This is a Questions and Answers document for solicitation 140PP027Q0018, issued by the National Park Service for the rehabilitation of kiosk restrooms at Oregon Caves National Monument & Preserve in Josephine County, Oregon.
The project involves restroom improvements to an existing kiosk building containing two restrooms, three toilets, two sinks, and one urinal. The work must be completed within a 90-day performance period to ensure final completion prior to cave tour resumption in late March 2027. Key clarifications address licensing requirements, indicating that quoters with current and valid state licenses applicable to the work will be more favorably evaluated; the Residential construction wage determination (OR20260006) applies since the building is under four stories, and contractors must initiate post-award conformance processes (SF-1444) for any trade classifications not listed on the applicable wage determination. FAR 52.219-14 does not apply to this acquisition. A previously completed hazardous materials report indicates no asbestos-containing materials were identified in tested materials, though lead analysis was not included; additional asbestos and lead testing results will be issued via formal Solicitation Amendment, estimated by November 20, 2026. Existing as-built drawings are not available. The contractor may utilize Pacific Power & Light for power and must provide a portable generator at their own expense when utility power is unavailable; water is provided by the National Park Service, and worker/visitor sanitation facilities are available at the Historic District approximately 900 feet away. Technical approach submittals must include a 5-page narrative addressing project sequencing and timeline, risk management strategies, equipment specifications with manufacturer spec sheets for major components (toilets, urinals, partitions, sinks), and a written narrative or layout diagram demonstrating ADA compliance feasibility. Detailed layout shop drawings will be required post-award for NPS review and approval before installation begins.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. 140PP027Q0018
REHABILITATE KIOSK RESTROOMS TO IMPROVE VISITOR ACCESS AND EXPERIENCE
OREGON CAVES NATIONAL MONUMENT & PRESERVE
JOSEPHINE COUNTY, OREGON
QUESTIONS AND ANSWERS RECEIVED TO DATE
1: We are a small business holding a California contractor license (CSLB B General Building) and will perform the work through Oregon CCB-licensed subcontractors. Does submitting the Oregon CCB licenses of our subcontractors satisfy the Oregon Contractor State License requirement in the quote instructions when the prime holds a California license, or must the prime hold an Oregon CCB license at quote time or by award?
NPS Response: Regarding the quoter’s and any proposed subcontractor’s applicable Oregon Construction Contractors Board License, we will review any supplied information. Those who possess a current and valid State License applicable to the work they will be performing on this project will be more favorably evaluated.
2. The attached wage determination OR20260006 is the Residential construction type. Should the Building wage determination for Josephine County apply to this public restroom project?
NPS Response: Because the project involves a building under four stories, the Building wage determination does not apply. If a specific trade or labor classification required for this work is not identified on the applicable wage determination, the successful contractor shall initiate a post-award conformance process (SF-1444) immediately following contract award.
3. Does FAR 52.219-14 / 13 CFR 125.6 apply, and is the work considered general construction (85%)?
NPS Response: No, FAR 52.219-14 is not applicable to this acquisition.
4. How many restrooms, water closets, lavatories and urinals are in the kiosk building, and are any as-built drawings available?
NPS Response: Existing: Two restrooms, three toilets, two sinks, one urinal. No existing as-built drawings are available.
5. Is there a hazardous materials (asbestos/lead) survey for the existing tile, mortar bed and paint?
NPS Response: NPS is providing a previously completed hazardous materials report indicating that no ACM was identified in the kiosk for the materials tested. This report does not include lead analysis. See B08_Att_05_ORCA Hazmat Report 2011.pdf. The park has initiated additional asbestos and lead testing and will issue the results through a formal Solicitation Amendment once available, currently estimated by November 20, 2026.
Solicitation 140PP027Q0018, Attachment 04, Questions & Answers
6. Will Caves Highway and the site be open and plowed December through March, and are there work-hour or vehicle weight limits?
NPS Response: Caves Highway is plowed by Oregon Department of Transportation, Highway 46 is Oregon State Highway. NPS has a plow that clears the parking lot at the site location.
7. Will power and water be available to the contractor during the work, and is a temporary visitor restroom required?
NPS Response: The Park's main power is provided by Pacific Power & Light, which the Contractor may utilize. The contractor shall provide a portable generator at their own expense whenever utility power is unavailable, including but not limited to instances caused by inclement weather conditions, scheduled power outages, or other grid disruptions. Water is provided by the National Park Service. Regarding temporary visitor restrooms, the Specifications state, "Worker and visitor sanitation facilities are available at the Historic District, approximately 900 feet from the project site.”
8. May a subcontractor's superintendent serve as the on-site superintendent?
NPS Response: One person may hold multiple roles as long as they meet the qualifications for the roles and are able to perform the required duties of each.
9. The specifications list "ADA feasibility prior to bid submission." Is a submittal required with the quote?
NPS Response: Thank you for your question. We have updated the Technical Approach evaluation factor (found on page 28 of the Solicitation) to read as follows:
b. Technical Approach: The technical approach describes your proposed means, methods, and operational strategies to complete the technical requirements of this solicitation. Quoters must submit a brief written narrative detailing their approach to successfully accomplishing this project. This submittal will be evaluated as described in provision FAR 52.212-2.
Page Limit Constraints: 5-Page Narrative Limit + Spec Sheets in an Appendix
Format: There is no preprinted form for this submittal.
Your technical approach shall address the specific aspects listed below:
Project Sequencing & Timeline:
Describe your methodology for sequencing the work outlined in the specifications. This must demonstrate how you will successfully execute the work within the 90-day performance period to ensure final completion prior to the resumption of cave tours in late March 2027.
Risk Management:
Identify potential risks that could impact the project schedule or price and propose realistic mitigation strategies and solutions to resolve them.
Solicitation 140PP027Q0018, Attachment 04, Questions & Answers
Equipment Specifications & ADA Feasibility:
Submit manufacturer specification ("spec") sheets for all proposed commercial-grade fixtures designated for major components of work (including, but not limited to, toilets, urinal, partitions, and sinks).
Provide a written narrative or layout diagram demonstrating the feasibility of your proposed approach in achieving full ADA compliance.
Note: Detailed layout shop drawings will be required post-award for National Park Service (NPS) review and approval to confirm strict compliance with ADA requirements prior to the commencement of installation.
10. Will another site visit be made available?
NPS Response: NPS will update the solicitation with details if it schedules another site visit.