This document is a Q&A Summary that addresses questions related to the Statement of Work (SOW) for the Apollo District Parking Lot #6 Demolition/Removal/Revegetation project at Canaveral National Seashore.
The key details are:
- The SOW requires copper AWG 12 wiring to be used inside the conduit.
- The contractor must provide their own water for the required 60-day watering period, as the park will not be providing a water connection.
This Q&A Summary document does not provide an overview of the specific products or services required under the contract. It is focused on addressing questions about the technical requirements outlined in the SOW.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140PS124R0014_Amd_0001.pdf | ||
| SOW_Addendum_(July_2024)_0001.pdf | ||
| Attachment_K_-_Site_Visit_Sign_In_Sheet_0001.pdf | ||
| Attachment_I_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Attachment_C_-_Planting_Plan.pdf | ||
| Attachment_D_-_Price_Schedule.pdf | ||
| Attachment_H_-_Wage_Determination_(2015-4533)(07_May_2024).pdf | ||
| Attachment_F_-_Past_Performance_Questionnaire.doc | DOC document | |
| Sol_140PS124R0014.pdf | ||
| Attachment_B_-_Photos_of_Existing_Conditions.pdf | ||
| Attachment_A_-_Parking_Lot_6_Project_Site_Map.pdf | ||
| Attachment_E_-_Technical_Questionnaire.docx | DOCX document | |
| Attachment_G_-_Statement_of_Work.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Reference Reference
SOW 1.7.12,
Drawings pg2
SOW 1.7.12
[Document Reference]
SOW
SOW
Government Response Example: Wiring is to be copper AWG 12. SOW has been updated.
The Contractor must provide their own water.
Questions & Answers Document Contractor Question
Example: The specifications state that wiring is to be used inside of the conduit. What type of wiring is to be used?
[First Question Here]
Will the park be providing a connection for water for the required 60 day watering period for the referenced requirement? If so, how close is the water connection(s) in relation to where the watering will be done?