Atch_1_Questions_Answers_Pictures_0001.pdf

PDF 559 KB Posted

Attached to
Curecanti National Recreation Area-Septic Pump Tru
Solicitation number
140PP027Q0014
Issued by
Not on record

About this file

This is a Questions and Answers document for federal contract opportunity 140PP027Q0014, addressing the replacement of a septic pump truck tank at Curecanti National Recreation Area.

The government clarified key technical and design requirements through 27 questions. The replacement tank must maintain a maximum height of 10 feet from ground level to accommodate future transport without overheight permitting. The back-of-cab-to-trunnion dimension is 185½ inches. No specific ASME authorization stamp, DOT cargo-tank certification, or manufacturer qualification is required to be submitted with quotes, though ASME-rated dished heads and compliant baffles are material and technical requirements. The completed tank must be vacuum-tested and pressure-tested at rated operating conditions, with test documentation and evidence of qualified welding practices provided before final acceptance. The contractor is responsible for ensuring the performing fabricator is qualified and that the finished tank complies with applicable laws, regulations, and vehicle safety requirements.

The government confirmed that a natural aluminum finish is acceptable without exterior paint. Design equivalents are acceptable provided they support the primary mission functions: drafting water from a lake into a 500-gallon freshwater compartment through suction, and allowing freshwater to backfeed through the waste line to flush and refill vault toilets. Key approved features include three 5-inch sight eyes instead of the nonfunctional manual level gauge, a rear manway positioned approximately one-quarter of the way up the tank, and a standard top-fill connection with drafting capability. The government confirmed the chassis has spring-ride suspension with a single steering box. The truck is roadworthy but trailer transport is recommended. No drawings are available from the original manufacturer, though interested fabricators may arrange pre-quote inspections and request additional dimensions.

View the file

Other files

File Type Posted
Sol_140PP027Q0014_Amd_0001.pdf PDF
Sol_140PP027Q0014.pdf PDF
Atch_3_DOL_Wage_Determination_2015-5435.pdf PDF
Atch_2_Experience_Questionnaire.xls XLS spreadsheet
Atch_1_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Curecanti National Recreation Area-Septic Pump Truck Tank Replacement

140PP027Q0014

Questions and Answers

Question 1:

Is there a maximum overall vehicle height or other height restriction for the replacement tank assembly?

Government Response:

The current tank is 10 feet from ground level to top of tank/walkway. We would like to keep it at 10 feet for potential transport reasons in the future to minimize the need for over height permitting.

Question 2:

What is the back of cab to trunnion dimensions?

Government Response:

The back-of-cab-to-trunnion dimension is 185 ½ inches.

Question 3:

Does the agency require the prime or the performing fabricator to hold or submit any specific ASME authorization/stamp, welding certification, DOT tank certification, manufacturer qualification, or other license with the quote? The SOW specifies ASME-rated heads/baffles and applicable vehicle safety compliance; we want to distinguish material/technical requirements from required credentials.

Government Response:

No specific ASME authorization, ASME vessel stamp, DOT cargo-tank certification, manufacturer authorization, or other special license is required to be submitted with the quote under the current SOW. The references to ASME-rated dished heads and ASME-compliant baffles are material and technical requirements and do not require the completed tank itself to be ASME code-stamped unless otherwise stated in the solicitation.

The prime contractor remains responsible for ensuring that the performing fabricator is qualified to complete the work and that the finished tank and installation comply with the SOW, applicable laws and regulations, chassis/body-builder requirements, and vehicle safety requirements. The completed tank shall be vacuum-tested and pressure-tested at its rated operating conditions. Test documentation, material compliance information, and evidence of qualified welding or fabrication practices shall be provided before final acceptance.

A DOT specification cargo-tank certification is not required unless the proposed design or intended service is subject to a specific DOT hazardous-material cargo-tank specification.

Vendors should identify any certification or regulatory requirement they believe applies to their proposed tank.

Question 4:

A. Is the truck operable and currently legal to drive to the contractor’s facility, or must all bidders price trailer transport?

B. Can an interested fabricator arrange a pre-quote inspection or obtain any additional dimensioned drawings/technical records beyond the SOW photos.

Government Response:

A. Please review the delivery requirements in the Statement of Work. The truck is roadworthy; however, trailer transport is recommended.

B. Yes, interested fabricators may arrange a pre-quote inspection or request additional dimensions. Following contract award, the truck will be available at the selected fabricator’s facility to provide direct access for fabrication of the new tank.

Drawings of the current truck are not available. We attempted to obtain drawings from the original manufacturer, but the company ceased operations approximately five years ago.

Question 5:

The chassis width and available tank mounting dimensions?

Government Response:

Please review Statement of Work and attached labeled pictures.

Question 6:

The existing tank's skid dimensions, mounting configuration, and any available fabrication drawings.

Government Response:

Please review Statement of Work and attached labeled pictures. No drawings available.

Question 7:

The truck's front and rear axle weights, front and rear GAWR, and empty vehicle weight.

Government Response:

Additional pictures of truck data plate and tank specifications provided.

Question 8:

The existing vacuum pump manufacturer and model number, including a photograph of its identification plate if available.

Government Response:

Please review Statement of Work and attached labeled pictures.

Question 9:

The required tank operating vacuum rating and whether the complete tank must be ASME code-stamped, or whether the ASME requirements apply only to specified components.

Government Response:

Please refer to Government Response for Question 3.

Question 10:

The required interior liner or protective coating specifications.

Government Response:

Interior waste compartment shall be coated with a high-build epoxy or equivalent corrosion-resistant lining designed for continuous septic and wastewater service.

Contractor shall provide product data and recommended maintenance requirements.

Question 11:

Whether the existing tank contains residual material and what disposal procedures or documentation the contractor must follow.

Government Response:

The tank is used and may contain a small amount of residual material. The contractor is responsible for identifying and complying with applicable state and local requirements for disposal of the tank and any residual material.

Question 12:

Whether the Government can provide photographs of the truck, existing tank, mounting points, plumbing, and pump.

Government Response:

Please review Statement of Work and attached labeled pictures.

Question 13:

Whether there are any additional vehicle condition issues or modifications that the contractor should account for.

None are known.

Question 14:

Should the new tank be painted desert brown to match the existing tank, or should it have a natural aluminum finish? If painting is required, can you provide the required color specification?

Government Response:

A natural aluminum finish is acceptable; exterior paint is not required.

Question 14:

Does the new tank need to match the existing tank’s configuration exactly, or are equivalent features and our standard design acceptable? The tank is over 20 years old. The tank does not need to look or have the exact parts.

Government Response:

We know advances in technology have come about since it was originally built. So, an equivalent is acceptable. The main point is that we flush the "fresh water" back through the suction line to clean it and put water back into the vault toilets. Also, we have the ability to suck water from the lake into the "fresh water" compartment from the rear of the truck.

Question 15:

Are the rollover protection bars shown on top of the existing tank required? If so, which components must they protect? Some components appear to sit outside the protected area.

Government Response:

The bars at the top I believe are a semi walkway and protect what is on top from trees and branches mainly. Our goal would be to protect to the best of ability the components on the top. Not necessarily roll over protection.

Question 16:

What is the purpose of the approximately 2-inch vacuum hose running from the secondary separator to the top of the tank, and must it be included?

Government Response:

I believe the line you are seeing on the separator is the suction line entering the 500-gallon freshwater tank. This line allows us to draft water into the tank through the valve system.

We do not fill the freshwater tank from the top.

Question 17:

Is the secondary separator’s apparent configuration of two inlets and one outlet required?

Our standard configuration has one inlet, one outlet, and a drain.

The purpose of the current configuration is so we can draft from the lake into the fresh through the waste outlet and pump through the waste outlet, through changing valving. To accomplish our mission, we have to draft water from the lake, not top fill. And once finished pumping, through the valves on the rear of the truck allow the fresh to feed through the suction line back into the vault toilets. An equivalent configuration is acceptable, provided it supports these same functions and mission.

Question 18:

What is the purpose of the water line running along the upper bars to a small ball valve at the rear of the truck? Is this line required?

Government Response:

If we are looking at the correct line described. Looking at the rear of the truck, the 1-inch line on the upper left was just a pressure gauge. It is not required.

Question 19:

What size and type of top-fill connection is required for the water tank?

Government Response:

A standard top fill that will also allow drafting is required. Our main way to fill the 500 gallon fresh tank is through drafting/suction from our lake.

Question 20:

What is the purpose of the line connected approximately one-quarter of the way up the water tank, on the driver’s side about 3 feet from the front, that runs toward the rear? Is this line required?

Government Response:

Looking at the rear of the tank on the drivers side metal line that runs in the tray is the suction line to the fresh tank. The green poly line is how we allow water to back feed through the waste line to flush it out and fill the vault toilets back with water. The metal line on the rear that has double 90 degree connections on the passenger side into the tank is a secondary waste suction line. The secondary waste suction line is not necessary. A way to draft fresh and then be able to flush into the waste suction line is necessary.

Question 21:

What is the purpose of the second port located between the tank and the dump outlet, and is it required?

Government Response:

Yes, a way to allow the fresh water to be allowed back through the waste line is necessary. If there is an equivalent design to allow this to happen is acceptable.

Question 22:

Would our standard inlet design be acceptable? It connects in approximately the same location, enters the tank low, and uses an internal standpipe extending approximately three-quarters of the way up the tank, with a diffuser plate to break up incoming debris.

Government Response:

We have found this method staying low is the best in the current configuration. After describing the metal line on the rear passenger side is not used and we mainly use the lower. If your design is proven and the back flow of fresh water would be possible. It could be a suitable alternative.

Question 23:

Is a specific level gauge required? The existing rear-mounted gauge appears to be nonfunctional. Would our standard arrangement of three 5-inch sight eyes be acceptable?

Government Response:

Yes, we removed the old manual level gauge. It was untrustworthy and failed constantly. In the SOW we state the use of sight eyes.

Question 24:

May we position the rear manway in a similar location to the existing one, approximately one-quarter of the way up the rear of the tank?

Government Response:

Yes, rear manway can be altered to fit new tank configuration.

Question 25:

Does the chassis have air-ride or spring-ride suspension?

Government Response:

Spring ride suspension

Question 26:

What is the distance from the rear of the cab to the center of the trunnion?

Government Response:

The back-of-cab-to-trunnion dimension is 185 ½ inches.

Question 27:

Does the chassis have single or dual steering boxes?

Single steering box