Power Service to Site, and Test Emergency Generator Operation
For the lump sum of
5 26 32 10 Furnish and Install 35kW Generator
For the lump sum of
6 32 15 10 Site Preparation and Adequate Building Foundation, Designed by the Contractor, with Minimum of 12” of Compacted Gravel.
For the lump sum of
7 32 31 10 Install Double Gate in Chain Link Fence
For the lump sum of
TOTAL FOR PRICE SCHEDULE $_________________
SECTION C
THE STATEMENT OF WORK
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located at Casper Mountain East – Radio Relay Station complex, in Natrona County, approximately 10 miles south of Casper, Wyoming. The Radio Relay Station complex is located approximately 600 yards east of State Route 251 and 40 yards south of Towerhill Campground Road (Route 506) at an approximate elevation of 8,100 feet.
1.02 PRINCIPAL COMPONENTS OF WORK
A. The principal components of work to be performed under these specifications include the following:
1. Remove existing 17 foot by 8 foot corrugated metal building and interior equipment as shown in Section 51 10 01 – Photo Log.
2. Prepare site for installation of 20 foot by 20 foot prefabricated concrete building including an adequate building foundation, designed by the Contractor, with a minimum of 12” of compacted gravel.
3. Furnish all materials and perform all work required to install new 20 foot by 20 foot two-room prefabricated concrete building.
4. Install double gate in chain link fence to align with prefabricated buildings double doors.
5. Disconnect and remove existing 15kW generator.
6. Furnish all materials and perform all work required to install a new 35kW generator and automatic transfer switch, to provide emergency backup power to the site.
7. Disconnect and remove existing fuel tank and associated gas lines.
8. Furnish all materials and perform all work required to install a new 500 gallon fuel tank.
9. Install electrical power distribution panels, breakers, cables, and service entrance so that utility power comes through the new building with automatic emergency backup generator controlled by automatic transfer switch.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
Summary of Work
01 11 00 - 2
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 52:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Use of Site 01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. Cleaning Manual – 2012 Inspection and Cleaning Manual for Equipment and
Vehicles to Prevent the Spread of Invasive Species (Technical Memorandum No. 86-68220-07-05) 2012 Edition. Available online at:
http://www.usbr.gov/mussels/prevention
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
1. For each Contractor use site on Government land.
a. Show use location and extent of impact. Uses include but are not limited to the following:
1) Buildings and service areas including storage areas.
a) Fuel and oil storage areas, shall be maintained within contractor vehicles.
2) Parking areas, temporary roads, and haul routes.
3) Utilities including air, power, and water lines.
4) First-aid and medical facilities.
5) Areas for processing, storing, and disposing of waste materials from construction operations.
6) Temporary fences.
b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
01 14 10 - 2
c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.
d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
1.04 PROJECT CONDITIONS
A. Bureau of Reclamation land as shown on drawings in Division 52 – Drawings, may be used for required construction activities.
B. Contractor parking area and storage shown on Drawing 467-703-60027.
C. Location, construction, operation, maintenance, and removal of construction facilities on Reclamation land will be subject to approval of COR.
D. All power to existing buildings must be restored overnight.
E. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.
F. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.
G. Project site work hours are 7:30 a.m. – 5:00 p.m., Monday through Friday. Construction work schedules outside of work hours identified must be coordinated and approved by the COR.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CLEANING
A. Construction equipment:
1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.
2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in USBR Cleaning Manual.
01 14 10 - 3
3. COR will inspect construction equipment following procedures described in USBR Cleaning Manual before allowing equipment onsite.
B. Restore Contractor use areas to pre-construction condition.
C. After completion of work, regrade and scarify Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate revegetation, provide proper drainage, and prevent erosion.
01 14 10 - 4
This page intentionally left blank.
Adjacent Land Requirements
01 14 15 - 1
SECTION 01 14 15
ADJACENT LAND REQUIREMENTS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work, except as specified.
B. Contractor is responsible for restoration costs and repair of damage from unauthorized work in restricted areas,
1.02 PROJECT CONDITIONS
A. For operations performed on national forest land, comply with applicable rules and regulations of Secretary of Agriculture governing use and occupancy of national forests regarding disposal of timber; prevention and control of forest fires; sanitation; land occupancy for camps, storage yards, temporary roads, borrow areas for roads, and other construction-related operations and activities; and other rules and regulations which generally govern construction work performed on these lands.
B. Obtain from Natrona County, through the CO, necessary permits and instructions which relate to use and occupancy of county forest lands and use of forest products.
C. Contractor shall be responsible for restoration costs and damages resulting from unauthorized operations outside of project areas.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 PREVENTION AND CONTROL OF FOREST FIRES
A. Take special precautions to prevent fires.
1. Contractor shall be responsible for suppression costs and may be held liable for damages outside or inside working area resulting from Contractor's negligence.
2. If fire suppression becomes necessary due to Contractor's negligence and
Contractor cannot promptly furnish adequate labor, subsistence, supplies, and
Adjacent Land Requirements
01 14 15 - 2 transportation; surrounding land owners are authorized to procure such items and services as land owners may deem necessary and charge cost to Contractor.
Submittals
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME) ASME Y14.1-12 Decimal Inch Drawing Sheet Size and
Format
B. National Institute of Building Sciences (NIBS) NIBS NCS-14 United States National CAD Standards, Version 6
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236- 21, Specifications and Drawings for Construction.
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number and title, and RSN.
3. Measurement Units: US Customary Units.
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
01 33 00 - 2
b. Contractor’s or supplier’s title and drawing number.
c. Date.
2. Provide space next to title block for review stamps.
3. Size: D size (22 inches by 34 inches).
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.
a. Lettering shall be neat when drawing preparation with drafting equipment is allowed.
5. Final drawings:
a. Drawing format: AutoCAD, Version 2007 or later.
b. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
c. Electronic files: On CD or DVD discs.
d. Original plots: D size (22-inch by 34-inch).
e. Government will provide an electronic AutoCAD template.
D. Product Data:
1. Mark manufacturer’s data for commercial products or equipment, such as catalog cut sheets.
a. Identify manufacture’s name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike out items that do not apply.
E. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Check certifications before incorporating the material in the work to ensure that the requirements of the contract have been met. Material accepted by certification may be
01 33 00 - 3 sampled and tested. If material is determined not to conform with the contract, the material will be rejected whether in place or not.
C. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
D. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A - List of Submittals.
1. Electronic submittals:
a. In Portable Document Form (PDF).
b. Include RSN transmittal letter.
c. Do not include Personally Identifiable Information (PII) in electronic submittals.
2. Submit electronic submittals via email or CD/DVD based on size:
a. The Government can receive e-mails up to 15 MB. However, e-mails over 10 MB should be considered extra large. E-mailing of electronic submittals exceeding 10 MB should only occur after transmittal of larger size e-mail has been verified.
b. Address e-mail of electronic submittals less than extra large size to:
1) kkarstoft@usbr.gov
c. Include electronic submittals that are too large to e-mail with paper copy of submittal. These electronic submittals shall be on CD or DVD.
E. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
F. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 14 days after receiving comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
mailto:kkarstoft@usbr.gov
01 33 00 - 4
G. Each RSN shall be submitted under a separate transmittal letter. Multiple RSN’s submitted under a single letter will be returned to the Contractor for resubmittal.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date.
B. Time in Excess of Specified:
1. The CO may extend contract completion date to allow additional time for completing work affected by excess review time.
a. Time extension will be to extent that excess review time caused delay to contract completion date.
b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of 2 or more separate submittals or resubmittals will be counted only once in extending contract completion date.
2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to extent that:
a. Approval was required under contract, and.
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR
52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Submittal Response:
1. A response letter from the COR for each submittal will be sent to the Contractor indicating if the submittal is either approved, approved subject to identified changes, or not approved.
a. Revise and resubmit submittals not approved.
b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.
01 33 00 - 5
1.07 TRANSMITTAL
A. Addresses for codes listed in Table 01 33 00A - List of Submittals:
1. Where the recipient is the Contracting Officer, address the transmittal letter to
Bureau of Reclamation, Attention: GP-5000, P.O. Box 36900, Billings, MT 59107-6900. Physical address is 2021 4th Avenue North, Billings, MT 59101.
2. Where the recipient is the Contracting Officer’s Representative, address the transmittal letter to Bureau of Reclamation, Attention: WY-6600, P.O. Box 1630, Mills, WY 82644. Physical Address is 705 Pendell Blvd, Mills, WY 82644.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Table 01 33 00 A – List of Submittals
*CO indicates Contracting Officer and COR indicates Contracting Officer’s Representative.
** RSN to be submitted separately for each different building.
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Responsible code
Sets to be sent: **
CO COR
1 Bonds 52.228-15
Performance and Payment Bonds
Within 10 calendar days after award
CO 1 paper 0
2 Insurance-work on a Government Installation 1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
Before commencing onsite work
CO 1 paper
1 paper
3 Liability Insurance 1452.228-70
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the contract
CO 1 paper 0
4 Equal Opportunity 52.222-26
Information required by Executive Order
112246 (SF-100)
Within 30 days following award
CO 1 paper 0
01 33 00 - 6
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Responsible code
Sets to be sent: **
CO COR
5 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10
Certificate that executive compensation and subcontract awards were reported
Within 10 days of each report being submitted
CO 1 paper 0
6 Release of Claims 1452.204-70
Release of Claims (DI-137) against the Government
After completion of the work and prior to final payment
CO 1 paper 0
7 Site Security
GP-7
List of all contractor and subcontractor employees
At least 10 days prior to arriving at worksite
COR 0 2 paper
8 Site Security
GP-7
List of all vehicles and equipment to be brought onsite
At least 10 days prior to arriving at worksite
COR 0 2 paper
9 Labor Standards Data 52.222-11
1) List of subcontractors
2) Statement and acknowledgement Form (SF-1413) for each subcontract
Within 14 days after award of contract
COR 1 paper
1 paper
1 paper + 1 electronic
1 paper + 1
10 Payrolls 52.222-08
Copies of all payrolls Weekly for each week of contract performance
COR 1 paper 2 paper
11 Schedules for Construction Contracts 52.236-15
Practicable schedule Within 5 days after work commences on the contract or another period of time as determined by Contracting Officer
COR 1 paper 1 paper + 1 electronic
12 Schedules for Construction Contracts 52.236-15
Updated schedule showing actual progress
Monthly or as directed by the Contracting Officer
COR 1 paper 1 paper + 1 electronic
Division 01 – General 01 14 10-1 Use of Site Land Use And
Landscape Rehabilitation Plan
At least 28 days before use of Government land
COR 0 1 paper + 1 electronic
01 35 10-1 Safety Data Sheets Complete LHM And
SDS
At least 14 days before jobsite delivery of hazardous material
COR 0 1 paper + 1 electronic
01 35 10-2 Safety Data Sheets Updated LHM And
SDS
At least 14 days before jobsite delivery of hazardous material not previously listed
COR 0 1 paper + 1
01 33 00 - 7
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Responsible code
Sets to be sent: **
CO COR
01 35 20-1 Safety and Health Safety Program Submitted and accepted before commencing onsite work. See Section 3 of RSHS
COR 0 1 paper + 1 electronic
01 35 20-2 Safety and Health Monthly Accident Summary Report
First day of each month. See paragraph
3.8 of RSHS
COR 0 1 paper + 1 electronic
01 35 20-3 Safety and Health Crane Training Certificates
At least 21 days before arriving at worksite.
COR 0 1 paper + 1 electronic
01 35 20-4 Safety and Health Other Training Certificates
At least 21 days before arriving at worksite.
COR 0 1 paper + 1 electronic
01 35 30-1 Contractor’s Onsite Safety and Health Personnel
Qualifications At least 21 days before beginning work
COR 0 1 paper + 1 electronic
01 35 30-2 Contractor’s Onsite Safety and Health Personnel
Safety Inspection Reports
Monthly COR 0 1 paper + 1 electronic
01 35 30-3 Contractor’s Onsite Safety and Health Personnel
CIH Reports Monthly COR 0 1 paper + 1 electronic
01 46 20-1 Testing Agency Services
Testing Agency Services Plan
At least 21 days before arriving at worksite.
COR 0 1 paper + 1 electronic
01 55 20-1 Traffic Control Traffic Control Plan At least 21 days before arriving at worksite.
COR 0 1 paper + 1 electronic
01 55 20-2 Traffic Control Natrona County Right-of-Way Permit
At least 21 days prior to road closure.
COR 1 1 paper + 1 electronic
01 56 10-1 Protection of Existing Installations
Plan for Protecting Existing Installations
At least 21 days before beginning onsite work
COR 0 1 paper + 1 electronic
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
At least 21 days before beginning onsite work
COR 0 1 paper + 1 electronic
01 57 30-1 Water Pollution Control
Water Management Plan
At least 21 days before beginning onsite work.
COR 0 1 paper + 1 electronic
01 57 30-2 Water Pollution Control
Spill Prevention, Control and Countermeasure Plan
At least 21 days before beginning onsite work
COR 0 1 paper + 1 electronic
01 71 20-1 Surveying Surveying Plan At least 21 days before beginning onsite work.
01 33 00 - 8
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Responsible code
Sets to be sent: **
CO COR
01 71 20-2 Surveying Resumes At least 21 days before beginning onsite work.
COR 0 1 paper + 1 electronic
01 71 20-3 Surveying Accuracy Check Results
At least 21 days before beginning onsite work.
COR 0 1 paper + 1 electronic
01 71 20-4 Surveying Completed and Reduced Survey Notes
At least 7 days before final payment invoice submittal.
COR 0 1 paper + 1 electronic
01 71 20-5 Surveying Workday’s Survey Notes
As requested by the Government.
COR 0 1 paper + 1 electronic
01 74 00-1 Cleaning and Waste Management
Waste Production And Disposal Plan
Within 7 days of waste disposal
COR 0 1 paper + 1 electronic
01 74 00-2 Cleaning and Waste Management
Waste Production And Disposal Records
Within 7 days of waste disposal
COR 0 1 paper + 1 electronic
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume (if required)
At least 21 days before beginning environmental assessment.
COR 0 1 paper + 1 electronic
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment (if required)
Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
01 78 30-1 Project Record Documents
Final As-Built Drawings
At least 14 days before final payment invoice submittal.
COR 0 1 paper + 1 electronic
Division 02 – Existing Conditions 02 83 33-1 Removal and
Disposal of Equipment with Coatings Containing Regulated Metals
Documentation At least 21 days before beginning onsite work.
COR 0 1 paper + 1 electronic
02 83 33-2 Removal and Disposal of Equipment with Coatings Containing Regulated Metals
Plans At least 21 days before beginning onsite work.
COR 0 1 paper + 1 electronic
02 83 33-3 Removal and Disposal of Equipment with Coatings Containing Regulated Metals
Certificate of Disposal
At least 21 days before beginning onsite work.
COR 0 1 paper + 1 electronic
Division 03 – Concrete 03 47 20-1 Structural
Prefabricated Concrete Building
Shop Drawings At least 28 days before beginning onsite work.
01 33 00 - 9
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Responsible code
Sets to be sent: **
CO COR
03 47 20-2 Structural Prefabricated Concrete Building
Product Data At least 21 days before material procurement.
COR 0 1 paper + 1 electronic
03 47 20-3 Structural Prefabricated Concrete Building
Manufacturer’s Installation Instructions
At least 28 days before beginning onsite work.
COR 0 1 paper + 1 electronic
03 47 20-4 Structural Prefabricated Concrete Building
Manufacturer’s Certification
At least 28 days before beginning onsite work.
COR 0 1 paper + 1 electronic
03 47 20-5 Structural Prefabricated Concrete Building
Qualifications At least 28 days before beginning onsite work.
COR 0 1 paper + 1 electronic
03 47 20-6 Structural Prefabricated Concrete Building
Notification of Pre- Installation Meeting
At least 10 days before planned meeting.
COR 0 1 paper + 1 electronic
03 47 20-7 Structural Prefabricated Concrete Building
Samples At least 28 days before beginning onsite work.
COR 0 1 paper + 1 electronic
03 47 20-8 Structural Prefabricated Concrete Building
Maintenance Manuals
At least 28 days before beginning onsite work.
COR 0 1 paper + 1 electronic
03 47 20-9 Structural Prefabricated Concrete Building
Warranties Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
Division 26 – Electrical 26 05 10-1 Conductors and
Cables Approval Data At least 14 days before material procurement.
COR 0 1 paper + 1 electronic
26 05 10-2 Conductors and Cables
Test Reports Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
26 05 20-1 Grounding and Bonding
As-Built Drawings Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
26 05 20-2 Grounding and Bonding
Test Reports Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
26 05 33-1 Electrical Conduit As-Built Drawings Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
26 05 90-1 Wiring Checkout and Tests
Test Notification Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
26 24 24-1 Distribution Panelboards
Approval Data At least 14 days before material procurement.
COR 0 1 paper + 1 electronic
26 24 24-2 Distribution Panelboards
Factory Test Report At least 14 days before material procurement.
COR 0 1 paper + 1 electronic
26 24 24-3 Distribution Panelboards
Operation and Maintenance Instruction Books
At least 14 days before material procurement.
01 33 00 - 10
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Responsible code
Sets to be sent: **
CO COR
26 32 10-1 Engine-Generator Set Approval Drawings and Data
At least 14 days before material procurement.
COR 0 1 paper + 1 electronic
26 32 10-2 Engine-Generator Set Final Drawings and Data
Within 14 days of completion of work.
COR 0 1 paper + 1 electronic
26 51 10-1…