This document is a Statement of Work (SOW) for the purchase of electrical materials for the 242 Half Wells Project, solicited under Solicitation Number 140R3024Q0020 by the Bureau of Reclamation, Interior Region 8: Lower Colorado Basin, Yuma Area Office.

The SOW provides detailed technical specifications for 40 electrical equipment items required for the project, including breakers, transformers, panels, enclosures, and conductors. The project objective is to produce an additional 25,000 acre-feet of low-salinity water to be conveyed to the Colorado River and delivered to Mexico, thereby conserving like amounts in Lake Mead. The solicitation is being issued unrestricted, and written questions are due by June 21, 2024. Quotes are due by July 15, 2024 at 12:00 PM PD. If the brands and part numbers listed are no longer available, the Bureau of Reclamation's Technical Services Center will evaluate proposed substitute items for compatibility on a case-by-case basis.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Statement of Work

SPECIFICATIONS AND STATEMENT OF WORK

ELECTRICAL MATERIALS FOR HALF WELLS

PROJECT 242 UPGRADE

INTRODUCTION

On December 10, 2014, Reclamation signed a Memorandum of Understanding (MOU) with the Lower Basin states of Arizona, California, and Nevada and the major municipal water agencies in each state (Southern Nevada Water Authority, Central Arizona Water Conservation District and the Metropolitan Water District of Southern California) to implement drought response actions to reduce the risk of reaching critical reservoir elevations in Lake Mead due to the ongoing drought in the Colorado River Basin. Reclamation is working together with these parties to achieve the agreed volume of up to 3 million acre-feet (AF). In addition, Reclamation specifically committed to plan and implement actions to “replace, recover, and reduce” Lower Basin system losses.

The 242 Wellfield Expansion Project was substantially completed in December 2020, the new 242 Half Wells Project (Project) would add an additional three wells east of the current expansion project. The Project is estimated to produce over 25,000 AF of low-salinity water. The product water will be conveyed north to the Colorado River and delivered to Mexico, thereby conserving like amounts in Lake Mead.

PROJECT OBJECTIVE

The objective of this Project is to produce an additional 25,000-acre feet of low-salinity water that will be conveyed north to the Colorado River and delivered to Mexico, thereby conserving like amounts in Lake Mead. The 25,000 AF is in addition to the 25,000 AF that is to be produced by the 242 Wellfield Expansion Project. The three new well design was completed on June 26, 2023, and included the electrical Bill of Materials (BOM). Items listed below are remaining items needed for purchase and was taken from the BOM. In addition to the three new wells, the current 9 wells within the project are being upgraded with 400-HP motors. Included in this BOM are the required electrical materials to support the increase in production.

SPECIFICATIONS

1. Square D 480V Breaker (PJL36080CU33A-SA)

2. Square D Power Block (9080LBC363106)

3. General Electric Fused Switch Breaker (TH3361SSVW)

4. Flex-Core Low Voltage Potential Transformer PT (456-480FF)

5. Ohmite Resistor (D50J75E)

6. Ohmite Resistor (D500J5R0E)

7. Gardner Bender Terminal Block (GTB-408)

8. SEL 751 Relay 11GF1 (751101A2A0X7A851C00)

9. ABB Test Switch (C129A501G01)

10. Square D 120V Circuit Breaker (QOU115)

11. Erico Din Rail (557850)

12. Eaton UPS (KA1013400000010) (Goes with Line 13)

13. Eaton Relay Card (103003055) (Goes with Line 12)

14. Leviton 120V Receptacle (GFWR1)

15. Hubbell 240V Receptacle (HBL9308)

16. Leviton Light Switch (54521)

17. Cree Exterior Lighting (SEC-EDG-2S-WM-06-E-UL-BK-350)

18. Lithonia Lighting Interior Lighting (FEM L48 4000LM LPAFL MD MVOLT GZ10 40K

90CRI)

19. Square D Ground Kits (PK4GTA)

20. Mitsubishi Indoor Unit AC Evaporator (PKA-A24KA7) Outdoor Unit Condensor (PUY-

A24NHA7)

21. Champion R-Series BR5 5HP Single Phase 230V Air Compressors for Tanks

22. Champion R-Series BR7F 7.5HP Single Phase 230V Air Compressors for Tanks

23. 600 MCM (720') Wire for Main Feed

24. 3/0 AWG (240') Wire for Main Feed

25. 350 MCM (780') Wire for Motor Feed

26. 1/0 AWG (260') Wire for Motor Feed

27. Hoffman NEMA 12 Enclosure (48"x36"x16")(A483616LP)

28. Hoffman Subplate (45"x33")(A48P36)

29. Simpson Hawk 3 Digital Controller (H345-2-71-1-0-2)

30. Yokogawa Time Meter, 3W, 120V, 60HZ, Non-Resetable (240-311-AAAB)

31. Seametrics 4-20MA Flow Rate/Total Indicator, 12-24VDC (FT440)

32. Schneider Selector Switch, Harmony 9001K, Metal, Key Switch, 30MM, Key E10, 3

Positions, Stay Put, 2 C/O (9001KS43K10H2)

33. Soft Starter Cabinet SC1 (Class 8639 Type 480UWH4N C06 D07 A10 F10 G10 M10)

a. Rating:

a. 800 amps continuous current rating, minimum.

b. Three phase, 600VAC, 60Hz.

c. 65kA RMS symmetrical short circuit rating, minimum

d. Three phase system with ground bus, no neutral.

b. Soft Starter Compartment

a. Soft Starter

1. Combination Altistart 480 Soft Start (bypass included)

2. 400 type

3. C59 series starter frame

4. Include Remote Terminal device with integrated display, mounting kit and connection cable to connect the Remote Terminal device back to the soft starter.

a. Remote Terminal device display shall display the same information available on the integrated display mounted on the soft starter.

b. Mount Remote Terminal device on the front door of the soft starter compartment.

b. Switches, Push buttons, and Indicating Lights:

1. Provide Hand-Off-Auto Switch for the Soft Starter.

a. Include spare contacts for the ‘Hand’ and ‘Auto’ positions for Customer’s use. Customer will be using these contacts to provide feedback to external control components.

b. Switch shall be accessible from the front of the compartment.

2. Provide the following indicating lights:

a. Green indicating light for motor running.

b. Red indicating light for motor stopped.

3. Provide reset pushbutton.

4. Provide bypass selector switch to selector motor to run on bypass contactor.

c. Provide spare contacts for the Customer’s use for the following components:

1. Spare normally open contact indicating the bypass contactor position.

2. Spare normally open contact indicating the isolation contactor position.

3. Spare contact from the soft starter indicating that the motor is running.

d. Wire all spare contacts to terminal blocks.

e. Utilized for a 400 HP motor.

f. Provide double barrel main lugs and lugs for the soft starter, 600MCM for the main and 500MCM for the starter

34. Distribution Panel, D1A (Eaton PRL4X)

a. Service entrance: No.

b. Rating: 3 phase. 480V, 3 wire, 800A.

c. Main Type: Main Lugs Only

d. Bus Material (Main and Ground): Copper.

e. Enclosure: NEMA 3R.

f. Power Xpert Monitor 3000 meter.

g. Breakers:

a. Circuit Breaker #1 Rating:

1. 20A

2. Three pole 480VAC.

3. 65 kAIC short circuit rating, minimum.

4. Thermal-magnetic trip.

b. Circuit Breaker #2 Rating:

1. 800A

2. Three pole 480VAC.

3. 65 kAIC short circuit rating, minimum.

4. Adjustable Trip, LSI

c. Circuit Breaker #3 Rating:

1. 60A

2. Three pole 480VAC.

3. 65 kAIC short circuit rating, minimum.

4. Thermal-magnetic trip.

d. Circuit Breaker #4 Ratings:

1. 40A

2. Two Pole, 480VAC.

3. 65 kAIC short circuit rating, minimum.

4. Thermal-magnetic trip.

e. Circuit Breaker #5 Ratings:

1. 60A

2. Two Pole, 480VAC.

3. 65 kAIC short circuit rating, minimum.

4. Thermal-magnetic trip.

f. Circuit Breaker #6 Ratings:

1. 60A

2. Two Pole, 480VAC.

3. 65 kAIC short circuit rating, minimum.

4. Thermal-magnetic trip.

35. 480-240/120V Transformer K1A (Eaton T20P11S1516CU)

a. Ratings:

1. Power: 15 kVA

2. Voltage: 480-240/120VAC

3. Dry-type with NEMA 1 enclosure

36. TXFR Wall mount (Bracket kit: WMB05)

37. Distribution Panelboard, P1A (Eaton PRL1X)

a. Service entrance: No.

b. Bus Rating: 1 phase, 240/120V, 3 wire, 100A, minimum.

c. Main Type: Main Circuit Breaker

a. 80A, 2 pole, 22kA

d. Bus Material (Main, Neutral, and Ground): Copper.

e. Enclosure: NEMA 3R.

f. Top and Bottom entry power cable connection to the power panel.

g. Distribution Circuit Breakers:

a. Type NQ bolt on type circuit breakers.

b. (4) 30A, 2 pole, 22kA

c. (8) 20A, 1 pole, 22kA

38. Enclosure (Square D M800DS)

a. Includes shunt trip lug Kit: AL1200P7KU

b. Includes Ground Kit: PK0GTA4

c. Height 40.3 inches

d. Width 20.8 inches

e. Depth 9.5 inches

39. Enclosure Panel A16P16 (nVent/Hoffman (A16H16ALP3PT)

a. Height 16 inches

b. Width 16 inches

c. Depth 6 inches

40. Enclosure Panel A30P30 (nVent/Hoffman A30R3012HCR)

a. Height 30 inches

b. Width 30 inches

c. Depth 12 inches

Conductors will be the following:

1. Rating: 600V

2. Material: ASTM 8 Stranded Copper.

3. Insulation: THWN-2 or XHHW-2.

Part names and numbers are provided for items that have already been verified for compatibility by the Technical Services Center (TSC) of the BOR. If brands listed are not available, then a substitute brand and model # shall be submitted in the quote for technical evaluation by TSC to confirm compatibility with an already designed Motor Control Center (MCC) procured for the project.

SHIPPING AND DELIVERY OF MATERIALS

The supplier shall transport and handle products in accordance with the manufacturer’s instructions.

Inspect shipments prior to shipment to ensure products comply with requirements, quantities are correct, and that they are undamaged.

All items shall be delivered to the Bureau of Reclamation Yuma Area Office.

Deliver address: Yuma Area Office, 7301 Calle Agua Salada, Yuma, AZ 85364.

Warehouse deliveries are Monday thru Thursday 7am to 4pm.

Point of contact for deliveries is Larry Arnold. He can be reached at 928-343-8525 or larnold@usbr.gov.

SUBMITTAL REQUIREMENTS

General – The Contractor shall furnish all materials to the Government, in accordance with this paragraph and the requirements in the provisions, clauses, and paragraphs of this solicitation.

If the brands and part numbers listed are no longer available and cannot be acquired, then proposed replacement or substitute brands or part numbers that are technically equal to, during procurement, would need to be evaluated for compatibility on a case-by-case basis, by the TSC.