This document contains Questions and Answers related to Amendment 1 for a federal contract opportunity. The key details are:
The contract was previously awarded for a 5-year period from 2019 to 2024 with a total value of $34,200. The last option year was not exercised due to a change in the contractor's status.
The contract requires the provision and servicing of 5 portable toilets (porta-potties). Services include setting up, supplying, cleaning, and pumping/removing waste from each toilet on a monthly basis. The contractor will need to provide an estimate for any relocation costs for the portable toilets.
The contract is for the Department of the Interior Bureau of Reclamation. The portable toilets must be in place at the start of the performance period and remain throughout the 5-year duration, unless replacement or maintenance is required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers- Amendment 1 Question 1: Is there an incumbent? If so, how is it and what is the yearly contract amount?
Answer 1: The last award for this need was awarded for a period of performance from 2019 through 2024. POP was Base +4 years for total amount of $34,200. The last option year was not exercised due to change in status of the contractor.
Question 2: What specific type of portable toilets are needed? Porta Potty? Private restroom with urinal, toilet, and sink?
Answer 2: Portable Toilets (Porta Potty)
Question 3: Will this solicitation require servicing? If so, how often for each portable toilet?
Answer 3: Yes, per the PWS, each toilet shall be serviced once each month. 2. Services include setting and staking, all supplies, chemicals, paper products, cleaning and sanitizing products and pumping services for each of the 5 toilets.
Question 4: Will this solicitation require removal of solid and or liquid waste removal?
Answer 4: Yes, per the PWS, pumping services and removal of solid and liquid waste is required as part of the monthly service for each of the 5 toilets.
Question 5: Can we get a timeframe when units are needing delivered and how long they'll be on site? Will they stay on site for the entire duration of 5 years?
Answer 5: Units should be stationed once performance period starts and will be required to be in the field throughout the performance period unless replacement/maintenance is required.
Question 6: Do you also want us to include the relocation fee done monthly (for the floater units)?
Answer 6: Yes, an idea of relocation costs is needed.