This document is a Performance Work Statement (PWS) for a federal contract opportunity issued by the Department of the Interior Bureau of Reclamation, Lower Colorado Basin (BOR-LCB). The key details are:

The BOR-LCB requires a contractor to perform cleanup and disposal of illegal dumpsites; bloodborne pathogen cleanup; compelling and urgent emergency spill response and cleanup; non-emergency spill response and cleanup; and, if needed, remedial investigation and feasibility study (RI/FS) activities associated with HAZMAT response and cleanup. The contractor must also provide hazardous waste, non-hazardous waste, and universal waste disposal services including lab packing, pickup, transportation, disposal, labeling, and documentation. The North American Industry Classification System (NAICS) Codes are 562910 - Remediation Services and potentially 562211 - Hazardous Waste Treatment and Disposal. The government is considering a single contract or two separate contracts, and a multiple-award IDIQ, fixed-price, or time-and-materials contract type. Capability statements with additional details are due by November 22, 2024. A formal solicitation will be posted to SAM.gov after this sources sought process.

View the file

Other files

File Type Posted
Attachment_4_Seed_Task_Order_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 PWS 140R3024R0035

Department of the Interior Bureau of Reclamation Lower Colorado Basin

Performance Work Statement HAZMAT Spill Response/Cleanup and Waste Disposal Services

1.0 GENERAL

The Bureau of Reclamation (BOR) – Lower Colorado Basin (BOR-LCB) requires a contractor to perform cleanup and disposal of illegal dumpsites; bloodborne pathogen cleanup; compelling and urgent emergency spill response and cleanup;

nonemergency spill response and cleanup; and, if needed, remedial investigation and feasibility study (RI/FS) activities associated with HAZMAT response and cleanup activities for the BOR-LCB to include the following area offices: Phoenix Area Office, Lower Colorado Dams Office, Yuma Area Office, and the Lower Colorado Regional Office.

BOR-LCB, the Lower Colorado Dams Office (LCDO)—which includes Hoover, Davis, and Parker Dams—and the Boulder Canyon Operations Office (BCOO), also requires a contractor to provide Resource Conservation and Recovery Act (RCRA) hazardous waste, nonhazardous waste, and universal waste (waste) disposal services. Waste disposal services shall include lab packing, pickup, and transportation; disposal, labeling, and marking of containers; preparing waste profile analyses;

preparing Land Disposal Restriction documentation; preparing Bill of Laden or Uniformed Hazardous Waste Manifests; and providing Certificate of Disposal or Recycling and other documentation related to waste disposal services.

2.0 OBJECTIVE

The objectives of this requirement are the following:

• For one or more contractors to provide BOR-LCB with response capabilities to environmental releases or the threat of a release and/or discharge. “Release incidents” refers to releases or potential releases of hazardous substances, hazardous materials, pollutants, or contaminants that present an imminent and substantial threat to the public health, welfare, the environment, and BOR-LCB mission. The release or potential release also applies to discharges of petroleum products that impacts—or threatens to impact—inland waters or shorelines. Such response actions may require compelling and urgent emergency spill response and cleanup, nonemergency spill response and cleanup, and if needed RI/FS activities to protect BOR-LCB mission of water delivery and power generation.

• For one or more contractors to provide a means to respond to and cleanup illegal dumping/dump sites, to include preventative measures such as construction of berms, installation of fencing and gates, or other methods necessary to deter future dumping.

• For one or more contractors to provide BOR-LCB, LCDO, and BCOO with waste disposal services.

3.0 BACKGROUND

BOR-LCB is one of five BOR Regions in 17 Western states working to implement BOR’s mission to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public.

The Lower Colorado River is a major interstate and international riverine resource, and in a typical year the BOR-LCB delivers 7.5 million acre-feet (MAF) of water to users in Arizona, California, and Nevada, and 1.5 MAF to Mexico. This water typically irrigates over 2.5 million acres of land and meets the domestic needs of roughly 30 million people.

More than 10 million people recreate on the reservoirs and lakes on the Lower Colorado River, including Lake Mead, Lake Mojave, Lake Havasu, and the Imperial Reservoir. These lakes are estimated to hold 63 million acre-feet of water, and the dams that contain them produce an estimated 4.2 billion kWh annually and contribute to flood control.

3.1 HAZMAT Spill Response/Cleanup

The BOR-LCB has the following offices that at any time may use this contract vehicle to address environmental releases or the threat of a release and/or discharge:

• Lower Colorado Dams Office (Hoover Dam, Davis Dam, and Parker Dam)

• Phoenix Area Office

• Yuma Area Office

• Lower Colorado Regional Office (LCRO)

Over the past 15 years, there has been approximately one spill per year occurring within the Lower Colorado River and other water bodies and facilities that required compelling and urgent emergency spill response and cleanup. These spills include fuel tankers turning over on bridges, marina fueling facilities leaking fuel, irrigation fuel tanks leaking into the river, boat accidents that cause a sheen, and HAZMAT tankers carrying chemicals turning over. Any hazardous material or chemicals that travels by truck, car, boat, or train could be spilled at any time and any place in the LCB region.

In the past 9 years, several illegal dump sites/landfills have been identified on BOR lands; over $600,000 has been spent on the cleanup of these sites. These sites include hazardous waste, non-hazardous waste, household waste, construction debris, and other regulated wastes (tires, ACM, state regulated waste, etc.) Numerous other sites have been identified with smaller amounts of waste.

LC REGION & AREA OFFICE JURISDICTIONAL BOUNDERIES

3.1.1 Environmental Protection Agency Region 9 Lower Colorado River Geographic Response Plan The Lower Colorado River Geographic Response Plan (LCR-GRP) is the principal guide for emergency preparedness and response along the Lower Colorado River from Lake Meads and Hoover Dam to the United States/Mexico Border. This plan is consistent with the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) 40 CFR § 300:

https://www.ecfr.gov/cgi-bin/text-idx?SID=bdaac45ce8815a054dcbb95ff75d9b20&mc=true&node=pt40.30.300&rgn=div5 and is intended to facilitate multiagency and multijurisdictional coordination, communication, and collaboration among local, state, and federal agencies; tribal nations; and industry when responding to oil and hazardous material incidents.

The first Colorado River Area Contingency Plan (ACP) was completed in 1993 and amended in 1997 by the addition of ten designated spill boom deployment site strategies to contain and recover contaminants. A Steering Committee was formed in 2009 to update the 1993 ACP. The Steering Committee than formed an Area Committee comprised of local, state, federal, tribal, industry, and nongovernmental organization (NGO) representatives. The Steering Committee decide that one ACP would be inefficient and developed three ACP planning/response Areas. These three Geographic Response Planning Areas include the following:

1. Area One – Hoover Dam to Davis Dam

2. Area Two – Davis Dam to Parker Dam

3. Area Three – Parker Dam to the United States/Mexico Border

The LCR-GRP can be found at the following website: https://response.epa.gov/site/doc_list.aspx?site_id=5618

3.2 Disposal Service of Hazardous Waste, Nonhazardous Waste, and Universal Waste

In a typical year, the LCRO generally may have 1 to 3 pickups of waste per year. Some of these pickups would include lab-packing small quantities of laboratory chemicals, building and grounds maintenance waste, and any additional waste generated by BOR-LCB.

Hoover Dam generally may have 1 to 3 pickups of maintenance waste, universal waste, some chemicals, lead shot from the Hoover Dam Shooting Range, and other hazardous waste as it is generated.

Davis Dam generally may have 1 to 3 pickups per year of maintenance waste, universal waste, some chemicals, and other hazardous waste as it is generated.

Parker Dam generally may have 1 to 3 pickups per year of maintenance waste, universal waste, some chemicals, and other hazardous waste as it is generated.

Boulder Canyon Operations Office (BCOO) generally may have 1 to 3 pickups per year of maintenance waste, universal waste, some chemicals, and other hazardous waste as it is generated.

LCRO and Hoover, Davis, and Parker Dams have Environmental Protection Agency (EPA) Identification number(s).

4.0 SCOPE OF SERVICES

4.1 HAZMAT Spill Response/Cleanup

In general, the contractor shall perform cleanup and disposal of illegal dump sites, bloodborne pathogens, compelling and urgent emergency spill response and cleanup, nonemergency spill response, and cleanup and remedial investigation (RI) and feasibility study (FS) activities in accordance with current Federal, State, Local, and Tribal requirements, and procedures at the direction of the Contracting Officer (CO) and the Contracting Officer’s Representative (COR). The COR will coordinate with the CO to issue task orders against this contract.

The COR for each task order will be the BOR-LCB Incident Commander/Federal On-Scene Coordinator. Besides BOR-LCB, the contractor will also be working with other Federal, State, Local, and Tribal regulatory agencies to meet the required compelling and noncompelling emergency spill response, illegal dump site cleanup, and RI/FS requirements to protect human health, the environment, and tribal and local concerns.

The COR will notify the CO and the CO will issue a task order to contractor(s) of the location of the incident and any additional information regarding the illegal dumpsite, compelling and urgent emergency spill response and cleanup, non-compelling spill response and cleanup, RI/FS situations. Notification will be made in writing.

https://www.ecfr.gov/cgi-bin/text-idx?SID=bdaac45ce8815a054dcbb95ff75d9b20&mc=true&node=pt40.30.300&rgn=div5 https://response.epa.gov/site/doc_list.aspx?site_id=5618

Requirements / Task Contractor shall provide all labor, equipment, monitoring instruments, materials, and services needed to perform illegal dumpsite cleanup, compelling and urgent emergency spill response and cleanup, nonemergency spill response and cleanup, and RI activities.

4.2 Disposal Service of Hazardous Waste, Nonhazardous Waste, and Universal Waste In general, the contractor shall provide all waste services required for the packaging, marking, labeling, documentation, transportation, treatment, and disposal of waste in accordance with all Federal, State, and Local, laws and regulations. These services shall include all necessary personnel, labor, transportation, packaging, equipment, supplies, and documentation.

5 REQUIRED TASKS

5.1 HAZMAT Spill Response/Cleanup

5.1.1 Medical Monitoring

Contractor(s) shall ensure that all employees are on a HAZMAT medical monitoring program.

5.1.2 Training

Contractor shall ensure that all employees have received the appropriate Federal or State HAZMAT training and that all mandatory training is maintained throughout the life of this contract. Contractor shall provide the CO and COR a copy of all training certificates.

5.1.3 Equipment and Instruments

For each response/task order, the contractor shall provide a list of all equipment and instruments that might be used during spill response and remedial investigation activities. Contractor shall certify that all employees using equipment or monitoring instruments have received the appropriate training to operate the equipment or monitoring instruments. If a license is needed to operate equipment or instruments, then the contractor shall provide copies of the equipment operator license and/or monitoring instrument training certificates to the CO and COR for each task order.

Contractor shall coordinate with the COR on the usage of all equipment and instruments. Contractor shall track and log all equipment and instrument used during all spill response activities. Contractor shall inform the COR of all monitoring instrument readings. At the end of each operational period, the contractor shall provide the COR with all equipment and monitoring instruments used and the readings from those instruments the time the reading was taken and who was the operator of the equipment. Contractor shall maintain this information and place it in the final report.

5.1.4 Monitoring Instrument Calibration and Logs

Contractor shall ensure that all monitoring instruments are calibrated. Contractor shall maintain a calibration log for all monitoring instruments. All calibration logs must be available on site with the monitoring instrument and available on request by the COR.

5.1.5 Emergency Response Immediate

In the event of a compelling and urgent emergency HAZMAT response and cleanup activities, the contractor shall be required to respond with a project manager or backup project manager on-site within four (4) hours and response personnel with all equipment/instruments/supplies and services needed on-site within six (6) hours from the time of initial notification and location of the incident. Contractor shall be required to meet this response time on a 24-hour, 7-days-a-week basis. Response time shall begin upon notification to the contractor project manager or backup project manager. The scope of the contractor initial response shall be discussed with and approved by the CO or COR prior to the contractor’s mobilization, preferably at the time of notification.

For actions performed under a time-and-materials CLIN, within four (4) hours of the contractor’s initial response, the contractor’s project manager or backup project manager shall coordinate and supply the CO with a detailed written plan of action and cost estimate. The contractor shall use all Incident Command System (ICS) Forms (the only exception is to use Coast Guard ICS-208-CG instead of ICS form 208 for the site safety plan) and maintain daily logs documenting personnel activities, equipment and instruments usage, and all supply and services used for the task orders. Completed logs and daily reports shall be provided to the COR at the end of each operational period. This documentation shall also be in the contractor’s final report to the COR within 15 days of the completed task. ICS Forms can be found at the following Federal Emergency Management Agency website: https://training.fema.gov/icsresource/icsforms.aspx https://training.fema.gov/icsresource/icsforms.aspx

For actions performed under a letter contract, the definitization schedule will be included in the letter contract.

If the incident takes longer than 12 hours, then the contractor shall develop operating periods lasting 12 hours until all response activities have been completed and the COR has coordinated with other agencies that no additional response actions need to be taken. There shall be a meeting with the COR and the contractor’s project manager or back up project manager, between the operating periods to provide coordination to the oncoming project manager or back up project manager and crew.

5.1.5.1 Work Zones

To reduce the accidental spread of hazardous materials and chemicals by workers from the contaminated area to the clean area, contractor shall develop zones to delineate on the site where different types of operations will occur, and the flow of personnel among the zones should be controlled. The establishment of work zones will help ensure that personnel are properly protected against the hazards present where they are working; work activities and contamination are confined to the appropriate areas;

and personnel can be located and evacuated in an emergency. COR will approve all work zones.

5.1.6 Non-Emergency Response

Non-compelling HAZMAT response and cleanup activities situations that do not require immediate mobilization of contractor resources, the contractor’s project manager or backup project manager shall coordinate with the COR after issuance of a statement of work by the CO to develop a detailed plan of action and cost estimate. Work shall begin after the task order is issued and coordination is made between the CO, COR, and the contractor’s project manager or backup project manager. Once response activities begin, contractor’s services shall be available 24 hours, 7 days a week if needed based on necessary response activities for the incident.

The contractor’s initial response time shall be coordinated with the COR. Contractor shall use all ICS Forms (the only exception is to use Coast Guard ICS-208-CG instead of ICS form 208 for the site safety plan) and maintain daily logs documenting personnel activities, equipment and instruments, usage, and all supply and services used for the project. Completed logs and daily reports shall be provided to the COR. This documentation shall also be in the contractor’s and subcontractor’s final report to the COR within 15 days of the completed task. ICS Forms can be found at the following Federal Emergency Management Agency website:

https://training.fema.gov/icsresource/icsforms.aspx

If the incident takes longer than 12 hours, then the contractor shall develop operating periods lasting 12 hours long until all response activities have been completed and the COR has confirmed that the site needs no further actions taken. There shall be a meeting with the COR and the contractor’s project manager or backup project manager, between the operating periods to provide coordination to the oncoming project manager or backup project manager and crew.

5.1.6.1 Work Zones

To reduce the accidental spread of hazardous materials and chemicals by workers from the contaminated area to the clean area, contractor shall develop zones to delineate on the site where different types of operations will occur, and the flow of personnel among the zones should be controlled. The establishment of work zones will help ensure that personnel are properly protected against the hazards present where they are working; work activities and contamination are confined to the appropriate areas;

and personnel can be located and evacuated in an emergency. COR shall approve all work zones.

5.1.7 Illegal Dumpsites

For illegal dumpsite response and cleanup activities that do not require immediate mobilization of contractor resources, the contractor’s project manager or back up project manager after receiving a statement of work from the CO shall coordinate with the COR and develop a detailed written plan of action and cost estimate. Response time shall begin after receiving the task order from the CO and coordination is made between the COR and the contractor’s project manager or backup project manager.

Contractor services shall be available 24-hours, 7-days a week if needed based on necessary response activities for the incident.

Contractor shall maintain daily logs documenting personnel activities, equipment and instruments, usage, and all supply and services used for the project. Completed logs and daily reports shall be provided to the COR. This documentation shall also be in the contractor’s final report to the COR within 15 days of the completed task.

If the illegal dumpsite takes longer than 12 hours to remove and cleanup, then the contractor shall develop operating periods lasting 12 hours long until the cleanup has been completed and the COR confirms that the site needs to have no further actions taken. There shall be a meeting with the COR, the contractor’s project manager or backup project manager between the operating periods to provide coordination to the oncoming project manager or backup project manager and crew.

5.1.7.1 Work Zones

To reduce the accidental spread of hazardous materials and chemicals by workers from the contaminated area to the clean area, contractor shall develop zones to delineate on the site where different types of operations will occur, and the flow of personnel among the zones should be controlled. The establishment of work zones will help ensure that personnel are properly protected against the hazards present where they are working; work activities and contamination are confined to the appropriate areas;

and personnel can be located and evacuated in an emergency. COR shall approve all work zones.

5.1.8 Once the initial spill cleanup and other time critical and sensitive cleanup activities are complete, a RI/FS into the remaining contamination from the spill may be needed to determine the remaining source(s), degree and extent of contamination, evaluate risk to sensitive receptors and cleanup alternatives and help in developing remedial alternatives for cleanup. Contractor shall be capable of or have subcontractor(s) available to perform RI/FS activities. RI/FS response time shall begin after the CO issues a task order and coordination is made between the CO, COR, and the contractor’s project manager or backup project manager. Contractor services shall be available 24-hours, 7-days a week if needed based on necessary response activities for an incident.

The performance of the RI/FS shall follow the NCP, EPA, State, and, if needed, Tribal requirements. RI/FS activities at a minimum shall include the development of an administrative record. The final remediation processes and activities shall achieve all Federal, State, Tribal, or Local applicable or relevant and appropriate requirements. The RI/FS shall be conducted simultaneously as integrated, phased studies leading to the selection of a remedy. The RI/FS work plan if needed shall be submitted to and approved by the COR and any other Federal, State, Local, or Tribal authorities prior to the start of additional work at the incident scene.

5.1.8.1 RI

The RI shall include, but is not limited to, data gathering (monitoring and testing), and developing methodologies, procedures, and assessments for characterizing the physical and chemical attributes of a site.

5.1.8.2 FS

The FS includes, but is not limited to, conceptualizations, engineering analyses, cost analyses, and an analysis of time frames for the achievement of cleanup goals.

5.1.8.3 Oil Spill Response Organization

The contractor shall provide the CO and COR a list of certified Oil Spill Response Organizations (OSRO) to respond to BOR- LCB facilities that have a spill prevention control and countermeasure (SPCC) plan, or if the COR receives a call from a regulatory agency that the COR needs to provide oil spill response support anywhere within BOR-LCB.

5.2 Disposal Service of Hazardous Waste, Nonhazardous Waste, and Universal Waste

5.2.1 The contractor shall provide all labor, equipment, materials, and services needed to perform waste services in accordance with Federal, State, and Local laws and regulations.

5.2.2 The contractor shall identify a project manager and alternate who will act as a point of contact for LCRO and LCDO with regard to this contract and issuing task orders.

5.2.3 The BOR CO or COR shall notify the contractor’s project manager or alternate that waste disposal services are needed and a task order will be issued by the CO prior to any work being performed.

5.2.4 All documents, applications, and correspondence concerning waste handled under this contract shall be submitted to the COR for review and approval. The COR shall have five (5) working days for reviewing and approval of all documents.

5.2.5 Disposal Methods

If feasible, the disposal method selected for each waste stream shall conform to the following priorities (preference shown highest to lowest) as applicable for the type of waste: (i) reclamation, (ii) incorporation into a fuels burning program, (iii) incineration, (iv)treatment/detoxification/fixation, and (v) land disposal. If requested, the contractor shall provide information on the available disposal options for particular waste materials. Following review of the information provided, the COR will determine the disposal option that the contractor shall use.

5.2.6 Scheduling Waste Services

The contractor shall prepare all waste services documentation and provide it to the COR within five (5) working days of receipt of a written task order. The pickup of waste shall occur two (2) days after all waste services documentation has been reviewed and approved. If shipment cannot be scheduled within the required timeframe, the contractor shall provide the following in writing to the CO and COR: (i) the reason for the delay and (ii) the anticipated date when the shipment will be made. This notification shall be required within 24 hours of finding the conditions causing the delay.

5.2.6.1 The contractor shall coordinate shipment dates and times with the COR. Shipments shall not be scheduled on Saturdays, Sundays, federal holidays, or any other day when the LCRO Date Street Campus or LCDO is closed. Shipments shall be scheduled so that all loading operations can be completed before 3:00 p.m. on the day that the shipment occurs.

5.2.7 Medical Monitoring

The contractor shall ensure that all personnel are on a HAZMAT medical monitoring program.

5.2.8 Training

Contractor shall ensure that all employees have received the appropriate Federal and State HAZMAT training and that the COR has a copy of all training certificates.

5.2.9 Spill Responsibility

5.2.9.1 Contractor is solely responsible for any and all spills or leaks and subsequent cleanups that may be required during the performance of this contract that occur as a result of or are contributed to by the actions of the contractor’s employees or subcontractors. The contractor agrees to clean up such spills or leaks to the satisfaction of the CO and COR and in a manner that complies with applicable Federal, State, and Local laws and regulations. The cleanup shall be at no cost to the BOR.

5.2.9.2 Contractor shall report immediately upon discovery of all such spills or leaks, regardless of their quantities, to the appropriate Federal, State, and Local authorities and to the COR. A written follow-up report shall be submitted to the CO and COR no later than 24 hours after the initial telephonic report. The written report shall be in narrative form and as a minimum include the following:

1. Description of the item spilled (including identity, quantity, manifest nunber, etc.).

2. Whether amount spilled is EPA/state reportable, and if so whether it was reported, to whom reported and the reporting number.

3. Exact time and location of spill including a description of the area involved.

4. Containment procedures initiated.

5. Summary of any communications contractor has with the press, public, Federal, State, or Local officials, or any other communication.

6. Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

5.2.10 All transportation documents (e.g., Uniformed Hazardous Waste Manifest) shall have the BOR-LCB 24 Hour spill phone number annotated.

5.2.11 Safety

5.2.11.1 Safety Plan

The contractor shall perform all operations in a prudent, conscientious, safe and professional manner. At a minimum, contractor personnel and equipment shall comply with applicable State, Federal, Local, and BOR laws, safety regulations, and procedures. The contractor shall ensure that employees’ performance is in a safe manner. The contractor shall ensure that all personnel involved in handling and packaging waste are trained for the level of expertise required for the proper performance of the task and, in particular, the areas of chemical incompatibility, general first aid procedures, and spills.

Handling and personnel protective equipment shall be provided by the contractor and must be appropriate and compatible to ensure safe handling of the waste. The contractor agrees that its personnel and equipment are subject to safety inspections by the COR. BOR’s Safety and Health Standards can be found at the following website:

https://www.usbr.gov/ssle/safety/RSHS/rshs.html

5.2.12 Permits

The contractor shall, without additional expense to the BOR, be responsible for obtaining all necessary licenses and permits, in compliance with all applicable Federal, State, and Local laws, codes, and regulations in connection work being performed under this contract. This includes ensuring all wastes are sent to Environmental Protection Agency (EPA) and state licensed, permitted Treatment Storage and Disposal Facility (TSDF).

5.2.13 Onsite Inventory

Contractor shall coordinator with the COR to coordinate the inventory of all waste prior to disposal appointment.

6.0 DELIVERABLES

6.1 HAZMAT Spill Response/Cleanup

The contractor shall provide the following deliverables:

6.1.1 Development of a Site-Specific Health and Safety Plan (HASP)

The most important part of any spill response is the health and safety of responders. Work being performed during a spill response incident and remedial investigation activities shall require Contractor to prepare a site-specific Health and Safety Plan (HASP) which shall comply with the requirements of 29 CFR 1910.120 Hazardous Waste Operations and Emergency Response" (HAZWOPER), National Incident Management System, and BOR Safety and Health Standards. This HASP may be prepared from a generic spill response HASP and shall be approved by the COR. Contractor and all response personnel shall be covered by the HASP. BOR’s Safety and Health Standards can be found at the following website:

https://www.usbr.gov/ssle/safety/RSHS/rshs.html

If contractor does not have a generic health and safety plan, then recommendation shall be given to use the US Coast Guard Site Safety and Health Plan ICS-208-CG. This form shall be used instead of the standard ICS form 208. The Coast Guard ICS-208-CG form can be found at the following link: https://www.uscg.mil/forms/ics/ICS_208_CG.pdf

6.1.2 Personal Protective Equipment (PPE)

Contractor shall provide all PPE required to perform illegal dump sites, compelling and urgent emergency spill response and cleanup, nonemergency spill response and cleanup, and remedial investigation activities. The contractor shall track and log all PPE usage.

6.1.3 Operational Periods Longer Than 12 Hours

a. Documented site surveys to include at a minimum physical features, geological and cultural features, and geophysical surveys.

b. Site plan and location map preparation (including GPS location of the spill location [latitude/longitude, 5-meter accuracy), surface and subsurface features, groundwater level contours, contaminant compound-specific concentration contours, spill location specific geologic maps, land ownership maps.

c. Identify and document of actual and potential sources that are causing additional contamination.

d. Obtaining all necessary Federal, State, and Local permits.

e. Installation and documentation of monitoring wells, piezometers, test pits, or other exploratory techniques for evaluation of the spill site (including direct-push technology).

f. Collection, analysis and document environmental media samples to determine the type, degree, and extent of contamination.

g. Determination and document spill location specific geologic and hydrogeologic characteristics (including collection of core samples, soil characterization tests, vapor pump tests, aquifer pump tests, slug tests, geophysical surveys, fracture trace analysis).

https://www.usbr.gov/ssle/safety/RSHS/rshs.html https://www.usbr.gov/ssle/safety/RSHS/rshs.html https://www.uscg.mil/forms/ics/ICS_208_CG.pdf

h. Determination and document receptors impacted or threatened by contamination (including collection of air, soil, and water samples from receptor locations).

i. Document and determination of ecological, human health and environmental exposure to released contaminants by providing a risk assessment and risk assessment plan.

j. Document all remedial activities.

k. Ability to provide field screening. Examples of field screening techniques that may be required but are not limited to photoionization detector, % O2 – Lower Explosive Limit meters and multi-gas air monitors and any additional field screening and monitoring instruments need to protect human health and the environment.

l. Contractor shall develop in coordination with the COR a sampling and analysis plan (SAP) for sampling media. The SAP must be approved by the COR. Contractor shall have a subcContractor(s) for environmental laboratories services that are federal and state certified. Contractor shall provide the environmental laboratory rates and certifications when developing the sampling analysis plan.

6.1.4 Administrative Record

Contractor shall develop an RI administrative record in accordance with the NCP.

6.1.5 Decontamination Plan

Contractor shall develop a decontamination plan for all personnel, equipment, and instruments used during response activities. The decontamination plan could be a section in the HASP. The decontamination plan must be approved by the

COR.

6.1.6 Environmental Laboratory Services

Contractor shall provide a list of all environmental laboratory services to include EPA and state certifications to the COR.

6.1.7 Mobilization and Demobilization

Contractor and subcontractor project managers shall provide the cost of mobilization and demobilization to the CO and COR when responding to an issuance of a statement of work under this contract.

6.1.8 Draft and Final Reports

The contractor’s project manager shall coordinate and provide the CO and COR with a detailed draft report of all actions taken and cost associated with response activities. The draft report shall be provided to the COR 15 days after all response activities have been completed. The COR will review and provide comments on the draft and final reports. The final report shall be provided to the CO and COR 15 days after the contractor receives comments back from the COR.

6.1.9 Transport and Disposal of Hazardous Waste and Non-Hazardous Waste Contractor shall be expected to make arrangements to dispose of any collected hazardous and non-hazardous waste recovered during response efforts following all Federal, State, and Local regulations. If the contractor plans on subcontracting this task, the contractor shall list the subcontractor(s) it is planning on using to the COR. The contractor or subcontractor cannot sign any waste disposal documents. All waste disposal documentation shall be signed by a Reclamation employee who has had the appropriate training and is authorized to signee all waste documents.

6.1.10 Insurance Requirements

Contractor shall not commence until the contractor has obtained financial insurance, at its own expense. This includes, but is not limited to, Contract Commercial General Liability Insurance, Business Auto Liability Insurance, Professional Liability Insurance, Pollution Liability Insurance, and Workers’ Compensation, and Employers Liability Insurance. A copy of all insurances shall be provided to the CO or COR at the issuance of this contract.

6.1.11 EPA and DOT Identification Numbers

The contractor shall supply EPA identification numbers and Department of Transportation identification numbers to the CO and COR for all transporters of hazardous, non-hazardous, and universal waste, and TSDFs.

6.1.12 Hazardous and Non-Hazardous Waste Determination and Documentation BOR-LCR requires that a Government employee review and signed all uniform hazardous waste manifests, bill of lading, non-hazardous waste manifest, land disposal restriction forms, and waste profile sheets. Contractor shall prepare all uniform hazardous waste manifests, bills of lading, non-hazardous waste manifest, land disposal restriction forms, and waste profile sheets and provide laboratory test results, and any other supporting documentation pertaining to the hazardous and non-hazardous waste determinations to the COR.

6.1.13 Permits

Contractor shall coordinate with the COR when applying for Federal, State, and Local permits associated with all response activities.

6.1.14 Audit Information

Contractor shall supply the COR with all current audit information to include all transportation companies and TSDFs.

6.1.15 TSDF – EPA Identification Numbers, Closure, and Post-Closure Documentation Contractor shall supply the COR with all TSDF EPA Identification Numbers, closure, and post-closure plans.

6.1.16 Reserved.

6.1.17 Other HAZMAT Supplies

Contractor shall track and log all other HAZMAT supplies that may be needed during a HAZMAT response. This list of other HAZMAT supplies used and their costs shall be provided to the COR at the end of each operational period.

6.2 Disposal Service of Hazardous Waste, Nonhazardous Waste, and Universal Waste

The contractor shall provide the following deliverables:

6.2.1 Health and Safety Plan

Contractor shall submit to the CO and COR the health and safety plan with each task order.

6.2.2 Equipment

Contractor shall provide a list of all equipment to include transportation equipment with lift gate capacity. Contractor shall certify that all employees using equipment have received the appropriate training to operate the equipment. If a license is needed to operate equipment, then the contractor shall submit to the CO and COR a copy of the equipment operator license and/or training certificates.

6.2.3 Supplies

Contractor shall furnish all supplies needed for disposal services. At a minimum contractor shall supply all personnel protective equipment, DOT approved containers, packing material, and other supplies as needed for the disposal of waste.

6.2.4 Transportation of Waste

The contractor shall provide the CO and COR with all licenses and permits associated with the transportation of waste.

6.2.5 Insurance Requirements

The contractor shall not commence until the contractor has obtained financial insurance, at its own expense. This includes, but is not limited to, Contract Commercial General Liability Insurance, Business Auto Liability Insurance, Professional Liability Insurance, Pollution Liability Insurance, and Workers’ Compensation, and Employers Liability Insurance. A copy of all insurances shall be provided to the CO or COR at the issuance of this contract.

6.2.6 Transportation EPA and DOT Identification Numbers

The contractor shall supply EPA identification numbers and Department of Transportation identification numbers to the CO and COR for all transporters of waste.

6.2.7 Audit Information

The contractor shall supply the CO and COR with all current audit information to include all transportation companies and TSDFs.

6.2.8 TSDF Permits, EPA Identification Numbers, Compliance Audit Information, Closure, and Post-Closure The contractor shall supply the CO and COR with all TSDF permits, EPA Identification Numbers, compliance audit information, closure, and post-closure plans.

6.2.9 Waste Profile Documentation

Contractor shall prepare and provide the COR with a waste profile for each waste shipped to a TSDF. The COR shall review and signed all waste profiles.

6.2.10 Land Disposal Restrictions Documentation

Contractor shall prepare and provide the COR with a Land Disposal Restriction (LDR) document. The COR shall review and signed all LDRs.

6.2.11 Uniform Hazardous Waste Manifest/Bill of Lading

Contractor shall prepare and provide the COR with a completed Uniform Hazardous Waste Manifest/Bill of Lading to use as documentation for the transport of waste. The COR will review and signed all Uniform Hazardous Waste Manifests/Bills of Lading.

6.2.12 Returned Uniform Hazardous Waste Manifest/Bill of Lading Contractor shall coordinate with the COR to ensure that within 30 calendar days from the signed and dated Uniform Hazardous Waste Manifest/Bill of Lading that a returned copy of all Uniform Hazardous Waste Manifest/Bill of Lading be provided to the COR.

6.2.13 Uniform Hazardous Waste Manifest/Bill of Lading BOR-LCB Emergency Phone Number All Uniform Hazardous Waste Manifests/Bills of Lading shall have the BOR-LCB emergency phone number either printed or handwritten on the document.

6.2.14 Certificate of Disposal or Recycling

Contractor shall coordinate with the TSDFs to ensure that the COR receives all certificate of disposal or recycling within 180 days of the TSDF receiving the waste shipment.

6.2.15 Packaging Marking, Labeling, and Placarding

The contractor shall provide all package, marking, labeling, and placarding all items in such a manner that all applicable Federal, State, and Local regulations are met. Packaging, shipping names, marking, labelling, and placarding shall be in accordance with 49 CFR and 40 CFR. The contractor shall also provide and affix appropriate placards to each vehicle prior to leaving LCRO or LCDO facilities and ensure that all other DOT transporter requirements are met.

6.2.15.1 Lab-Packs

If chemicals must be packaged for proper shipment (lab-packs), the contractor shall perform such packaging to ensure that there are no compatibility issues and furnish all lab-packing services. The COR will provide the contractor with a list of the chemicals, the container size, the number of containers, and safety data sheets associated with every chemical that needs to be lab packed and disposed.

7.0 MEDIA ENQUIRIES AND RELEASES OF INFORMATION

Neither the contractor(s) nor its representatives shall release any sketch, photograph, report, or other material of any nature obtained or prepared under this contract without the specific written approval of the CO. The contractor nor its representative shall not provide independent communications regarding any projects and contract, nor respond to media or general public enquiries. Public, media, and other queries shall be referred to the COR or CO.

8.0 GOVERNMENT-FURNISHED EQUIPMENT

8.1 HAZMAT Spill Response/Cleanup

Contractor shall provide all equipment and will not be using Government-furnished equipment.

8.2 Disposal Service of Hazardous Waste, Nonhazardous Waste, and Universal Waste

8.2.1 The Government shall furnish forklift equipment and a qualified forklift operator to tailgate material/waste onto the transporter’s truck as needed.

8.2.2 Contractor shall provide all other equipment needed for all waste disposal services.

9.0 SECURITY

9.1 Department of Transportation Security Plan

Contractors transporting hazardous materials or waste shall develop and implement a Department of Transportation’s (DOT) Pipeline and Hazardous Materials Safety Administration (PHMSA) security plan according to Subpart I Safety and Security Plans. (49 CFR § 172.800) https://www.ecfr.gov/cgi-bin/text-idx?SID=174a3ea44f83cf1e3b21db32fa8a26d7&mc=true&node=pt49.2.172&rgn=div5#sp49.2.172.i

9.2 Response Site Security Plan

Contractor shall develop a site security plan to protect the public from the site’s hazards, response operations, and prevent vandalism. Site security is especially important during compelling and urgent emergency HAZMAT response and cleanup activities. The site security plan shall be submitted to the COR for review and approval.

9.3 BOR-LCR Facilities

The operation of BOR-LCR facilities requires continuous and effective security measures. Contractor and subcontractor(s) shall be responsible for initiating necessary measures to ensure that its employees comply with all established security rules and regulations. Contractor or subcontractor personnel visiting BOR-LCB facilities shall provide advanced notification to the COR.

A. Security zones shall be setup for all response work on BOR-LCB facilities. It shall be the contractor’s and subcontractor’s responsibility to ensure that appropriate and effective means that all personnel remain in these areas while on BOR-LCB facility jobsites.

B. Restricted Areas. Personnel shall not be permitted to enter established or designated restricted areas unless so authorized by the COR. Such entry shall be in accordance with and subject to the security regulations established for that area. It shall be the contractor’s and subcontractor’s responsibility to ensure appropriate and effective means that its personnel do not enter restricted areas unless authorized.

9.3.1 Visitor Escort

Contractor personnel visiting BOR-LCB facilities will be required to sign in and out for accountability purposes. Contractor personnel visiting shall be escorted by a BOR-LCB employee.

https://www.ecfr.gov/cgi-bin/text-idx?SID=174a3ea44f83cf1e3b21db32fa8a26d7&mc=true&node=pt49.2.172&rgn=div5#sp49.2.172.i https://www.ecfr.gov/cgi-bin/text-idx?SID=174a3ea44f83cf1e3b21db32fa8a26d7&mc=true&node=pt49.2.172&rgn=div5#sp49.2.172.i

10.0 SUBMITTALS

Documents may be submitted in electronic format, unless noted otherwise. Electronic documents shall be in formats compatible with and readable with Microsoft Office applications, Adobe Acrobat, AutoCAD, or Graphic Information System (GIS). Documents provided by the Government in return will be formatted under Microsoft Office, Adobe Acrobat, AutoCAD, or GIS, except when coordinated otherwise with the contractor.

The contractor shall send all submittals to the e-mail addresses listed below:

1) Contracting Officer (CO), TBD

2) Contracting Officer’s Representative (COR), Bureau of Reclamation, Lower Colorado Region, TBD

3) Contracting Officer’s Representative (COR), Bureau of Reclamation, Phoenix Area Office, TBD

4) Contracting Officer’s Representative (COR), Bureau of Reclamation, Yuma Area Office, TBD

11.0 PLACES OF PERFORMANCE

See Section 3 above for more information.

BOR-LCB area of responsibility includes southern Nevada, all of Arizona, southern California and portions of southern Utah and western New Mexico (see map on page 2). The LCB Regional and Area Offices addresses are as follows:

Lower Colorado Basin Regional Office 500 Fir Street Boulder City, NV 89005

Boulder Canyon Operation Office – Blythe Field Office Bureau of Reclamation Blythe Hydrographic Field Office 1054 Hobson Way Blythe, CA 92225

Hoover Dam Central Warehouse US Highway 93 / NV State Route 172 Boulder City, NV 89005

Davis Dam Davis Dam Field Division Bullhead City, AZ 86429-9707

Parker Dam Parker Dam Field Division Highway 95 Parker Dam, CA 92267-0878

Phoenix Area Office 6150 West Thunderbird Road Glendale, AZ 85306

Yuma Area Office 7301 Calle Agua Salada Yuma, AZ 85364

12.1 Lower Colorado River

The Lower Colorado River flows for 320 miles and borders three states (Arizona, Nevada, and California), seven counties (Clark, NV; Mohave, Yuma, and La Paz, AZ; San Bernardino, Riverside, and Imperial, CA), and on international boundary with the country of Mexico. In addition, several Native American nations inhabit the LCR these nations include Colorado River Indian Tribes (CRIT), Chemehuevi Indian Tribe, Hualapai Indian Tribe, Kaibab Band of Paiute, Quechan Indian Tribe, Cocopah Indian Tribe, Yavapai, Moapa Band of Paiutes, and the Fort Mohave Indian Tribe.

12.2 Phoenix Area Office

The Phoenix Area Office is responsible for overseeing the operation and maintenance of the Salt River Project and the Central Arizona Project and maintains an oversight role with the recreational managers of the resulting reservoirs and canal-side recreational facilities on land owned by Reclamation.

Salt River Project https://en.wikipedia.org/wiki/Salt_River_Project Central Arizona Project https://en.wikipedia.org/wiki/Salt_River_Project

12.3 Yuma Area Office

The Yuma Area Office area of responsibility is represented in green and spans the area surrounding 276 river miles south of Davis Dam.

https://en.wikipedia.org/wiki/Salt_River_Project https://en.wikipedia.org/wiki/Salt_River_Project

13.0 PERIOD OF PERFORMANCE

The term of the IDIQ contract will commence on the effective date and will be for 5-year ordering period. Each task order will state its own period of performance and delivery schedule.

140R3024R0035

Appendix A: Performance Requirement Summary, HAZMAT Spill Response and Cleanup

Performance Objective Paragraph No.

Acceptable Quality Level

Method of Surveillance Incentive/Disincentive

Environmental Laboratory Services Contractor(s) shall provide a list of all environmental laboratory services to include EPA and state certifications to the

COR.

6.0.18 100%, No Deviation

CO receives a list of all environmental laboratory services to include EPA and state certifications

Incentive: Positive performance ratings

Disincentive: Negative performance ratings

Training Contractor(s) shall ensure that all employees have received the appropriate Federal or State hazmat training and that all mandatory training is maintained throughout the life of this contract.

Contractor(s) shall provide the CO and COR a copy of all training certificates.

5.1.2 100%, No Deviation

COR will review all training records

Incentive: Positive performance ratings

Disincentive: Negative performance ratings

Equipment and Instruments Contractor(s) shall provide a list of all equipment and instruments that might be used during spill response and remedial investigation activities. Contractor(s) shall certify that all employees using equipment or monitoring instruments have received the appropriate training to operate the equipment or monitoring instruments. If a license is needed to operate equipment or instruments than the Contractor(s) shall provide copies of the equipment operator license and /or monitoring instrument training certificates to the CO and COR.

5.1.3 100%, No

COR reviews all instruments and licenses

Incentive: Positive performance ratings

Disincentive: Negative performance ratings

Monitoring Instrument Calibration and Logs Contractor(s) shall ensure that all monitoring instruments are calibrated.

Contractor(s) shall maintain a calibration log for all monitoring instruments. All calibration log must be available on site with the monitoring instrument and available on request by the COR.

5.1.4 100%, No Deviation

COR review calibration logs.

Incentive: Positive performance ratings

Disincentive: Negative performance ratings

Emergency Response Immediate Contractor(s) shall be required to respond with a project manager or back up project manager on-site within four hours and response personnel with all equipment/instruments/supplies and services needed on-site within six hours from the time of initial notification and location of the incident. Contractor(s) shall be required to meet this response time on a 24-hour, 7-days a week basis. Response time shall begin upon notification to the

5.1.5 100%, No Deviation

COR notifies CO of an immediate emergency response action, COR monitors activities, COR monitors activities

Incentive: Positive performance ratings

Disincentive: Negative performance ratings

Contractor(s) project manager or back up project manager. The scope of the Contractor(s) initial response shall be discussed with and approved by the CO or COR prior to the Contractor(s) mobilization, preferably at the time of notification. The Contractor(s)'s level of effort shall not exceed that in the plan of action and cost estimate and the COR’s task order without receiving prior approval from the CO.

Emergency Response Immediate Within four hours of the Contractor(s) initial response, the Contractor(s) project manager or back up project manager shall…