B08_Price_Schedule_SEKI-_PHASE_2_Rev1_0004.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
SEKI/ KNP Phase II Tree Hazard Removal
Solicitation number
140PS125Q0009
Issued by

About this file

This is a Price Schedule Excel file for a National Park Service (NPS) contract to mitigate tree hazards in Sequoia and Kings Canyon National Parks (SEKI) following the 2021 KNP Complex Wildfire. The document details a comprehensive tree removal and management project with 48 contract line items (CLINs) covering various tree-related services including felling, limbing, topping, slash management, log manipulation, and environmental protection measures.

The price schedule covers multiple tree diameter categories ranging from 4" to 42"+ DBH (diameter at breast height), with specific tasks for different tree sizes and locations, including special provisions for the Mineral King Road area. Key activities include tree felling, bole bucking and loading, slash management (chipping, piling, scattering), log hauling, and ancillary services like traffic control, silt fence installation, and ditch repair. The solicitation (Number 140PS125Q0019) is part of Phase 2 of the tree hazard mitigation effort, with all line items currently showing $0.00 pricing, suggesting this is a draft or template document for bidding purposes.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Rev 1

CONTRACT BID SCHEDULE (REVISED 6/25/2025) PHASE 2 CONTRACT
National Park Service (NPS) - ConOps Strategic
Solicitation Number: 140PS125Q0019
PARK - PMIS: SEKI 326438
Location: Parkwide
Project Title: Mitigate Tree Hazards, PHASE 2, KNP Complex Wildfire
Contract Line Item (CLIN)PWSItem TitleEstimated QuantityUnit of MeasureUnit PriceTotal Price
00011.1, 1.2Mobilization1LPSM$0.00
00021.3Tree, fell, limb & top, 4-11" DBH549Each$0.00
00031.3Tree, fell, limb & top, 12-19" DBH1,287Each$0.00
00041.3Tree, fell, limb & top, 20-25" DBH1,099Each$0.00
00051.3Tree, fell, limb & top, 26-29" DBH655Each$0.00
00061.3Tree, fell, limb & top, 30-41" DBH881Each$0.00
00071.3Tree, fell, limb & top, 42+" DBH540Each$0.00
00081.4, 2.2Slash and stem: chip, pile or lop & scatter, 4-11" DBH tree549Each$0.00
00091.4, 2.2Slash: chip, pile or lop & scatter, 12-19" DBH tree1,287Each$0.00
00101.4, 2.2Slash: chip, pile or lop & scatter, 20-25" DBH tree1,099Each$0.00
00111.4, 2.2Slash: chip, pile or lop & scatter, 26-29" DBH tree655Each$0.00
00121.4, 2.2Slash: chip, pile or lop & scatter, 30-41" DBH tree881Each$0.00
00131.4, 2.2Slash: chip, pile or lop & scatter, 42+" DBH tree540Each$0.00
00141.4, 2.2Slash, Western Portion of Red Fir Spray Field, masticate or chip & spread1LPSM$0.00
00151.5, 1.8, 2.3Bole, buck and load, 12-19" DBH980Each$0.00
00161.5, 1.8, 2.3Bole, buck and load, 20-25" DBH879Each$0.00
00171.5, 1.8, 2.3Bole, buck and load, 26-29" DBH643Each$0.00
00181.5, 1.8, 2.3Bole, buck and load, 30-41" DBH209Each$0.00
00191.5, 1.8, 2.3Bole, buck and load, 42-60" DBH134Each$0.00
00201.5, 1.8, 2.3Bole, buck and load, 12-19" DBH, Mineral King Road140Each$0.00
00211.5, 1.8, 2.3Bole, buck and load, 20-25" DBH, Mineral King Road90Each$0.00
00221.5, 1.8, 2.3Bole, buck and load, 26-29" DBH, Mineral King Road60Each$0.00
00231.5, 1.8, 2.3Bole, buck and load, 30-41" DBH, Mineral King Road30Each$0.00
00241.5, 1.8, 2.3Bole, buck and load, 42-60" DBH, Mineral King Road10Each$0.00
00252.2Bole, manipulate to disperse, 12-19" DBH100Each$0.00
00262.2Bole, manipulate to disperse, 20-25" DBH75Each$0.00
00272.2Bole, manipulate to disperse, 26-29" DBH50Each$0.00
00282.2Bole, manipulate to disperse, 30-41" DBH30Each$0.00
00292.2Bole, manipulate to disperse, 42-60" DBH20Each$0.00
00302.4Existing high stump, flush-cut500Each$0.00
00311.7Existing felled tree, limb, top, lop & scatter/chip slash, 12-19" DBH185Each$0.00
00321.7Existing felled tree, limb, top, lop & scatter/chip slash, 20-25" DBH tree216Each$0.00
00331.7Existing felled tree, limb, top, lop & scatter/chip slash, 26-29" DBH258Each$0.00
00341.7Existing felled tree, limb, top, lop & scatter/chip slash, 30-41" DBH41Each$0.00
00351.7Existing felled tree, limb, top, lop & scatter/chip slash, 42-60" DBH25Each$0.00
00361.8Existing felled tree, manipulate bole to disperse, 12-19" DBH50Each$0.00
00371.8Existing felled tree, manipulate bole to disperse, 20-25" DBH tree50Each$0.00
00381.8Existing felled tree, manipulate bole to disperse, 26-29" DBH25Each$0.00
00391.8Existing felled tree, manipulate bole to disperse, 30-41" DBH15Each$0.00
00401.8Existing felled tree, manipulate bole to disperse, 42-60" DBH10Each$0.00
00412.7Silt fence, install2,000LF$0.00
00422.8Ditch, repair incidental damage1.00LPSM$0.00
00432.9Hydraulic mulching, ditch repair areas5Acre$0.00
00442.10Culvert inlet, cleanout, incidental10Each$0.00
00452.11Traffic control1LPSM$0.00
00462.11Traffic control, supervisor1LPSM$0.00
00471.14Logs, haul for offsite disposal3,718Ton$0.00
00481.14Logs, Mineral King Road trees only, haul for offsite disposal799Ton$0.00
Total ESTIMATED Price - (CLIN 1 through 48)$0.00