This document is an amendment to Solicitation 140P9724Q0059 for the Modernization of (2) Elevators at Wrangell St. Elias National Park. The purpose of this amendment is to: 1) answer questions from vendors, 2) change the solicitation from a small business set-aside to an open competition, and 3) require the vendor to be located in Alaska for responsive warranty and emergency support.

The period of performance is from 07/10/2024 to 12/31/2024 on a firm-fixed-price basis. The scope includes elevator modifications necessary to meet code requirements, with any additional electrical or fire alarm work only required if the selected equipment necessitates it. This is no longer a small business set-aside. The National Park Service, Alaska Region is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to WRST 329503A MODERNIZE ELEVATORS, newest first.
File Type Posted
Sol_140P9724Q0059_Amd_0003.pdf PDF
B09_AMD_3_Picture_0003.pdf PDF
Sol_140P9724Q0059_Amd_0002.pdf PDF
Sol_140P9724Q0059.pdf PDF
B08_Attach_2_Wage_Determination_5_2_24.pdf PDF
B08_Attach_1_SOW-WRST_Elevator.pdf PDF
B08_Attach_3__Bid_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P9724Q0059 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PAK

Anchorage AK 99501-2327 240 W. 5th Ave, Room 114 NPS, ARO - Alaska Regional Office

06/12/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/12/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MODERNIZATION OF (2) ELEVATORS AT WRANGELL ST ELIAS NATIONAL PARK

THE PURPOSE OF THIS AMENDMENT IS TO:

A. ANSWER QUESTIONS FROM VENDORS

B. CHANGE FROM A SMALL BUSINESS SET ASIDE TO OPEN. THIS IS NO LONGER A SMALL BUSINESS SET

ASIDE.

C. ADD - THE VENDOR NEEDS TO BE IN ALASKA FOR REPSONSE TIME TO WARRANTY AND AMERGENCY

ISSUES.

QUESTION: Do not see what work by others (fire panels, updated electrical work, sprinklers, etc.) will be required in the building to complete the code compliant elevator system. Is

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Janet Milson

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P9724Q0059/0001 there any requirement for work beyond the elevator scope?

ANSWER: Elevator modifications are required to be up to code. Upgrades to the alarm panel and electrical outside of the mechanical room and elevator shaft are not part of this scope unless required by equipment selected by contractor and installed. If the equipment specified by the vendor requires additional wiring of alarm panel or electrical wiring to be upgraded to be functional this would be on the contractor to complete. If wiring and panel upgrades are not needed to maintain current functionality of alarm panel and the current electrical service is adequate for new elevator components, no additional work is needed to meet scope. Any wiring upgrades needed in the elevator shaft, hallway call buttons and in the mechanical room are within the scope of this project.

Period of Performance: 07/10/2024 to 12/31/2024

FIRM FIXED PRICE

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .