Sol_140P8625Q0072_Amd_0002.pdf
PDF 91 KB Posted
- Attached to
- REPLACE FRONT WHEELCHAIR RAMP MAHE CHAPE
- Solicitation number
- 140P8625Q0072
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a project at Building 201, Fort Mason in San Francisco, California, issued by NPS, PWR - GOGA MABO. Amendment 002, effective 08/21/2025, addresses seven specific contractor questions regarding an apparent ramp renovation project. Key clarifications include: no asbestos material is expected, parking lot bathrooms are available for use, the contractor must supply power and water, a full-time superintendent is sufficient, existing footings must be removed and can be replaced with pre-cast concrete, no borrow material is required, and drawings must show a new design complying with current ADA code without requiring a Professional Engineer stamp. The contract number is 140P8625Q0072, and the Contracting Officer is Patty Payne, who can be reached at 559-730-6435 or patty_payne@nps.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8625Q0072 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
08/21/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/13/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 002 is to answer questions.
Question 1: Are there any specific environmental or cultural requirements for this project?
Answer Question 1: Restrictions are listed in the specifications, color and materials will be submitted pre-construction.
Question 2: Is any asbestos material expected in the existing ramp materials/debris? If so, does testing need to be completed prior to removal and off-site hauling, and whose responsibility will it be to handle asbestos materials?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Patty Payne
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0072/0002
Answer Question 2: No
Question 3: Where is the closest source of power and water available to the contractor? Will the contractor need to provide temporary sanitation facilities, or can the existing parking lot facilities be used?
Answer Question 3: Parking lot bathrooms are available for use, no temporary facilities needed. Power and water will need to be supplied by the contractor.
Question 4: Is the contractor required to provide a full-time Quality Control Supervisor, Safety
Officer, and Superintendent during construction, or will a full-time Foreman/Superintendent onsite be sufficient?
Answer Question 4: Full time superintendent is sufficient.
Question 5: Do the existing footings for the handrail posts need to be removed or reused? In the case of replacement, can pre-cast/prefabricated concrete footings (same size as the existing ones) be used to save curing time and maintain project progress?
Answer Question 5: They will need to be removed and poured new. Pre-cast is acceptable.
Question 6: Will any borrow material be required for backfilling, and is compaction testing of the existing grade required?
Answer Question 6: None required.
Question 7: Do the drawings provided by the contractor require a Professional Engineer (PE) stamp and structural design, or are they intended to be shop drawings that simply match the existing size, dimensions, slope, and materials?
Answer Question 7: The drawings do not need to be stamped, they will however, need to show the new design that complies with current ADA code, as the existing ramp does not.
Contracting Officer: Patty Payne Phone:
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0072/0002
559-730-6435 Email: patty_payne@nps.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .