This document appears to be a set of technical specifications for the construction of a fish passage facility at Clear Creek Dam in the Yakima Project in Washington. The key details are:

The work includes constructing an intake structure, piping and pump, concrete fish ladder, dam gate automation, site lighting, electrical upgrades, and an access road. The project is located approximately 45 miles west of Yakima, Washington. A pre-bid site visit is scheduled for a future date, and attendees will need to provide and wear appropriate safety equipment. The document outlines the required divisions of work, including concrete, metals, mechanical, electrical, and waterway components. It also references additional information available to offerors, such as an I/O points list, photographs, and draft plans for water quality management and dredging.

View the file

Other files

File Type Posted
Sources_Sought_3.docx DOCX document
Sources_Sought_2.docx DOCX document
Spec_Pages_Redacted_2.pdf PDF
Spec_Pages_Redacted_1.pdf PDF
Sources_Sought_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Technical Service Center Denver, Colorado August 4, 2023

Clear Creek Dam Fish Passage Facility Yakima Project, Washington

Columbia-Pacific Northwest Region

DRAFT

This page intentionally left blank.

CLEAR CREEK DAM

Fish Passage Facility

Yakima Project, Washington

FOREWORD

Work is located at Clear Creek Dam, approximately 45 miles west of Yakima, Washington in Yakima County. Work is for construction of a fish passage. Principal components include intake structure, pump, concrete fish ladder, dam gate automation, site lighting, electrical upgrades, and access road.

PRE-BID SITE VISIT: A PREBID SITE VISIT WILL BE HELD ON {insert date}, {insert location},BEGINNING AT {insert time}. PROSPECTIVE BIDDERS SHOULD MAKE

ARRANGEMENTS BY CONTACTING [ ]AT THE TELEPHONE NUMBER LISTED

ABOVE. ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD

HATS, SAFETY VESTS.

FOR DATE AND PLACE OF BID OPENING, SEE "SOLICITATION, OFFER, AND

AWARD," STANDARD FORM 1442.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS" INCLUDING REVISIONS

AT https://intra.usbr.gov/safety/rshs/ WHICH IS APPLICABLE TO WORK UNDER

THIS CONTRACT, SEE CLAUSE AT "WBR 1452.223-81 SAFETY AND HEALTH."

This page intentionally left blank.

Clear Creek Dam Fish Passage Facility Yakima Project, Washington Solicitation No.

Table of Contents

00 01 10 - 2

DIVISION 03 - CONCRETE

03 11 10 Concrete Forming 03 15 12 PVC Waterstops 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 62 20 Nonshrink Grout for Equipment and Metalwork

DIVISION 05 - METALS

05 50 00 Metal Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 72 30 Roof Hatches 07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 11 10 Steel Doors and Frames 08 31 20 Floor Access Hatches 08 71 00 Door Hardware 08 95 16 Wall Vents

DIVISION 09 - FINISHES

09 96 20 Coatings

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 40 Engine-Generator Building

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 05 29 Supports - HVAC 23 31 00 Ducts - HVAC 23 34 00 Fans - HVAC 23 37 00 Air Inlets and Outlets

FFDIVISION 25 - INTEGRATED AUTOMATION

25 00 01 System Control and Monitoring

DIVISION 26 - ELECTRICAL

26 05 02 Basic Electrical Materials and Methods 26 05 04 Removal of Existing Electrical Equipment

Table of Contents

00 01 10 - 4

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 10 10 Fish Screen 35 21 13 Cylindrical Screen 35 21 16 False Weir and Steep Pass 35 21 21 Bulkhead Gate 35 21 23 Bar Rack 35 21 95 Steel Piping 35 22 10 Slide Gates 35 22 14 Valves and Equipment 35 79 30 Debris Boom Modifications

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 14 Jib Crane

FDIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 00 20 I-O Points List 51 00 30 Photographs 51 00 40 Water Quality Management Plan Draft 51 10 50 Dredging Plan Draft 51 00 70 Washington Dept Ecology Water Quality Plan Draft 51 00 80 Overload Permit

DIVISION 52 - DRAWINGS

52 00 00 Drawings

DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS

53 10 00 Geologic Investigations 53 20 00 Records of Geologic and Subsurface Investigations

END OF CONTENTS

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located approximately 45 miles west of Yakima, Washington in Yakima County.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Intake structure.

B. Piping and pump.

C. Fish ladder.

D. Dam gate automation with remote operation tie-in.

E. Site lighting and electrical system upgrade.

F. Electrical upgrades.

G. Access road.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.

1.04 DEFINITIONS

A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 53:

1. CO: Contracting Officer.

2. COR: Contracting Officer’s Representative.

Summary of Work

01 11 00 - 2

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION