This document is a detailed site map for material delivery and stockpile at the Kachess Dam in Yakima, Washington, prepared by the Bureau of Reclamation, U.S. Department of the Interior. The map specifies contractor requirements for delivering and stockpiling various materials, including 60 tons of drain rock/filter gravel, 150 tons of clean fill, and 120 tons of 3/4-inch road base. The delivery areas include both east and west quarry spall rock placement zones, with approximate locations for stockpiling materials near the dam's crest, downstream face, and access road. Access routes are restricted, with contractors required to coordinate with the government for entry, specifically noting travel through the dry reservoir bed and no public access to the site. The map also highlights key infrastructure such as the spillway bridge, generator building, and the Kachess Reservoir, with a posted weight limit of 10 tons for the spillway bridge.

View the file

Other files

File Type Posted
Sol_140R1725Q0059_Amd_0002.pdf PDF
Sol_140R1725Q0059_Amd_0001.pdf PDF
Sol_140R1725Q0059.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

-1

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-0 1-

LA

S T

S A V

ED

B Y

M D

EA

M

IC

O

¦D_DT¦

¦STATUS¦

YA

K

IM

A P

R O

JE

C T

K

IT

TI

TA

S D

IV

IS

IO

N

K A C H

ES

S D

A M

K A C H

EE

S D

A M

W

ES

T S

LO

PE

MATERIAL DELIVERY AND

STOCKPILE

YAKIMA, WA

33-109-60030

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL

£TT£

£AT£

£AA£

£TA£

M. DeAmico

M. DeAmico

A. Galayde

GENERATOR BUILDING

EAST QUARRY SPALL ROCK

PLACEMENT AREA

APPROX 270 TONS

STOCKPILE IN THIS VICINITY

CONTRACTOR TO DELIVER AND STOCKPILE:

DRAIN ROCK /FILTER GRAVEL: 60 TONS

CLEAN FILL: 150 TONS

3/4-INCH ROAD BASE: 120 TONS

KACHESS DAM CREST

SPILLWAY BRIDGE

POSTED WEIGHT LIMIT = 10 TONS

WIDTH = 8.75 FT

ACCESS ROAD

ACCESS ROAD:

TO FOREST RD 4818 AND

KACHESS DAM ROAD.

COORDINATE WITH GOVERNMENT

FOR ACCESS (NO PUBLIC ACCESS)

ROAD EDGE

GRAVEL SURFACE, TYPICAL

WEST QUARRY SPALL ROCK PLACEMENT AREA

APPROX 555 TONS

STOCKPILE IN THIS VICINITY

0 50' 100'

KACHESS DAMDOWNSTREAM FACE

KACHESS RESERVOIR:

WATER SURFACE

ELEVATION VARIES

KACH

ESS D

AM

O

U

TLET W

O

RKS

CONTRACTOR APPROX.

ACCESS ROUTE TO WEST

SIDE FOR QUARRY SPALL

DELVERY. TRAVEL

THROUGH DRY RESERVOIR

BED. COORDINATE TIMING

WITH GOVERNMENT.

WEST QUARRY SPALL

DELIVERY AREA ACCESS

EAST QUARRY SPALL