This performance work statement outlines requirements for installing a personal identity verification compliant access control system and national defense authorization act compliant video surveillance system at the Bureau of Reclamation's Klamath Basin Area Office in Klamath Falls, Oregon. The contractor shall analyze, replace, upgrade, and provide end user instruction for new security systems hardware and software to ensure all components are functional and working as intended. This includes installing door readers, fiber, cabling, indoor and outdoor sensors, and configuring the access control system. The contractor must also install fiber, cabling, and configure a video recording system with integrated fiber and cameras. The contractor must provide training on operating and maintaining the new systems. All work must be completed by February 28, 2024 at the Klamath Basin Area Office. The related federal contract opportunity is solicitation number 140R2023Q0140 to install the security system and video surveillance equipment for the Bureau of Reclamation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2023Q0140_Amd_0002.pdf | ||
| Sol_140R2023Q0140_Amd_0001.pdf | ||
| Sol_140R2023Q0140.pdf | ||
| DOL_Wage_Determination_2015-5581_Rev_22.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Security System Replacement
September 14, 2023 October 23, 2023
1.0 Objective
The objective of this Performance Work Statement (PWS) is to acquire contractor services to meet a requirement to install and configure a Personal Identity Verification (PIV) Compliant Access Control System and National Defense Authorization Act Compliant Video Surveillance system the Klamath Basin Area Office as identified in this PWS.
2.0 Background
Klamath Basin Area Office is currently undergoing construction for a new mission asset office facility with end-of-life security system components which need replacing/upgraded. This facility requires PIV Compliant Access Control System and National Defense Authorization Act Compliant Video Surveillance systems to meet federal requirements and to connect to Klamath Bason Project A-Canal Headworks, Link River Dam, and soon to be Keno Dam for monitoring and access controls.
3.0 Period of Performance
Work shall be completed by February 28, 2024
4.0 Place of Performance
Bureau of Reclamation Klamath Basin Area Office 6600 Washburn Way Klamath Falls, OR 97603
5.0 Hours of Operations
The contractor is responsible for conducting business, between the hours of 8:00 am to 5:00 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
6.0 Recognized Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth
7.0 Abbreviations
ACS Access Control System COR Contracting Officer’s Representative FIPS Federal Information Processing Standards HSPD-12 Homeland Security Presidential Directive 12 NDA Non-disclosure Agreement NDAA National Defense Authorization Act PIN Personal Identification Number PIV Personal Identity Verification PPE Personal Protective Equipment PWS Performance Work Statement
8.0 Tasks
A. Contractor shall analyze, replace, upgrade, and provide end user instruction for field operation of new design build security systems (hardware and software) and ensure all identified components in this PWS are functional and working to their full manufacturer capabilities. All items replaced during this contract shall be in a new/unused condition and have a full manufacturer warranty. A warranty on repair and installations shall be for no less than one year from project completion.
B. A pre-bid site visit is required to ensure an actual understanding of what is needed per site security personnel. Site visits may be arranged by coordinating with David Kohler- Edwards at 541-810-8874.
C. Software House, American Dynamics and Axis cameras are used in the Klamath Basin Project. All proposed systems must be fully compatible with existing systems.
D. The work includes parts, cable, conduit, and labor to replace and install a fully operational security system at Klamath Area Office. Remove existing end of lifecycle equipment, replace cable, and ensure proper operation.
E. Work shall be performed at Klamath Basin Area Office.
F. Access Control System (ACS) will be Homeland Security Presidential Directive 12
(HSPD-12) and Federal Information Processing Standards (FIPS) compliant.
G. Access control system will not connect to the federal bridge.
H. The access control system will be configured for dual authentication using employee
Person Identity Verification (PIV) badge and Personal Identification Number (PIN).
I. Access control system will be configured for duress pin.
J. Video Recording Systems, Cameras, and Network Switches will be of National Defense
Authorization Act (NDAA) Section 889 compliant.
K. Contractors will be required to sign a Non-disclosure Agreement (NDA) L. Reuse existing serviceable conduit where possible.
M. Install new conduit and junction boxes where needed. A minimum of 3/4” conduit shall be used.
N. Site personnel will provide details if a specified type of conduit is required, i.e., EMT, or rigid. Hard Conduit in the building is not required and cabling and fiber can be routed in intertube that meets NFPA 70E and other national standard codes.
O. Ensure outer and inner main door entrances have ADA push to enter/ exit.
P. J-Hooks and Intertube are sufficient for the ceiling.
Q. Project benchmarks reached for interval payments are desired to be at 30% completion, completion of conduit work, 60% completion, and 90% completion with Reclamation conducting periodic inspections to ensure benchmarks are reached.
R. Reclamation has several new exterior AXIS cameras still in the box (purchased 2022) on hand which could be used for the project to defray some costs if they fit into the vendor’s specific design plan:
a. 1 – AXIS O1378-LE Network Camera BAREBONE
b. 5 – AXIS q6075-e 60Hz PTZ Dome Network Camera
c. 1 – AXIS t91L61 Wall-and-pole Mount
d. 7 – AXIS Q3617-VE Network Camera
S. Detailed “AS BUILT” drawings of the completed project will be provided to Reclamation before the final payment is made.
8.1 Klamath Basin Area Office Access Control System
Installation and configuration of door readers, fiber, cabling, indoor & outdoor sensors, and Access Control System shall be complete and fully operational and integrated into new and existing physical infrastructure.
8.2 Klamath Basin Area Office Contractor Provided Video Surveillance System
Installation and configuration of fiber, cabling, and video recording System shall be complete and fully operational with fiber, cameras, boxes, towers, integrated into new and existing physical infrastructure.
8.3 Training
Contractor shall provide training to Klamath Basin personnel on the proper operation and basic maintenance of the video and security system. Training shall include at a minimum basic configuration and operation of workstation(s) for the video and security systems, adding and removing workstation users, video searching, video retrieval, video export, and operational viewing. Security system training shall include enrolling PIV badges, deactivating PIV badges and standard operations for viewing alarms and generating reports. Training shall be for up to 12 Klamath personnel. Contractor shall provide one set of step-by-step instructions to Klamath personnel for all training items listed.
8.4 Site Conditions
Sufficient parking for up to four standard size vehicles (3/4-ton pickup truck) will be made available at each site location. Restrooms are available on site for contractor use. Contractor is responsible to pre-coordinate with Klamath personnel to ensure contractor meets required safety plan and training standards. Contractor will provide safety plan and safety training documentation to Klamath personnel for all contractor personnel. All site specific Personal Protective Equipment (PPE) shall always be worn. The contractor will follow all Occupational Safety and Health Administration (OSHA), state, and local safety regulations. The government will provide a list of special PPE requirements if needed.
9.0 Quality Assurance Surveillance Plan
The Quality Assurance Surveillance Plan (QASP) is one evaluation method the government uses to surveillance performance to determine whether the Contractor meets the standards of performance as defined in the PWS. The absence of a QASP for any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the government under any other provision of the contract in determining the quality of the Contractor performance.
10.0 Performance Requirements Summary
Performance Requirement Summary
(PRS)
Performance Standard Method of Surveillance
Install PIV Compliant Access Control System
(a) Timeliness: Parts are shipped within one business days of any received orders.
(b) Quality: New or repaired parts are received in working condition.
(c) Responsiveness: Access to support during stated hours of operation.
Periodic surveillance by the Contracting Officer’s Representative (COR) and review of completed work by the
COR.
Install Video Surveillance system
(a) Timeliness: Parts are shipped within one business days of any received orders.
(b) Quality: New or repaired parts are received in working condition.
(c) Responsiveness: Access to support during stated hours of operation.
Periodic surveillance by the COR and review of completed work by the
COR.
11.0 Contract Changes
Additional services required by changes in mission assignments must be documented by a written contract modification. If the contractor receives a request from Reclamation personnel directing or requesting work that the contractor believes is not within the terms of the PWS or the contract, then the contractor must notify the Contracting Officer of the request. The only person that has the authority to modify the terms of the contract or request work for which compensation will be provided is a Contracting Officer.