This file is a Questions and Answers (Q&A) document for the construction of a North Unit Visitor Center at Badlands National Park (BADL). The document contains 152 numbered questions submitted by bidders during the solicitation phase, along with government responses addressing clarifications on design intent, material specifications, scope divisions, and contract requirements. The solicitation (140PS126B0010) is a firm-fixed-price invitation for bid with a base and options structure, with an anticipated award date of November 2, 2026, and a 730-calendar-day period of performance from issuance of the Notice to Proceed. The project involves construction of a new 17,176-square-foot visitor center building on an undeveloped site within the park, requiring significant site work including earthwork, drilled concrete piers with grade beam foundations, structural steel framing, precast concrete panels, MEP systems, fire protection systems with sprinklers, security and access control systems, landscaping and irrigation, and permanent utility connections to existing park infrastructure.

Key clarifications addressed in the Q&A include: finish floor elevation of 2440.5 feet with pier bottom elevation of 2421.17 feet; bearing stratum elevation at 2425.0 feet for bidding purposes; contractor responsibility for all special inspections, quality assurance testing, and utility permits; no borrow areas available within the park requiring import of fill materials; contractor responsibility for mowing and plant establishment services for one year; all Davis-Bacon prevailing wage determinations apply; no third-party independent commissioning required; mechanical and plumbing systems utilizing cast iron piping for sanitary and storm drainage; electrical utility company (West River Electric Association) to provide and install primary cables and transformer; water utility company (West River Lyman Jones Rural Water) to provide water meter; propane system owned by NPS with contractor responsible for new gas line installation; and various architectural clarifications regarding door and window specifications, hardware sets, finishes, and material selections. The government emphasized that contract documents take precedence over specification language regarding bid formatting, and that the contractor should coordinate closely with the Contracting Officer and Contracting Officer's Representative for site-specific details and modifications during performance.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Questions & Answers Document
#Contractor QuestionReferenceGovernment ResponseReference
1Overall Site Layout Sub Sheet No. C1.2 of the contract drawings indicates “Proposed Visitor Center FF Elev: 2440.5.”

Drilled Concrete Piers and Shafts Note 3 on Sub Sheet No S0.2 of the contract drawings states, “For bidding purposes only, the Contractor shall assume the bearing stratum elevation, “competent claystone”, to be at civil elevation = 2425.0’.”

Foundation Plan Note 2 on Sub Sheet Nos. S1.1 and S1.2 of the contract drawings states, “All elevations shown on the plans are Architectural elevations. Architectural elevations of 100’-0” = Civil Elevation of 2441.0’.”

Foundation Plan Note 3 on Sub Sheet Nos. S1.1 and S1.2 of the contract drawings states, “Nominal top of floor slab elevation = 100’-0” unless otherwise noted.”

Foundation Plan Note 4 on Sub Sheet Nos. S1.1 and S1.2 of the contract drawings states, “Top of grade beam elevation = 98’-8”, UON.”

The hollow core precast planks and concrete topping (combined) are indicated to have a total depth of 1’-4” on Sub Sheet Nos. S1.1 and S1.2 of the contract drawings.

The grade beams are indicated to have a depth of 3’-0” on Sub Sheet Nos. S1.1 and S1.2 of the contract drawings.

Note 4 within the Typical Drilled Pier Detail 1 / S3.1 on Sub Sheet No. S3.1 of the contract drawings states, “All piers shall be a minimum of 15’-0” in length.”

Based on the information summarized above, will the Government please review and provide clarification to the following discrepancies?

1) What is the correct finish floor elevation of the new building?

a. Is it 2440.5’ per Overall Site Layout Sub Sheet No. C1.2 of the contract drawings, or

b. Is it 2441’ per Foundation Plan Note 2 on Sub Sheet Nos. S1.1 and S1.2 of the contract drawings?

2) What is the bearing stratum elevation (for bidding purposes) of the drilled concrete piers and shafts?

a. Is it 2425.0’ per Drilled Concrete Piers and Shafts Note 3 on Sub Sheet No. S0.2 of the contract drawings, or

b. Is it “minimum of 15’-0” in length” per Note 4 within the Typical Drilled Pier Detail 1 / S3.1 on Sub Sheet No. S3.1 of the contract drawings? Further, if this is correct, then:

i. Is it FF = 2440.5’ (per Overall Site Layout Sub Sheet No. C1.2 of the contract drawings) minus 1’-4” (for hollow core precast planks and concrete topping) minus 3’-0” (for grade beam) minus 15’-0” (for “minimum of 15’-0” in length”) = 2421.17’, or

ii. Is it FF = 2441’ (per Foundation Plan Note 2 on Sub Sheet Nos. S1.1 and S1.2 of the contract drawings) minus 1’-4” (for hollow core precast planks and concrete topping) minus 3’-0” (for grade beam) minus 15’-0” (for “minimum of 15’-0” in length”) = 2421.67’?

It is not possible to base bids on both the “assume[d] . . . bearing stratum elevation . . . of 2425.0’” and a “minimum of 15’-0” in length.”

We appreciate the Government clarifying (1) the correct finish floor elevation of the new building and (2) the bearing stratum elevation of drilled concrete piers and shafts upon which we are to base our bid (“for bidding purposes”). Structural

Sheets C1.2, S0.2, S1.1,

S1.2, S3.1Use C1.2 elevation 2440.5' as finish floor. Assume bottom of pier is 2421.17'.Olsson
2Drilled Concrete Piers and Shafts Note 26 on Sub Sheet No. S0.2 of the contract drawings states, “Load tests of drilled piers shall be as directed and monitored by the Geotechnical Engineer.”

Will the Government please:

1) Confirm that load tests of the drilled piers will in fact be required?

2) Confirm the quantity of drilled piers that will be required to be load tested?

3) Confirm the test standard and acceptance criteria for the required load testing? Structural

Sheet S0.2The construction and testing should be in accordance with applicable sections of ACI 336.3R. See note 8 on S0.2 for additional information.Olsson
3Overall Site Grading Sub Sheet No. C1.4 of the contract drawings is missing the existing contour elevations.

Will the Government please provide the bidders with the existing contour elevations?

This information is necessary in order to properly estimate and bid the earthwork-related work activities for this project. Civil

Sheet C1.4Existing elevations are shown on sheet C1.1. Will be moved above hatch on sheet C1.4. (provide updated plan sheet)HDR
4Foundations Note 12 on Sub Sheet No. S0.2 of the contract drawings states, “Soils at the foundation perimeter shall be treated for termites in accordance with accepted local practice.”
Will the Government please provide the criteria for termite treatment that it considers to be “accepted local practice” that is required to be utilized for this project?Structural
Sheet S0.2A pest control expert (100 mile radius) should be utilized for termite mitigation. Provide submittal for review.Olsson
5The Room Finish Schedule included on Sub Sheet No. i1.4 of the contract drawings indicates that window coverings, WT-1 and WT-2, are to be provided in certain rooms. Certain of these rooms have interior windows in addition to exterior windows.
Will the Government please confirm our understanding that window coverings, WT-1 and W-2, are only required to be provided at the exterior windows, and are not required to be provided for any interior windows, other than the two (2) interior windows located on the interior east wall of the Bookstore (Room) 113 (those specifically indicated by Keynote A04 on Sub Sheet No. A1.1 of the contract drawings)?Architectural
Sheets A1.1, i1.4Concur, provide as detailed.
6There is an item (possibly a marker board) identified as “MB-2,” located in Classroom 117, on Floor Plan Sub Sheet No. A1.1 of the contract drawings.

Will the Government please clarify what is to be provided for “MB-2?”

Will the Government please clarify who is to provide (furnish and install) “MB-2” (the Contractor or the Government)? Architectural

Sheet A1.1Contractor to provide. MB-2 is a 4' tall by 8 wide markerboard.KHA
7Will the Government please confirm our understanding that the “Monitor(s)” indicated on Floor Plan Sub Sheet No. A1.1 of the contract drawings are to be provided (furnished and installed) by the Government (not the Contractor) for this project?Architectural
Sheet A1.1All monitors are to be furnished and installed by the Government.KHA
8Structural Steel Note 7 on Sub Sheet No. S0.3 of the contract drawings states, “All steel indicated on the Architectural drawings to be architecturally exposed structural steel (AESS) shall conform to the AESS requirements of the AISC Code of Standard Practice.”

However, we are unable to locate any steel specifically indicated on the Architectural drawings to be AESS.

Subpart 1.3C of Section 05 10 00 of the specifications states, “All steel members exposed to view in the completed structure shall conform to all requirements of AESS 1 the AISC Code of Standard Practice for "Architecturally Exposed Structural Steel" (AESS).”

Will the Government please clarify specifically which interior and/or exterior steel members, if any, are required to be AESS for this project? Structural

Sheet S0.3

Section

05 10 00 - Structural SteelAll exposed steel is AESS 1Olsson
9Neither the Roof Framing Plan Sub Sheet No. S1.3, nor the Canopy Section detail 1 / S4.5 on Sub Sheet No. S4.5, of the contract drawings indicate that any metal roof deck is to be provided for the canopies.

Further, the Canopy Section detail 4 / A3.4 on Sub Sheet No. A3.4 of the contract drawings indicates that “composite standing seam metal roofing panels” are to be provided for the canopies.

Will the Government please confirm our understanding that metal roof deck is not required to be provided for the canopies? If our understanding is not correct, please clarify what type of metal roof deck is to be provided for the canopies.

Additionally, will the Government please clarify what is to be provided for the “composite standing seam metal roof panels” for the canopies? Is the Government describing a type of prefabricated, insulated metal wall panel (sandwich panel)? If so, please provide a specification (including required R-value) for these “composite standing seam metal roof panels.” Structural

Sheets S1.3,

S4.5, A3.4Roof panels are structural, no additonal metal deck required for canopies.Olsson
10Who (the Contractor or the Government) is responsible for providing the special inspector(s) and performing the special inspection services identified in the IBC Schedule of Special Inspection Services tables included on Sub Sheet Nos. S0.6 and S0.7 of the contract drawings?

This responsibility is not clear, as there are numerous references throughout the specifications indicating that the Owner (i.e., the Government) will provide special inspection services.

Additionally, separate and distinct from the special inspection services identified above, are we correct in our understanding that the Contractor is responsible for providing the testing laboratory services and inspections required by the specifications? Structural

Sheets S0.6, S0.7Contract documents specify which special inspections need to occur. all special inspections are the responsibility of the contractor.Olsson
11The Model No. "10125XM" shown for the outdoor drinking fountain includes an identifier that correlates to the type of material for the fountain. The identifier shown is "XM" However, the manufacturer of the fountain has told us they do not have a fountain with an "XM" identifier. Their fountains are manufactured from three (3) separate types of material as follows:

(SM) = Black Iron (SMSS) = 304 Stainless Steel (SMSS316) - 316 Stainless Steel The type of material required will change the cost of the fountain and needs to be determined prior to bid.

Will the Government please confirm the correct identifier or type of material required for the outdoor drinking fountain. Civil

Detail 2/C5.8Use Model 10125SMSS (304 Stainless Steel).HDR
12Who (the Contractor or the Government) is responsible for providing the Quality Assurance testing (other than preconstruction testing of materials for compliance with the specification) as stated in the specifications?
The responsibility is not clear, as there are numerous references throughout the specifications indicating that the Owner (i.e., the Government) will provide Quality Assurance testing.CivilAll Quality Assurance testing to be Contractor-furnished.HDR
13Would the company that prepared the Geotechnical Investigation Report for the Government be prohibited from participating in this contract by providing testing and inspection services? Considering the remoteness of this project site and small pool of qualified testing/inspection firms within a reasonable driving distance, we request Government consideration to allow the Company to participate.Solicitation, Instructions, Conditions and Notices to Offerors or Respondents, second paragraph under "A) GENERAL"No - the government has not prescribed any prohibitive language concerning subcontracting outside of the Limitations in Subcontracting Clause. The Prime may subcontract with whomever they wish, provided the Prime meets the limitations in subcontracting requirements (85%). Take note of "similarly situated" language therein as well and remember to provide a copy of your Limitations in Subcontracting worksheet with your bid.CO Response
14On Foundation Plan Sub Sheet No. S1.1 of the contract drawings there are notes for both mechanical yards that state, “Paving – See Civil.” However, the Civil contract drawings—for example, Sub Sheet Nos. C1.2, C1.9, and C1.10—do not show any paving being provided within the mechanical yards.

Will the Government please clarify the following?

1) What type of paving (i.e., concrete sidewalks, gravel, etc.) is to be provided within the mechanical yards?

2) If concrete sidewalks are to be provided, what is the required joint layout?

3) How is the finished surface to be constructed so that surface water is able to drain out of the mechanical yards (as it appears the surface water will be dammed by the architectural precast concrete walls)? Civil

Sheet Nos.

S1.1, C1.2 C1.9, & C1.10 1) Provide concrete sidewalk within the mechanical yards.

2) Provide joints at 8' maximum.

3) Provide area drain in each mechanical yard connected to storm line.HDR, KHA
15On Sanitary Sewer Plan & Profile Sub Sheet No. C8.2 of the contract drawings, there is a note that states, “Connect to existing sewer,” which is located at a manhole labeled as “MH #1.”
Will the Government please clarify if “MH #1” is an existing manhole, or if “MH #1” is a new manhole that is to be constructed by the Contractor?Civil
Sheet C8.2The contractor is to provide a new MH #1 to replace the existing manhole. Will add to demo plan.HDR
16There are numerous “Type 1 Curb Ramp[s]” and “Type 3 Curb Ramp[s]” indicated on Sub Sheet Nos. C1.9 and C1.10 of the contract drawings.

Civil Details Sub Sheet No. C5.7 of the contract drawings includes generic information and details for these curb ramps; however, all of the details state, “Detectable warnings as specified in the plans.”

We are unable to locate where the detectable warning surfaces are specified or indicated within the contract drawings.

Will the Government please provide a specification for the type of detectable warning surfaces that will be required at the curb ramps? Civil

Sheet Nos.

C1.9, C1.10,

C5.7Provide ABA compliant Type 1 cast-iron detectable warning panel. The detectable warnings will be uncoated/unpainted cast iron for application in concrete curb ramps.HDR
17Flag Note 17 on Sub Sheet No. E0.1 of the contract drawings states, “Route to existing primary electrical access point approximately 425 feet away south of Cedar Pass Lodge. Provide two primary pull boxes per Power Company.” Flag Note 10 on Sub Sheet No. E0.1 of the contract drawings states, “Horizontal bore under existing paved areas.”

Will the Government please provide a photograph (or a marked-up drawing) showing exactly where this “existing primary electrical access point” is located?

Will any cutting and patching of any existing asphalt pavement, concrete sidewalks, concrete curbs and gutters, or any other existing surfaces be required in order to make connection to the “existing primary electrical access point?” Electrical

Sheet E0.1A photograph is not available. The area identifed falls within a public area for site visitation. See drawing number C1.1 for locations of existing underground electrical near Cedar Pass Lodge. No pavement repair will be necessary with the use of directional boring.Alvine
18Flag Note 1 on Sub Sheet No. E0.1 of the contract drawings states, “Provide fiber optic cable in 4” PVC-40 underground conduit.” Flag Note 10 on Sub Sheet No. E0.1 of the contract drawings states, “Horizontal bore under existing paved areas.” Flag Note 3 on Sub Sheet No. E0.1 of the contract drawings states, “Provide 24” x 36” in-ground pull box with cover plate labeled ‘fiber optic.’”

Will the Government please provide a photograph of the plan south side of the Existing Visitor Center, showing exactly where this new underground conduit and in-ground pull box are to be located?

Will any cutting and patching of any existing asphalt pavement, concrete sidewalks, concrete curbs and gutters, or any other existing surfaces be required in order to perform this work? Tele-communications

Sheet E0.1A photograph is not available. The area identified falls within a public area for site visitation. There is an existing sidewalk along the southeast side of the building that will need to be cut and patched. Locate the new pull box 24 inches away from the sidewalk.Alvine
19Flag Note 5 on Sub Sheet No. E0.1 of the contract drawings states, “Route fiber optic cable to existing IT room and make termination.”
Will the Government please clarify where within the Existing Visitor Center the existing IT room is located relative to the point of entry of this new fiber optic cabling into the building?Tele-communications
Sheet E0.1Coordinate exact location with COR upon successful bid; existing IT room is in southwest corner of existing VC.Alvine
20The Monument Sign detail 2 / A4.5 on Sub Sheet No. A4.5 of the contract drawings states, “Design of structural connections, footings and vertical connections at panels are to be by the sign fabricator.”

Since this project is a design-bid-build type project, will the Government please provide the criteria and details for the monument sign footings?

For example:

• Are drilled concrete shafts and piers with grade beams required, or are spread footing foundations sufficient?

• If drilled concrete shafts and piers with grade beams are required:

o How many drilled concrete shafts and piers are required at each monument sign?

o What are the assumed diameters of the drilled concrete shafts and piers?

o What are the assumed depths of the drilled concrete shafts and piers?

o What are the dimensions and layout requirements for the grade beams?

• If spread footing foundations are acceptable:

o Are there any specific subgrade preparation criteria that will be required below the spread footing foundations?

o What are the dimensions and layout requirements for the spread footings?

o Is there a certain depth required to the bottom-of-footing elevation?

o Will a concrete stem wall (between the spread footing and the precast monument sign wall panels) be required at each monument sign?

It would be beneficial to all bidders and the Government if the Government was willing to provide an assumed detail for the monument sign foundations for the purposes of bidding. Structural

Sheet A4.5Monument sign: Monument sign is to conform to the size, material, and configuration shown on the drawing, and signage as shown on drawings. The design intent is to match the existing monument sign near the Ben Reifel Center entrance drive. Final shop drawings shall confirm that connections, concrete sign, and concrete footings comply with the stated wind load (from structural design criteria on sheet S0.1) and soil bearing capacity from Geotechnical Report (included in this addendum). Concrete materials and reinforcing shall comply with the criteria for concrete exposed to weather on sheet S0.1. Provide shop drawings that meet the design intent, showing the contractor’s means and methods of fabrication and erection.
21Subpart 3.1B of Section 01 10 00 of the specifications states, “No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.”

We are unable to locate any requirements within the contract documents that require the Contractor to provide any project identification signs, on-the-job safety performance signs, or safety bulletin board signs for this project.

Will the Government please confirm our understanding that project identification signs, on-the-job safety performance signs, and/or safety bulletin board signs are not required for this project If our understanding is not correct, please provide the requirements for any temporary signage that is required for this project. General

Section 01 10 00 Division 1 Short Form General

RequirementsPer Contractors approved safety plan.
22Subpart 2.1 of Section 01 10 00 of the specifications states, “Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative

(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.”

We understand that the Contractor will be required to contact the CO/COR and utility companies to request location services of the existing underground utilities for this project.

We are unable to locate any requirements within the contract documents that require the Contractor to utilize any third-party utility locating companies to locate the existing underground utilities for this project. It is our understanding that, based on the referenced specification above, the CO/COR and utility companies will be the parties responsible for performing location services, upon the Contractor’s request/notification.

Will the Government please confirm our understanding that the Contractor will not be required to utilize any third-party utility locating companies to locate the existing underground utilities for this project? General

Section 01 10 00 Division 1 Short Form General

RequirementsThe Contract Documents do not require the Contractor to retain a third-party utility locating firm for routine utility location services. In accordance with Section 01 10 00, the Contractor shall notify the CO/COR and applicable utility owners and request utility location services prior to excavation activities. The Contractor remains responsible for protecting existing utilities and safely performing the work.
23Section 32 93 50 of the specifications includes specific requirements for the “plant establishment services” that are to be provided by the Contractor “during the growing season . . . for one year following seeding/planting installation.”

The scope of work for the plant establishment services prescribed within Section 32 93 50 of the specifications does not include any requirements for the Contractor to provide mowing and/or edging/trimming services of the seeded areas during the establishment period.

Will the Government please confirm our understanding that the Government (not the Contractor) will be responsible for mowing and/or edging/trimming services of the seeded areas during the establishment period? Civil

Section 32 93 50 Plant Establishment

ServicesThe Contractor will be responsible for mowing and/or edging/trimming services of the seeded areas during the establishment period.
24SWPPP Note 1 on Sub Sheet No. C1.3 of the contract drawings states, “The Prime Contractor shall be responsible for development, implementation and compliance with the requirements of the permit of the storm water pollution prevention plan (SWPPP) for their entire contract.”

Will the Government please clarify what specific stormwater-related permit(s) will be required for this project?

Will the Government obtain the required permit(s) and pay any applicable fees, or will the Contractor be responsible for obtaining the permit(s) and paying any applicable fees?

Are there any fees associated with the required stormwater-related permit(s)? If so, please identify the applicable fees.

Will a Notice of Intent (“NOI”) be required for any stormwater-related permit(s) for this project? General

Sheet C1.3

Section 01 10 00 Division 1 Short Form General

RequirementsA stormwater discharge permit is required from the South Dakota Department of Agriculture and Natural Resources. The permit requires both NPS and contractor involvement for a NOI, Contractor Authorization, NOT, and SWPPP updates. The fee is currently $100 annually.HDR
25Subpart 9.1C.12 of Section 01 10 00 of the specifications states, “List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.”

Will the Government please clarify whether any specific construction permits are required to be obtained by the Contractor for this project?

Additionally, will the Government please clarify whether the Contractor is required to obtain any permits from, and/or pay any permit fees to, Jackson County, the Town of Interior, the State of South Dakota, or any other local or state agency for performance of the work under this contract?

If any such permits or fees are required, please identify the applicable permits, permitting agencies, and fees. General

Section 01 10 00 Division 1 Short Form General

RequirementsThe Contractor is responsible for determining and obtaining permits required for performance of the Work, except for permits specifically identified elsewhere in the Contract Documents as Government-furnished. The Contractor shall coordinate permit requirements with the agencies having jurisdiction and shall identify any Government-furnished information necessary to support permit applications.
26The Flared End Section Tied Concrete Mat Detail 3 / C5.4 on Sub Sheet No. C5.4 of the contract drawings includes a note that states, “On inlet side construct rip-rap to 2’-0” min above and around pipe.”

It is unclear as to where this rip-rap material is required, as the referenced detail is providing requirements for the outlets at the flared end sections, not inlets.

Will the Government please clarify where the referenced rip-rap is required to be provided? Civil

Sheet C1.4

Section 31 23 05

Excavation & FillPlan note will be revised to read, "On the outlet side construct rip-rap to 2’-0” min above and around pipe".HDR
27Overall Site Grading Sub Sheet No. C1.4 of the contract drawings indicates that a substantial amount of fill material will be required to be procured, hauled, and delivered to the project site in order to construct this project. Subpart 2.1 – Materials of Section 32 23 05 of the specifications includes the specific requirements for this “Granular Under-Slab Fill,” “Granular Structural Fill,” “Soil Structural Fill,” and “Suitable Soil Material as Non-Structural Fill” material.

It was verbally confirmed by the Government during the virtual pre-bid site visit that there are no borrow areas within the Badlands National Park (BADL) available to the Contractor from which this specified and required material may be obtained.

Will the Government please confirm what was stated during the virtual pre-bid site visit, that there are no borrow areas within the Badlands National Park (BADL) available to the Contractor from which this specified and required material may be obtained? Civil

Sheet C1.4

Section 31 23 05

Excavation & FillConfirmed there are no borrow areas within the Badlands National Park.
28The Typical Interior Housekeeping Pad Detail 5 / S3.1 on Sub Sheet No. S3.1 of the contract drawings includes a note that states, “Precast topping over hollow core.”
Will the Government please confirm our understanding that this note is a typo and is intended to state, “Composite concrete topping over hollow core” (not “precast topping”)?Structural
Sheet S3.1Detail will be revised to read "composite concrete topping over hollow core"Olsson
29Subpart 1.6C – Coordination of Section 23 05 93 of the specifications states, “Perform TAB after leakage and pressure tests on air and water distribution systems have been satisfactorily completed.”

We are unable to locate any requirements within the contract documents that require the Contractor to perform DALT (duct air leakage testing) for the new HVAC ductwork.

Will the Government please confirm our understanding that DALT is not required for this project?

If our understanding is not correct, please provide the specific DALT requirements for this project? Mechanical

Section 23 05 93 Testing, Adjusting & Balancing for

HVACTAB air leakage testing is not required on this project however general installation water leakage tests will need to be performed to ensure the water systems do not have any leaks requiring repairs before system acceptance.
30Subpart 1.2E.a of Section 01 10 00 of the specifications states, “Clarification: The Notice to Proceed will be issued with a period of performance that is all inclusive of . . . final commissioning.” Additionally, Subpart 9.1C – Preconstruction Conference Submittal of Section 01 10 00 states that the “Contractors Commissioning Plan” is to be “submitted prior to the Preconstruction Conference or as specified at the CO’s discretion.”

We are unable to locate any requirements within the contract documents requiring the Contractor to utilize an independent, third-party commissioning firm or to provide independent third-party total building commissioning services for this project.

Will the Government please confirm our understanding that the Contractor is not required to retain an independent, third-party commissioning firm or perform independent third-party commissioning services for this project?

Additionally, will the Government please confirm that the Contractor and its subcontractors will not be required to participate in any separate commissioning activities performed by a Government-directed or Government-contracted commissioning firm? General

Section 01 10 00 Division 1 Short Form General

RequirementsAs currently written by the A&E, there is no requirement for "3rd party independent comissioning." As for not being required to participate in any 3rd party comissioning later on, the contract can always be modified (if determined in-scope by the CO) to include such requirements, though none are expected or need be included in the bid.
31Subpart 2.1F of Section 21 13 00 of the specifications states, “Provide fire department connections where indicated.”

A note on Sub Sheet No. F1.1 of the contract drawings states, “out to remote pedestal fire department connection.” However, the contract drawings do not clearly indicate the location of this remote fire department connection (FDC) (other than detail 3 / F2.0 on Sub Sheet No. F2.0 of the contract drawings, which states, “Min. 40-ft from building”).

Will the Government please clarify the required location of the remote pedestal FDC for this project and identify its location on the contract drawings? Fire Protection

Sheet Nos. F1.1, F2.0

Section 21 13 00

Fire Suppression Sprinkler SystemsThe remote FDC location will be added on the civil drawings.Alvine
32Subpart 2.1A of Section 21 13 00 of the specifications states, “Sprinkler System: Provide coverage for entire building.”

Sub Sheet No. F1.1 of the contract drawings identifies two (2) specific exterior areas, indicated by a black line labeled “exterior overhang – see architectural plans,” where “exposed dry head[s]” are required.

Will the Government please confirm that fire sprinkler coverage at exterior overhangs is required only at the two (2) overhang areas specifically identified on Sub Sheet No. F1.1, and is not required at other exterior overhangs located around the remainder of the building perimeter? Fire Protection

Sheet F1.1

Section 21 13 00

Fire Suppression Sprinkler SystemsThe overhang areas identified on the fire protection drawing F1.1 are the areas required to have fire protection as the other areas around the building are simple soffits that do not extend beyond 2-feet from the building. Only areas identified by the letter designation "C" on this sheet are required to be protected by the exposed dry heads.Alvine
33The solicitation provides a contract duration of 730 calendar days from issuance of the Notice to Proceed (“NTP”) for the Contractor to complete the project. The solicitation identifies an Anticipated Award Date of 2 November 2026. Accordingly, assuming the NTP is issued shortly after award, the Contract Completion Date would be on or about 1 November 2028.

The Contractor understands that this project involves construction of a new building on an undeveloped site and that the initial major site activities will include earthwork, installation of the drilled concrete piers, and construction of the cast-in-place concrete grade beam foundations.

Due to the anticipated extremely cold weather and climatic conditions at the project site during the winter months, these major site and foundation activities are not anticipated to be reasonably executable until the Spring of 2027. Consequently, given the anticipated late-season contract award, issuance of an NTP shortly after award would result in approximately four to five months (120 to 150 calendar days) of the 730-calendar-day contract duration occurring before meaningful physical construction activities can reasonably commence.

This seasonal limitation is particularly significant because a substantial amount of work must then be accomplished during the 2027 construction season in order to achieve building enclosure prior to the onset of the subsequent cold-weather season. Building enclosure is necessary to allow the Contractor to proceed with the substantial interior construction activities during late 2027 and into early 2028.

In consideration of these project-specific circumstances, would the Government please consider utilizing a two-part NTP for this project, or otherwise providing an equivalent adjustment to the contract duration to account for the seasonal limitations associated with the anticipated November 2026 award?

Under a two-part NTP approach, the first NTP could authorize the Contractor to immediately commence preconstruction activities, including preparation, review, and submission of required submittals, procurement activities, coordination, and other work that can reasonably be performed prior to physical mobilization. This would allow the Contractor to advance submittals and initiate fabrication and procurement of long-lead materials and equipment as early as practicable.

The second NTP could then be issued in conjunction with the Contractor’s physical mobilization to the project site in Spring 2027, at which time the 730-calendar-day contract performance period would commence. This approach would provide the Contractor with the full 730 calendar days necessary to execute the physical construction work following the period during which weather conditions reasonably preclude commencement of the major site and foundation activities.

Absent an adjustment of this nature, the Contractor would effectively have only approximately 580 to 610 calendar days to perform the physical construction work, despite the solicitation providing a 730-calendar-day contract duration.

The Contractor respectfully requests that the Government consider this approach, or an equivalent extension of the contract duration, to account for the seasonal limitations associated with the anticipated timing of award and NTP.

We appreciate the Government’s consideration. Contracting

Standard Form 1442ANSWER REVISED 10/19: See PDF "BADL VC_Addendum No 01 incorporated under Amendment 03." Days have been corrected to 730 by the A&E. As for the other points to this question, a 2-part NTP is often used by the CO for more complex construction like this and will be considered and discussed during the Pre-CON. Concerning weather delays, it's natural for the CO to issue a formal Suspension of Work and "pause" the PoP for the duration of Suspension. After suspension is lifted, the CO negotiates a revised PoP usually commensurate with the number of days the contract was under suspension. Dont worry too much about this issue -- the government will not hold the contractor to unreasonable timelines when it comes to weather considerations on a long PoP like this one. A friendly reminder to the asker that such modifications are "Bilateral" in nature, requiring agreement of the parties, in almost all non-emergency cases.Contracting Officer Response
35The Structural General Notes on Sub Sheet No. S0.2 of the contract drawings include numerous references to the “Geotechnical Investigation Report prepared by American Engineering Testing, dated 01-25-2023.”
Will the Government please provide bidders with a copy of the referenced Geotechnical Investigation Report, including any available addenda, supplements, revisions, or other associated geotechnical information?Structural
Sheet S0.2Will Provide per addendum.KHA
36Drilled Concrete Piers and Shafts Note 3 on Sub Sheet No. S0.2 of the contract drawings states: “Contractor’s base bid shall include a unit cost (per ft of pier) for final adjustments to elevations.”

However, the Bid Schedule included in Section B – Bid Schedule of the solicitation does not contain a unit price bid item for drilled concrete piers or adjustments to pier elevations.

Will the Government please confirm that the unit cost requirement referenced in Drilled Concrete Piers and Shafts Note 3 on Sub Sheet No. S0.2 is not applicable to the bid and that no separate unit price for adjustments to pier elevations is required to be included with the Contractor’s proposal?Contracting
Sheet S0.2ANSWER REVISED 10/19: This is a Firm-Fixed Price Invitation for Bid with a Base and Options requested as "Lump Sum." Please follow the solicitation criteria as specified. A bid will not be rejected for omitting the "per ft. of pier" pricing data or for failing to conform with any language in the Specification that speaks to the Bid Format. The CO's solicitation instructions (generally Section L) take full and final precidence over anything written by the A&E within the Specification Documents. With regard to bid formatting and pricing, stick to the solicitation and bid schedule requirements.Contracting Officer Response
37The Water Meter and Lawn Sprinkler Detail 2/P4.1 on Sub Sheet No. P4.1 of the contract drawings identifies a point of demarcation of work between the “Mechanical Contractor” and the “Sprinkler Contractor.”
Will the Government please confirm that the Contractor’s scope of work for the irrigation and/or lawn sprinkler system terminates at the point shown on Detail 2/P4.1, approximately 5'-0" outside the exterior wall of the building, and that all irrigation and/or lawn sprinkler work located beyond this point is excluded from the Contractor’s scope of work and will be furnished and installed by the Government and/or a separate “Sprinkler Contractor” under a separate contract?Civil
Sheet P4.1The mechanical documents provide a point of demarcation where the mechanical/plumbing contractor's work stops and the lawn irrigation contractor's work begins based on the detail.Alvine
38The Remarks section associated with the Security and Electrical Door Hardware Coordination Schedule on Sub Sheet No. T0.1 of the contract drawings appears to be missing.
Will the Government please provide the missing Remarks and any associated information necessary for bidders to properly interpret and coordinate the Security and Electrical Door Hardware Coordination Schedule?Electrical
Sheet T0.1The following are the Remarks A.DOUBLE DOOR WITH BOTH DOORS CONTROLLED AND MONITORED.
B.LOCATE CARD READER ADJACENT TO OUTSIDE AUTO-OPERATOR ACTUATOR. DISABLE ACTUATOR INPUT WHEN DOOR IS IN LOCKED/SECURED STATE.
C.DOOR SHALL BE PROVIDED WITH INTERNAL SOUNDER THAT IS TRIGGERED WHEN DOOR IS OPENED.Alvine
39Neither the fire protection contract drawings (including Sub Sheet Nos. M0.1, F1.1, and F2.0) nor the applicable Division 21 specification sections indicate that a fire pump is required to be provided as part of the fire protection system for the project.

Fire Protection General Note G on Sub Sheet No. M0.0, however, requires the “Sprinkler contractor to perform fire hydrant flow testing at the project site prior to hydraulic design of the system in order to determine the currently available water pressure and flow at the site.”

Accordingly, the adequacy of the existing water supply for the fire protection system cannot be determined by the Contractor at the time of bidding. The results of the required fire hydrant flow testing and the subsequent hydraulic design will determine whether the available water pressure and flow are sufficient to serve the required fire protection system or whether additional equipment, such as a fire pump, will be necessary.

Will the Government please confirm our understanding that, if the required post-award fire hydrant flow testing and hydraulic design determine that a fire pump is necessary to achieve the required fire protection system performance, and such fire pump is not otherwise indicated or required by the contract documents, the addition of the fire pump and associated work will be considered a change to the contract and the Contractor will be entitled to an equitable adjustment for the resulting costs and impacts? Fire Protection Sheets M0.0,

F1.1, & F2.0It is assumed that the existing fire water system that is owned by the Park has sufficient flow and pressure to eliminate the need for a fire pump and associated tanks and electrical feed. If the contractor's post-bid hydrant test shows that a fire pump & supplemental fire water storage tank will be required to support this building, a change order will need to be added to the contract.Alvine
40Flag Notes 10 and 17 on Sub Sheet No. E0.1 of the contract drawings require the Contractor to “horizontal bore under existing paved areas,” “route to existing primary electrical access point approximately 425 feet away south of Cedar Pass Lodge,” and “provide two primary pull boxes per Power Company requirements.” Additionally, the new pad-mounted transformer shown on Sub Sheet No. E0.1 is identified as a “new Utility Company pad mounted transformer.” Similar information is provided on Sub Sheet Nos. E2.1 and E5.1. Further, Flag Note 11 on Sub Sheet No. E5.1 states, “C.T.’s provided by the Power Company.”

Subpart 1.15D – Coordination of Section 26 04 00 of the specifications states: “Coordinate electrical service connections to components furnished by utility companies. Coordinate installation and connection of exterior underground utilities and services, including provision for electricity-metering components.”

Additionally, Subpart 3.14 – Utility Company Service of Section 26 04 00 states: “The utility company will provide and install the primary cables and transformer and will connect the secondary cables to the transformer.”

Based on the above requirements, it appears that the Contractor is responsible for providing the infrastructure necessary to facilitate the electrical service connection, while the electric “Power Company” / “Utility Company” is responsible for providing and installing the primary cables and transformer and making the secondary connection.

Will the Government please confirm our understanding that the Government will be responsible for directly contracting with and making direct payment to the electric “Power Company” / “Utility Company” for all utility-company-furnished work and materials identified in the contract documents, including the primary cables, transformer, and associated utility-company work?

If our understanding is not correct, and the Contractor is instead required to contract directly with and/or make payment to the electric “Power Company” / “Utility Company” for any portion of the utility-company-furnished work, please identify the specific work and associated costs, fees, charges, or allowances that bidders are required to include in their base bid. Electrical Utility E0.1, E2.1, & E5.1

Section 26 04 00

Common Requirements for ElectricalThe contractor will coordinate with the Electrical Utility Company for the installation requirements and be responsible for all fees and payments until final acceptance of the building.Alvine
41General Water Line Construction Note 1 on Sub Sheet No. C8.1 of the contract drawings states: “Contractor shall contact West River Lyman Jones Rural Water to coordinate water service installation. They need to be onsite inspection during the construction of the water service improvements.”

General Water Line Construction Note 2 on Sub Sheet No. C8.1 states: “A 3” Sensus Cordonel water meter shall be provided and installed in a water meter vault as shown in the plans.”

Additionally, Subpart 3.8 – Service Connections of Section 22 10 05 of the specifications states: “Water meter to be provided by water utility company. Contractor to rough in and install.”

Based on the above requirements, it appears that the Contractor is responsible for coordinating with West River Lyman Jones Rural Water and installing the water meter provided by the water utility company. However, the contract documents do not identify any utility-company fees or other costs associated with the required onsite inspection or the furnishing of the water meter.

Will the Government please clarify whether the Contractor will be responsible for paying any fees, charges, or other costs imposed by West River Lyman Jones Rural Water for:

1.Onsite inspection during construction of the water service improvements; and/or
2.Furnishing the 3” Sensus Cordonel water meter.
If the Contractor is responsible for any such fees, charges, or costs, will the Government please identify the applicable amounts or provide the basis for determining the amounts that bidders are required to include in their bids?Water Utility

C8.1

Section 22 10 05

Plumbing PipingThe plumbing specification 220400 states under Section 1.9 - PERMITS, Item A, that the contractor shall familiarize themselves with all requirements regarding all permits, fees, etc., and shall comply with them. Item C under the same section states that all utilities shall be installed in accordance with the local rules and regulations and all charges shall be paid by the Contractor until final acceptance.Alvine, HDR
42General Propane Line Construction Notes 1 through 4 on Sub Sheet No. C8.5 of the contract drawings include specific requirements related to the construction of the new propane utility line from the connection point at the existing 2-inch gas line (i.e., “Connect to existing 2” gas line”) to the location of the new propane meter and pressure regulator.

Flag Note 4 on Sub Sheet No. P1.1 of the contract drawings states: “Propane meter location – propane meter, shut-off valves, pressure regulator, etc. located outside and upstream of building by Local Utility Company.”

Subpart 2.12D.11 – Service Meters of Section 22 10 05 of the specifications states: “Propane service and meter will be furnished and set by propane utility company.”

Subpart 3.8 – Service Connections of Section 22 10 05 of the specifications states: “Propane service, meter, and pressure regulator will be furnished by propane utility company. Connect new system to regulator outlet.”

Based on the above requirements, it appears that the propane utility company is responsible for providing the new propane utility line indicated on Sub Sheet No. C8.5 (i.e., new propane service), as well as the propane meter, pressure regulator, and associated utility-company work, and that the Contractor’s scope begins at the outlet of the utility company-furnished pressure regulator and extends into the building.

Will the Government please confirm that the Government will be responsible for directly contracting with and making direct payment to the propane “Local Utility Company” for all utility-company-furnished work and materials identified in the contract documents, including the propane service (i.e., the new propane utility line indicated on Sub Sheet No. C8.5 of the contract drawings), meter, pressure regulator, and associated utility-company work?

If the Contractor is instead required to contract directly with and/or make payment to the propane “Local Utility Company” for any portion of the utility-company-furnished work, please identify the specific work and associated costs, fees, charges, or allowances that bidders are required to include in their base bid. Propane Utility

Section 22 10 05 Plumbing Piping The NPS is the owner of the propane system.

Contractor to be responsible for the new gas line installation and tie-in to owner system.Alvine, HDR
43Will the Government please provide the company name, point of contact, and contact information for the representative at the electric “Power Company” / “Utility Company” responsible for the electrical “Power Company’s” / “Utility Company’s work associated with this project?GeneralWest River Electric Association
44Will the Government please provide the point of contact and contact information for the representative at West River Lyman Jones Rural Water responsible for West River Lyman Jones Rural Water’s onsite inspections and furnishing of the water meter associated with this project?GeneralThe WRLJ point of contact during the design phase was Mike Vetter (mvetter@wrlj.com).

Michael Vetter West River/Lyman-Jones Rural Water PO Box 144 Philip, SD 57567

45Will the Government please provide the company name, point of contact, and contact information for the representative at the propane “Local Utility Company” responsible for the propane “Local Utility Company’s” work associated with this project?GeneralNPS System, Coordinate with park COR.
46Propane Service Line / Profile: The drawings show a 2-inch underground propane service transitioning to 1-1/2-inch underground propane piping serving the building and emergency generator, but a profile is not provided. Please confirm whether a propane service profile is available and provide the required minimum/maximum cover, entry and exit elevations, location of the 2-inch to 1-1/2-inch transition, and any required HDD/bore profile or design criteria.Drawings P1.1 and C8.5Direct boring will be used. Minimum 5' depth.Alvine
47Division 28 Panic / Duress: Please confirm whether the fixed panic buttons shown/specified constitute the complete personnel duress requirement for this project, or whether wearable duress devices, staff tracking/RTLS, or any other personnel duress system is required.Spec. 28 13 00; Security/Technology DrawingsNo wearable duress signals are in the scope of this work; Provide as designed.
48Cellular DAS / BDA / ERRCS: Please confirm whether a cellular distributed antenna system (DAS), bi-directional amplifier (BDA), emergency responder radio coverage system (ERRCS), or other public-safety radio enhancement system is required as part of this contract.Division 27/28; Technology Drawings T0.0–T8.5No enhancement in package
49IPTV / Digital Signage: Please confirm whether any IPTV, digital signage, content management system, media players, head-end equipment, or similar display system is required under this contract, beyond the power/data/rough-in provisions shown for displays and exhibits.Technology/Electrical Drawings; Exhibit 108 provisionsN.I.C.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .