This document is a set of draft specifications for the Clear Creek Dam Fish Passage Facility project in Yakima, Washington. The work includes construction of an intake structure, piping and pump, fish ladder, dam gate automation, site lighting and electrical upgrades, and access road improvements. The project is located approximately 45 miles west of Yakima. A pre-bid site visit is required, and attendees must wear appropriate safety gear. The specifications cover various technical requirements across divisions such as concrete, metals, HVAC, and plumbing. The related federal contract opportunity is a pre-solicitation for the Clear Creek Dam Fish Passage Facility project, with a solicitation number of 140R1024R0015, issued by the Department of the Interior Bureau of Reclamation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Spec_Pages_Redacted_3.pdf | ||
| Sources_Sought_3.docx | DOCX document | |
| Sources_Sought_2.docx | DOCX document | |
| Spec_Pages_Redacted_1.pdf | ||
| Sources_Sought_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Technical Service Center Denver, Colorado August 4, 2023
Clear Creek Dam Fish Passage Facility Yakima Project, Washington
Columbia-Pacific Northwest Region
DRAFT
This page intentionally left blank.
CLEAR CREEK DAM
Fish Passage Facility
Yakima Project, Washington
FOREWORD
Work is located at Clear Creek Dam, approximately 45 miles west of Yakima, Washington in Yakima County. Work is for construction of a fish passage. Principal components include intake structure, pump, concrete fish ladder, dam gate automation, site lighting, electrical upgrades, and access road.
PRE-BID SITE VISIT: A PREBID SITE VISIT WILL BE HELD ON {insert date}, {insert location},BEGINNING AT {insert time}. PROSPECTIVE BIDDERS SHOULD MAKE
ARRANGEMENTS BY CONTACTING [ ]AT THE TELEPHONE NUMBER LISTED
ABOVE. ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD
HATS, SAFETY VESTS.
FOR DATE AND PLACE OF BID OPENING, SEE "SOLICITATION, OFFER, AND
AWARD," STANDARD FORM 1442.
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION
"RECLAMATION SAFETY AND HEALTH STANDARDS" INCLUDING REVISIONS
AT https://intra.usbr.gov/safety/rshs/ WHICH IS APPLICABLE TO WORK UNDER
THIS CONTRACT, SEE CLAUSE AT "WBR 1452.223-81 SAFETY AND HEALTH."
This page intentionally left blank.
Clear Creek Dam Fish Passage Facility Yakima Project, Washington Solicitation No.
Table of Contents
00 01 10 - 2
DIVISION 03 - CONCRETE
03 11 10 Concrete Forming 03 15 12 PVC Waterstops 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 62 20 Nonshrink Grout for Equipment and Metalwork
DIVISION 05 - METALS
05 50 00 Metal Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 72 30 Roof Hatches 07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
08 11 10 Steel Doors and Frames 08 31 20 Floor Access Hatches 08 71 00 Door Hardware 08 95 16 Wall Vents
DIVISION 09 - FINISHES
09 96 20 Coatings
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 40 Engine-Generator Building
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 29 Supports - HVAC 23 31 00 Ducts - HVAC 23 34 00 Fans - HVAC 23 37 00 Air Inlets and Outlets
FFDIVISION 25 - INTEGRATED AUTOMATION
25 00 01 System Control and Monitoring
DIVISION 26 - ELECTRICAL
26 05 02 Basic Electrical Materials and Methods 26 05 04 Removal of Existing Electrical Equipment
Table of Contents
00 01 10 - 4
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 10 10 Fish Screen 35 21 13 Cylindrical Screen 35 21 16 False Weir and Steep Pass 35 21 21 Bulkhead Gate 35 21 23 Bar Rack 35 21 95 Steel Piping 35 22 10 Slide Gates 35 22 14 Valves and Equipment 35 79 30 Debris Boom Modifications
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 14 Jib Crane
FDIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 20 I-O Points List 51 00 30 Photographs 51 00 40 Water Quality Management Plan Draft 51 10 50 Dredging Plan Draft 51 00 70 Washington Dept Ecology Water Quality Plan Draft 51 00 80 Overload Permit
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS
53 10 00 Geologic Investigations 53 20 00 Records of Geologic and Subsurface Investigations
END OF CONTENTS
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located approximately 45 miles west of Yakima, Washington in Yakima County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Intake structure.
B. Piping and pump.
C. Fish ladder.
D. Dam gate automation with remote operation tie-in.
E. Site lighting and electrical system upgrade.
F. Electrical upgrades.
G. Access road.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 53:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
Summary of Work
01 11 00 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION