This document is Amendment 2 to Solicitation 140PP027R0001, issued by the National Park Service (NPS) ConOps DSC Central on October 21, 2026, with an effective date of 10/21/2026. The amendment addresses questions submitted by offerors through November 9, 2026, and the hour and date specified for receipt of offers is not extended. Offerors must acknowledge receipt of this amendment prior to the deadline by completing items 8 and 15 on the form, returning copies to the issuing office, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt at the designated location prior to the specified deadline may result in rejection of the offer.

The Q&A section clarifies seven questions and addenda regarding the solicitation: the site visit sign-in sheet has been provided; additional site visits require coordination with the Contracting Officer; this is a small business set-aside (ISBEE); both pages 75 and 80 provide general instructions to offerors; cover letters, tabs, and tables of contents are included in page count; the key personnel resume form attachment is provided for convenience but offerors may use alternative formats containing the same information; and addenda have been added for Contract Line Item Numbers 0004 and 0008. The addenda specify that CLIN 0004 (Visitor Center Move) requires an IT specialist to manage relocation of a 7-foot network rack and associated components to a temporary maintenance area location, and the contractor must provide resumes demonstrating applicable network certifications and references for a minimum of five similar government or NPS IT projects. CLIN 0008 (Option C): Visitor Center Interior Accessibility Compliance includes disconnecting and reconnecting server rack components from the temporary location to the new permanent visitor center location.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Stormy Gallagher

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to answer questions through 11.09.2026.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

NPS ConOps DSC Central 1 Denver Federal Center, Building 8 P.O. Box 25287 Denver CO 80225-0287

PDC

140PP027R0001

10/21/2026

10/21/2026

1 3

Question No.

Sheet or

Reference Question Response

Amendment Answered

Can you please share the sign in sheet from the site visit?

Attached

Will there be another site visit?

If another site visit is needed, please coordinate with the Contracting Officer 1

Is this a small business set-aside?

Yes, this is an ISBEE set-aside

In the RFP, sections titled: INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER INFORMATION – COMPETITIVE SOURCE SELECTION appear on pg. 75 and pg. 80. Both sets of instructions are different. Please confirm which set of instructions the proposer is supposed to follow.

Page 75, provides general instrructions and guidance to potential offerors. Page 80 provides general instructions and guidance to potential offerors.

5 Are Cover letters, Tabs, Tables of Contents, etc. included in the page count? Yes. 2

Pg. 77 of 86 under FACTOR 5: “Submit resumes for key personnel as identified in Section H of this solicitation and listed below. All personnel proposed are subject to substitution requirements contained in this solicitation. There is no preprinted form for this submittal.”

Please confirm if we are required to submit resumes using the provided form titled:

B08_Attachment_5b_Solit_PSP_Vol_I_Key_Personnel_Resume_Form

The attachement is provided for your convenience. You may use a form of your choosing as along as it contains the same information as attachment 5b 2

7 Addendum to Contract Line Item Number 0004: Visitor Center Move : See attached sheet. 2

EFMO 318539 - 224159, Rehabilitate Visitor Center & Parking Lot

Addendum to Contract Line-Item Number 0004: Visitor Center Move:

The contractor shall include an Information Technology (IT) specialist on the project to specifically address the relocation of active network components and the subsequent integration of this equipment into the end user network. Please refer to the below for scope and qualification requirements as it relates to CLIN 004:

At the existing facility, there is a 7-foot network rack housing fiber patch panel(s), copper patch panel(s), wire manager(s), network switch(es) Power distribution unit(s) (PDU), Uninterruptible Power Supply (UPS) unit(s), and server(s). The scope of work is to demolish the copper patch panels and relocate the rack with the associated fiber patch panel(s), wire manager(s), network switch(es), UPS(s), PDU(s), and Server(s) to a temporary location at an existing maintenance building at the Visitor Center Maintenance Area for use during construction. The final temporary location will be confirmed with the contracting officer prior to relocation. The scope also includes coordination of the proper shutdown of all active equipment (switch, server) prior to relocation then the reconnection, configuration, and activation of this equipment at the new location. This activation shall allow the server to be visible and operational on the network at the new location.

On sheet TD300 of the construction drawings, refer to viewport 4. The existing condition of the rack is illustrated. The scope defined herein supersedes the drawing in such that the "RG" designation (as defined on sheet T000) is not applicable. Refer to sheet TD101 for reference to the rack location within the building.

To be considered for this scope of work, the contractor shall adhere to the bidding requirements set forth by the bidding requester as well as provide:

· A resume of the personnel who will be on site indicating all their applicable training, certifications, and other such qualifications that are applicable to network architecture, network setup, and other such network programming requirements for this project.

· A project reference indicating a minimum of five (5) projects where the contractor has worked directly with government and/or NPS IT teams to support on a similar project.

Addendum to Contract Line-Item Number 0008 (Option C): Visitor Center Interior Accessibility Compliance, Plumbing, & Electrical (LRF Funded):

• Add: This option includes disconnecting the server rack and rack components from the temporary maintenance area location identified in CLIN 004, and moving and reconnecting any necessary rack components to the new permanent location in the visitor center.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .