This is a Sources Sought Notice issued by the U.S. Department of the Interior, Bureau of Reclamation for the Grand Coulee Nathaniel 'Nat' Washington Power Plant GSU Transformer Replacements project in Washington. The Bureau is conducting market research to identify interested and capable contractors prior to issuing a formal solicitation. The work involves replacing six single-phase, outdoor, Class II generator step-up (GSU) power transformers with a capacity of 165/220/276 MVA using synthetic ester insulating fluid. Principal components include supplying and installing six new GSU transformers, removing and disposing of three in-service and four spare transformers (including insulation fluid and asbestos wiring disposal), relocating three transformers to spare locations, and modifying existing isolated phase bus for connection to new units. The transformers must meet specific technical requirements including 310.687 kV high side voltage, 15 kV low side voltage, 1675 BIL winding rating, 60 Hertz frequency, and audible sound level compliance with IEEE C57.12.00 standards. The estimated order of magnitude exceeds $150,000,000 with anticipated contract award in FY2026 (subject to change). The estimated contract type is hybrid firm fixed price for construction and supply with an estimated period of performance to be determined.
Responses are due by 5 p.m. Mountain Time on March 12, 2026 and must be submitted to Contracting Officer Colby Clifford (CClifford@usbr.gov) and Contract Specialist Drew McGuire (DMcGuire@usbr.gov). Interested offerors should provide organizational information, statement of interest as prime or subcontractor, transformer manufacturer and country of origin with Buy American Act compliance documentation, estimated manufacturer lead time (using a reference NTP date of October 10, 2027), market volatility assessment with guidance on Economic Price Adjustment terms, construction bonding levels, SBA size status and certifications, firm capability description, and one to three recent similar projects with minimum $8 million contract value completed at least 75 percent within the last ten years. The Government is also seeking technical and commercial input on two alternatives: maintaining synthetic ester insulating fluid specifications (Alternative A) or revising to allow mineral oil (Alternative B), with detailed questions addressing Buy American Act compliance, short circuit testing, manufacturing duration, and pricing impacts for economies of scale at increased quantities. This Sources Sought is for market research purposes only and does not constitute a commitment to award a contract or obligate the Government to make payment for submitted information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF RECLAMATION
1150 North Curtis Road
Boise, ID 83706-1234
C-PN 7200
SOURCES SOUGHT NOTICE
THIS IS NOT A REQUEST FOR QUOTE (RFQ) INVITATION FOR BID (IFB) OR REQUEST FOR
PROPOSAL (RFP)
A. Purpose of Notice: To obtain a source list of interested/capable contractors to aid in market research, establishment of a method of procurement, basis for award, and or other procurement information useful to the Government’s requirement.
This is a Sources Sought announcement only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS, NOR A PROPOSED SYNOPSIS OF A PROPOSED CONTRACT ACTION
UNDER FAR SUBPART 5.2 and no contract shall be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information requests. No solicitation is currently available. Responses to this Sources Sought will shape the acquisition strategy in developing a competitive requirement.
For firms who responded to prior Sources Sought Notices for this requirement and are still interested, please respond to this Sources Sought Notice.
B. Project Title: Grand Coulee Nathaniel ‘Nat’ Washington Power Plant GSU Transformer Replacements
Columbia Basin Project, Washington
C. Work is located at Grand Coulee Nathaniel ‘Nat’ Washington Power Plant adjacent to the City of Grand
Coulee, Washington, approximately 90 miles west of Spokane, Washington, in Okanogan County.
The Bureau of Reclamation (Reclamation) is conducting market research for removing and disposing existing power transformers as well as furnishing and installing replacement power transformers in the
Nathaniel ‘Nat’ Washington Power Plant.
D. Estimated period of performance: TBD, Anticipated Contract award in FY2026 (Subject to Change)
E. Estimated Order of Magnitude: More than $150,000,000.
F. Estimated NAICS: 237130 Power and Communication Line and Related Structures Construction & 335311
Power, Distribution, and Specialty Transformer Manufacturing (NAICS subject to change)
G. Estimated Size Standard: $45.0 Million for 237130 and 800 # of employees for 335311
H. Estimated Contract Type: Hybrid, Firm Fixed Price (FFP) Construction and Supply
I. Estimated Principal Components of work to be performed includes the following:
1. Replace six (6), in-service, single-phase Generator Step-Up (GSU) power transformers. The following work to be completed:
a. Supply (manufacture, factory test, and transport) six (6) Generator Step-Up (GSU) power transformers for in-service operation.
b. Remove and dispose of three (3) GSU power transformers from in-service operation, including high voltage surge arresters.
1) Recycle or dispose of existing insulation fluid per requirements of Section 02 87
20 – Removal and Disposal of Used Oil.
2) Remove and dispose of existing asbestos wiring per requirements of Section 02
82 20 - Removal and Disposal of Asbestos Containing Materials.
c. Remove and dispose of four (4) GSU transformers from spare locations.
1) Recycle or dispose of existing insulation fluid per requirements of Section 02 87
20 – Removal and Disposal of Used Oil.
2) Remove and dispose of existing asbestos wiring per requirements of Section 02
82 20 - Removal and Disposal of Asbestos Containing Materials.
d. Remove and reinstall three (3) GSU transformers from in-service operation and relocate to designated spare locations; prepare transformers for spare status.
e. Install and commission six (6) GSU transformers for in-service operation including high voltage surge arresters and six (6) Dissolved Gas Monitors
(DGMs) attached and functional.
f. Modify existing isolated phase bus for connection to new transformers in Bays 21 and 22.
J. Specifics with respect to the new transformers are as follows:
Type and Class Single-phase, outdoor, Class II generator step-up
Insulating Fluid Synthetic Ester Fluid
Capacity 1 165/220/276 MVA (KNAN/KNAF/KNAF)
Temperature Rise and
Loading Conditions1 Average Winding (°C) Winding Hottest-Spot (°C) Insulating Liquid (°C)
45 60 45
Reactive Power -208 MVAR to +150 MVAR
Reverse Power2 Up to 3.3 MW
(synchronous condenser capable)
Power Frequency 60 Hertz
High Side (kV) Low Side (kV) High Side
Neutral (kV)
Voltage / Connection
310.687 (538.125 phase to phase) / Wye Grounded 15 / Delta N/A
Winding BIL 1675 110 350
Bushing BIL 1675 150 350
Bushing CT’s3
Two (2) Relaying
2000:5 MR C800
2000:5 MR C800
One (1) Relaying
30000:5 MR C800
One (1) Metering
30000:5 SR B1.8
One (1) Relaying
1200:5 MR C800
Impedance (Z, Z0) 17.2% on 276 MVA base
System Fault Data 41-kA symmetrical on high-voltage system, X/R = 44
Audible Sound Level In accordance with IEEE C57.12.00.
Site Design
Conditions4
Elevation (meters) Seismic Level Wind (mph)
Below 1000 Medium 90
Site Ambient
Temperatures5 Minimum (°C) Maximum (°C)
>-20 +30
1: Temperature rise conditions are defined per IEEE C57.12.00 with a limit of thermal class 120 per IEEE 1.
The ‘x’ indicated with the cooling designation to be determined by manufacturer based on force or flow.
2: Reverse power occurring when generators are offline.
3: See Article Error! Reference source not found. for requirements.
4: See Article Error! Reference source not found. for requirements associated with these ratings and capabilities.
5: Temperatures provided for calculations of the conservator only. Temperature rise values should not be calculated based on site ambient.
K. The intent of this notice is to identify potential interested offerors for the Grand Coulee Nathaniel ‘Nat’
Washington Power Plant GSU Transformer Replacements Columbia Basin Project, Washington.
L. Reclamation is seeking qualified, experienced firms capable of providing the labor, equipment, and materials necessary to accomplish the Principal Components of Work identified above and as identified within the project specifications and drawings (See attached draft summary of work). If you are interested in this project and/or your organization has the potential capacity to perform these services, please submit the following to the Point of Contact (POC) information listed below:
1. Respondents’ name, address, SAM.gov Unique Entity Identifier (UEI) number, and point of contact (name/phone/email).
2. Statement of interest as a prime and/or subcontractor. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements to include the percentage anticipated to be self-performed by each party.
3. Manufacturer and country of manufacture of the transformer(s). Please supply documentation of the country of manufacture of the transformer(s). The Government anticipates incorporating FAR provisions and clauses such as 52.225-5 Trade Agreements and or 52.225-11 Buy American-
Construction Materials under Trade Agreements in a forthcoming solicitation. Interested offerors should provide clarification on clause compliance with their transformer manufacturer information. If Buy American Act Compliance is not possible, and a waiver will be sought, please provide detailed information on reasoning.
4. Estimated transformer manufacturer lead time upon issuance of Notice to Proceed to delivery at
Grand Coulee Dam Nathaniel ‘Nat’ Washington Power Plant and start of onsite construction. For purposes of market research only, interested offerors may use a NTP date of 10/10/2027.
5. Short statement on anticipated market volatility in procuring and delivering construction material to Grand Coulee Dam (Particularly, larger components such as transformers). Interested Offeror advisement on contract inclusion of allowable FAR Economic Price Adjustment terms and conditions is also sought. If Economic Price Adjustment is not needed and standard FAR Firm
Fixed -Price construction/supply delivery terms are appropriate, please provide a statement indicating as such. This is not a promise of future solicitation EPA provision/clause inclusion.
The Government is requesting this information for market research purposes.
6. Construction bonding level, aggregate and per contract
7. Size status and/or SBA certification program for NAICS 237130 Power and Communication Line and Related Structures Construction and NAICS 335311 Power, Distribution, and Specialty
Transformer Manufacturing. Business Size, to include designation as HUBZone, 8(a), Service
Disabled Veteran Owned Small Business, Small Disadvantaged Business, Woman-Owned
Business, and Large Business. The Government must be able to verify SBA certification of
HUBZone, 8(a), and SDB via the System for Award Management (SAM) (www.sam.gov/).
8. Firm’s capability to successfully manage complex requirements. Describe your firm’s capability and experience relative to the work described in the Project Description.
9. Recent projects similar in size, scope, complexity and/or magnitude. Please provide examples of 1
(one) through 3 (three) (a minimum of one (1) project, but no more than three (3)) examples of projects substantially completed (at least 75% construction completed) within the last ten (10) years in which you have demonstrated the construction capabilities to execute the principal components of the work identified in letter I above and identify your role in the project. Please provide at least one point of contact (with email address and phone number) for project validation.
For this requirement, a similar project is defined as projects which the elements identified in letter I. Principal components of the work have been performed with a contract value of at least
$8 M. The project description should identify relevant characteristics identified in letter I and any other special provisions and/or concepts.
Project details to submit include (project submissions should include all requested information, please limit project submissions to 2 pages per project submission):
Title of Project _______________________
Contract & Task Order Number ________________
Dollar Value ____________________________
Location ____________________________
Completion Date _____________________
Point of Contact Information (Name, email address and phone number for verification):
Project Description:
10. Additional Technical/Commercial Questions for Industry Input (Ester Oil vs. Mineral Oil Options)
The Government requests responses to the following questions, as applicable, to support market research and potential finalization of specifications. Respondents may answer at a high level if certain details are proprietary or competition sensitive.
The Government is seeking input on two alternative approaches for the GSU transformers described above. Alternative A maintains the requirement for Synthetic Ester insulating fluid as http://www.sam.gov/ currently reflected in the draft specifications. Alternative B contemplates revising the requirement to allow Mineral Oil insulating fluid in lieu of Synthetic Ester. Respondents are requested to address the questions below for Alternative A and/or Alternative B, as applicable to their capabilities and typical commercial offerings. Responses may identify any assumed technical parameters, exceptions, or impacts to cost, schedule, testing, and manufacturability associated with either alternative.
10.A. Regarding supply of Synthetic Ester insulating fluid transformers:
a. Please describe your company’s capability to meet Federal Acquisition Regulations related to the Buy American Act with supply of Ester Oil transformers.
b. Please describe whether your company has completed a short circuit test for Ester Oil transformers meeting the criteria required in the specifications.
c. Please identify any other tests or technical performance criteria to which your company would take exception for a contract based upon the Ester Oil specification.
d. Please identify aspects of the Ester Oil specifications that will make supply of Ester Oil transformers difficult
e. Please identify installations supplying similarly sized transformers or other large transformers your company has completed utilizing Ester Oil transformers.
f. Please confirm whether your company will be willing to submit a bid based on the Ester
Oil specifications since the specifications will be based on Firm Fixed Price methodology described in Federal Acquisition Regulations (FAR) 16.202.
g. What changes to the Ester Oil specification would reduce the manufacturing duration associated with transformer supply.
h. Would an increase in the currently anticipated purchase quantity of (six (6) Ester Oil filled transformers) change your company’s willingness to bid on the contract without changing the oil type? If so, what is the minimum quantity necessary?
i. Would an increase in the currently anticipated purchase quantity of (six (6) Ester Oil filled transformers) result in a substantial decrease in the per transformer price
(economies of scale, example: fixturing and manufacturing setup costs)? If so, what is the minimum quantity necessary?
10.B. Regarding supply of Mineral Oil transformers:
a. Please describe your company’s capability to meet Federal Acquisition Regulations related to the Buy American Act with supply of Mineral Oil transformers.
b. Please describe whether your company has completed a short circuit test for Mineral Oil transformers meeting the criteria required in the specifications.
c. Please identify any other tests or technical performance criteria to which your company would take exception for a contract based upon the Mineral Oil specification.
d. Please identify aspects of the Mineral Oil specifications that will make supply of Mineral
Oil transformers difficult
e. Please identify installations supplying similarly sized transformers or other large transformers your company has completed utilizing Mineral Oil transformers.
f. Please confirm whether your company will be willing to submit a bid based on the
Mineral Oil specifications since the specifications will be based on Firm Fixed Price methodology described in Federal Acquisition Regulations (FAR) 16.202.
g. What changes to the Mineral Oil specification would reduce the manufacturing duration associated with transformer supply.
h. Would an increase above currently anticipated purchase quantity of (six (6) Mineral Oil filled transformers) result in a substantial decrease in the per transformer price
(economies of scale, example: fixturing and manufacturing setup costs)? If so, what is the minimum quantity necessary?
11. Provide any other comments and/or concerns.
M. Responses to this Sources Sought are due no later than 5 pm Mountain Time on March 12th, 2026.
N. This market research is for informational purposes only. This announcement does not constitute a commitment, implied or otherwise, that a procurement action will be issued, and shall not be construed as a
Request for Quote, Request for Proposal, or Invitation for Bid, or as an obligation on the part of the
Government. No entitlement to payment will arise as a result of the submission of contractor information.
O. Interested offerors can submit the information listed in section L above to Contracting Officer Colby
Clifford at CClifford@usbr.gov and Contract Specialist Drew McGuire at DMcGuire@usbr.gov. The
Government will not respond to questions or hold discussions; however, respondents are encouraged to provide written input addressing the questions in Section L. All future project information will be posted to
SAM.gov.
mailto:CClifford@usbr.gov mailto:DMcGuire@usbr.gov
File details come from the government source that posted it. Updated .