Section_J_-_Att_No__002_SOW.pdf

PDF 88 KB Posted

Attached to
SUMMER PORTABLES FOR GOLDEN GATE NATIONAL RECREATI
Solicitation number
140P8625Q0033
Issued by

About this file

This document is a Scope of Work (SOW) for summer portable toilet and sink rentals for the Golden Gate National Recreation Area (GOGA) in San Francisco and San Mateo County. The National Park Service requires a contractor to supply and service standard and ADA-compliant chemical toilets and sinks at specified locations, with twice-weekly servicing on Mondays and Fridays before noon.

Key requirements include thoroughly cleaning and disinfecting units, restocking toilet paper, sanitizing touch surfaces, and ensuring functional sinks with soap dispensers and paper towels. The contractor must perform monthly maintenance inspections, replace damaged units at no additional cost due to regular use or vandalism, and comply with 2015 ADA requirements. Rental will be at a set price, paid monthly upon invoice submission, with the contractor responsible for properly disposing of waste and quickly addressing any performance deficiencies identified by the National Park Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

GOLDEN GATE NATIONAL RECREATION AREA

FORT MASON, SAN FRANCISCO, CA 94123

SCOPE OF WORK FOR SUMMER PORTABLE TOILET AND SINK RENTALS

Supply and Service Portable ADA Toilets at each specific location, as well as provide service to units. All units are located on National Park Service Property. Locations and placement information is contained in an attached document.

The Contractor shall provide all the labor, materials, transportation, personnel and professional expertise to provide standard and ADA chemical toilet rental and pumping services which are in compliance with 2015 ADA (American’s with Disabilities Act) requirements and this Scope of Work for the San Francisco and San Mateo County areas of Golden Gate National Recreation Area (GOGA).

National Park Service, Golden Gate National Recreation Area, San Francisco, CA requires these services for rental units on a scheduled and On Call basis.

Locations for rental units are attached.

Contract will include provision of pumping and cleaning all standard, ADA units, sinks and provide a provision (damage waiver) for units to be replaced upon damage or NPS request. Rental will be at a set price and paid out on a monthly basis when a proper invoice is submitted.

If rental units are damaged due to regular use, i.e., broken door hinge, broken toilet seat, leaking tank, etc., it is the responsibility of the Contractor to replace the broken feature or replace the unit in a timely manner at no additional cost to the Government. If vandalism of the unit(s) occurs, it is the responsibility of the Contractor to replace the damaged unit(s) in a timely manner at no additional cost to the Government.

Units will be serviced/pumped twice weekly on Mondays and Fridays before noon each day.

If a federal holiday falls on a Monday, the units will be serviced by noon the following day.

At each pumping, the toilets will be thoroughly cleaned, disinfected, and re-stocked with toilet paper.

Toilet seat, grab handles, door handles, and other touch surfaces are to be sanitized. Floor of units will be left free of trash and debris to be considered serviced, and the interiors rinsed as needed. Sinks will be functional with working soap dispensers and paper towels.

The Contractor shall perform a maintenance inspection monthly during contract. Such inspection shall be both visual and on-site for restrooms to check for proper cleanliness, operability, supply, general conditions, and reliability. Trash that has been removed from the tank prior to pumping must be disposed of properly and NOT put in the visitor trash receptacles. All modifications to this contract shall be in writing and counter signed by the contractor.

If NPS determines that there are deficiencies in the performance of this contract, NPS will provide a written or electronic notice to the Contractor to correct the deficiency within a specified time frame.

File details come from the government source that posted it. Updated .