Sol_140R4024Q0064_Amd_0003.pdf
PDF 140 KB Posted
- Attached to
- SLV-CB SHOP FLOOR AND APRON REPAIR
- Solicitation number
- 140R4024Q0064
About this file
This document is Amendment 0003 to Solicitation 140R4024Q0064 for the SLV-CB Shop Floor and Apron Repair contract opportunity issued by the Department of the Interior Bureau of Reclamation.
The amendment provides notes from two site visits held on September 30 - October 2, 2024 and October 16, 2024, which clarify details about the concrete walkway, shop floor concrete mix design, and electrical service. It also corrects the proposal due date from Thursday to Wednesday, October 30, 2024 by 4:00 p.m. MDT. The period of performance is December 1, 2024 to March 1, 2025. Interested offerors are encouraged to review the solicitation closely as it has been updated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Revised_SOW_Notated_0002.docx | DOCX document | |
| Attachment_5_-_Amendment_0002_Qs_As_0002.docx | DOCX document | |
| Sol_140R4024Q0064_Amd_0002.pdf | ||
| Attachment_6_-_Additional_Site_Visit_Details_0002.docx | DOCX document | |
| Attachment_4_-_SF_25A_-_Payment_Bond_0001.pdf | ||
| Sol_140R4024Q0064_Amd_0001.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Sol_140R4024Q0064.pdf | ||
| Attachment_3_-_WD_CO20240001_9_13_2024.pdf | ||
| Attachment_2_-_Pricing_Schedule.pdf | ||
| Attachment_2_-_Pricing_Schedule_fillable.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R4024Q0064 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Albuquerque NM 87102
R4Q
555 Broadway Blvd NE, Suite 100 Albuquerque Area Office Upper Colorado Region Bureau of Reclamation
Salt Lake City UT 84138
R40
125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation
10/23/20240003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/24/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 0003 is to:
1. Provide Notes from Site Visits held 9/25/2024 - 10/2/2024 and 10/16/2024. (See continuation page for notes)
2. Correct the due date for proposals from Thursday to Wednesday, October 30, 2024, by 4:00 p.m. MDT. Complete proposals shall be emailed to rlucero@usbr.gov
Period of Performance: 12/01/2024 to 03/01/2025
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Mary B. Maestas
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140R4024Q0064 - SLV CB Shop Floor and Apron Repair Amendment 0003
Site Visit Notes
9/30/2024 - 10/2/2024
The section of concrete walkway between shop and building may be increased near the door to prevent water from pooling on joint between asphalt and concrete from the overhang.
Concrete mix design was discussed for shop. (clarified in revised SOW per Amendment 2). The northern section of slab near the shop bathroom may be left intact if there is not a safety hazard.
Electrical outlets along North fence are not currently active. Primary electrical coming into the shop near the wash bay will need to be located.
Interested offerors are encouraged to review the solicitation closely.
Thickness requirement has been updated to 8" for shop and wash bay.
10/16/2024
Additional measurements were taken by interested offerors.
The grade drainage was discussed generally with focus aligning with the revised SOW for requirements next to the building for the new pad replacing the wash bay and the walkway. Grade for sidewalks could be included in the proposals but not required.
New information since initial site visits is that our electricians traced the electric service point on the SE corner of the shop that runs under the wash bay and discovered it is not an active line.
File details come from the government source that posted it. Updated .