Questions_and_Answers_as_of_8-18-2021_4.docx
DOCX document 21 KB Posted
- Attached to
- RG EBHD REHAB WATER TANK INSPECTION
- Solicitation number
- 140R4021Q0071
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Site_Visit_Info_as_of_8-12-2021_3.pdf | ||
| Questions_and_Answers_as_of_8-5-2021_2.docx | DOCX document | |
| 140R4021Q0071_-_Combined_Synopsis_Sol_-_EBHD_Rehab_Water_Tank_Insp_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R4021Q0071 – EBHD Rehab – Water Tank Inspections
Combined Synopsis/Solicitation Questions and Answers as of 8/18/2021
1. Please describe road access to the tanks. Will roads be improved for semi-truck access?
ANSWER: Roads will not be improved before inspection.
2. When was the last time water was sampled in both the steel tanks and concrete tank?
ANSWER: The week of 8/9/2021.
3. When was the last time a person was inside both the steel and concrete tanks?
ANSWER: Reclamation has no institutional knowledge of entry into the tanks.
4. Please verify there is an interior ladder for each tank.
ANSWER: There are ladders; however, the condition of the ladders is unknown.
5. Roof hatch is stated as 16”, we would require a 24” access, what is the proposed method of 24” access?
ANSWER: This is up to the contractor to propose.
6. In the specifications, it states to clean the floor and first ring of steel tanks, if necessary, what is the proposed method to access this and method to remove sediment?
ANSWER: Contractor shall propose the method.
7. Is inspection company required to chlorinate after inspections?
ANSWER: Reclamation staff will perform chlorination/disinfection.
8. Is owner performing water sampling? Bac-t?
ANSWER: The System Operator will perform sampling.
9. The concrete perch size is listed as 3.5x4.5, it that safe to stand on?
ANSWER: Contractor will evaluate ability to stand on perch.
10. Do we have the option for inspection that the concrete tank will be drained or will it remain full?
ANSWER: The concrete tank can be emptied for inspection.
11. For the concrete tank, will the inspection of the fiberglass liner on the inside be a part of the inspection or just the outside of the concrete tank?
ANSWER: Inspection of the inside and the outside is required.
12. Is there 360 deg access around the concrete tank for a JLG to have access?