This document contains an amendment to a federal solicitation for the Steamboat Rock Log Boom project. The Bureau of Reclamation is seeking to install log booms and anchors in Steamboat Rock State Park to control log movement. The amendment provides responses to questions from potential offerors regarding access to work sites, work hours and schedules, use of pre-cast concrete anchors, log sweep specifications, field testing of harpoon anchors, barge launch procedures, and clarification of the bid due date and time. Camping restrictions and availability within the park are also addressed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140R1022B0005_Amd_0001.pdf | ||
| 140R1022B0005_Conformed_solicitation_Steamboat_Rock_v4.pdf | ||
| Sol_140R1022B0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R1022B0005 x x
0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100
R10
Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation
06/24/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/24/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Steamboat Rock Log Boom
The purpose of amendment 00001 is to provide responses to questions that were received up to 7 days after the site visit and provide the site visit attendee list. The Government will not accept any more questions. The bid opening date has not been extended with this amendment.
Legacy Doc #: BOR
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Heather Cagle
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140R1022B0005
1. Question: Confirm that access will be given to use the existing dirt road to reach the 21+77 anchor point.
Response: Access can be allowed to this area with parking located near the CXT vault toilet but will have to be coordinated with onsite personnel daily. No driving is allowed except for on existing roadways. It is approximately 450-feet of uneven terrain from the anticipated parking area to the work site and can only be accessed by foot traffic with minimal land disturbance. Use areas outside of what is listed in the Contract Drawings will have to be reviewed and approved by the CO in accordance with Section 01 57 90 Preservation of Historical and Archeological
Data.
2. Question: Is there a restriction to which days of the week can we work?
Response: There is no restriction on the days of the week that work is allowed. Archeological monitors will be onsite during the construction period. Practicable schedules (RSN I-9) are required to be submitted by the Contractor to ensure coordination of personnel onsite.
3. Question: Is there a restriction to which hours can we work per day?
Response 3: Contract Section 01 57 20-2 Environmental Controls, 1.07, B Noise Control, states
"Only construction activities approved by COR will be allowed during hours of 7:00 pm to 7:00 am” PST. Steamboat Rock State Park quiet hours are 10:00 pm to 6:00 am PST.
4. Question: Can the concrete intermediate anchors be pre-cast instead of cast-in-place?
Response: The use of pre-cast concrete intermediate anchors is acceptable as long as the concrete rebar, strength and mix design meet the requirements outlined in Contract Sections 03 20 00
Concrete Reinforcing and 03 30 00 Cast-In-Place Concrete.
5. Question: Log sweep is identified as 3” per 33’ log in the specifications; however, the drawings state that 6” sweep is acceptable. Which one of these is correct?
Response: A sweep of log no more than 6-inches per 33-feet shall be allowed per Contract
Drawing 222-100-61078.
6. Question: Field quality testing for the drilled rock anchor is provided in the specification;
however, no field quality testing for the harpoon-style anchors is provided. Please confirm no field quality testing will be required for the harpoon-style anchors or provide the necessary procedures.
Response: Contract Section 35 79 20 Log Booms, 2.01, D require the Harpoon Anchors to be
Foresight Products or equal. The Contractor is required to perform a soil test in the anchor location to determine the appropriate anchors and accessories. The installed anchor shall be load-tested immediately after installation to ensure strength per manufacture's recommendations.
Products are to be submitted via RSN 35 79 20-1 Shop Drawings, with material lists and manufactures' installation instructions.
140R1022B0005
7. Question: Are barges allowed to be launched using the boat ramp??
Response: Yes, barges will be allowed to be launched via the boat ramp in the Contract
Drawings in accordance with 46 CFR 25.25, 29 CFR 1918, 29 CFR 1926.605, State of
Washington Invasive Species, and owner/operator requirements.
8. Question: Section 10 of SF 1442 states the bid is due at 11:00 Mountain; however, Section 13 says that it is due at 11:00 local time, which is Pacific. Which is correct?
Response: Bids will be due on 08/03/2022 at 11:00 MDT.
9. Question: Will the site visit attendee list be shared?
Response: Yes, it is included with this amendment.
10. Question: It was mentioned that no camping onsite is allowed unless for security purposes and only with approval of the COR. I would assume this does not restrict the contractor from securing campsites within the park’s campground managed by Washington state Parks and Rec.
Is this correct?
Response: Camping will be allowed throughout Steamboat Rock State Park; however, campsites will have to be reserved via Washington State Parks and Recreation. There are generally two smaller areas open in the Dune and Bay Camp loops in the off season.