Pre-Solicitation_Announcement_140P8622R0007_2.pdf
PDF 147 KB Posted
- Attached to
- REPLACE METER BASES & PANELS AT CAPEHART
- Solicitation number
- 140P8624R0007
About this file
This document is a Pre-Solicitation Announcement for Request for Proposal (RFP) No. 140P8624R0007 to Replace Meter Bases & Panels at Marin Headlands, Capehart, Golden Gate National Recreation Area (GOGA).
The National Park Service (NPS) at GOGA has a requirement to replace 28 dual meter enclosures, 3 single meter enclosures, 59 main panels, 31 risers and weather heads, and associated breakers. The project will also replace service entry wires for 31 buildings and 62 ground rods. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work. The RFP will be issued on or about 04/26/2024 with a 30-day response period. Award will be made on a Best Value determination considering price, experience, licensing, technical approach, management & safety, and past performance. This is a Service-Disabled Veteran-Owned Small Business set-aside with an estimated value between $500,000 and $1,000,000.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - WEST
1849 C Street
NW Washington, DC 20240
RFP No. 140P8624R0007
PRE-SOLICITATION ANNOUNCEMENT
Replace Meter Bases & Panels at Marin Headlands, Capehart, Golden Gate National Recreation Area (GOGA).
The National Park Service (NPS) at Golden Gate National Recreation Area (GOGA) has a requirement for the replacement of 28 dual meter enclosures, 3 single meter enclosures, 59 main panels, 31 risers and weather heads, and associated breakers. The project will also replace service entry wires for 31 buildings and 62 ground rods. All exterior panels and metal will be painted to match the existing. he project will also replace service entry wires for 31 buildings and 62 ground rods. All exterior panels and metal may be painted as an option item to match the existing. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation.
Contract work includes:
Contract Line Item No.1 –
Base: Remove and dispose of meter panels, service wire, riser, mast head, and associated conduit.
Replace with new meter panels (sizes and type in specifications), riser, mast head, service wire and associated conduit. Replace feeder wire from new meter panel to main panel with wire sized for new service. Replace main panels with new 200-amp panel and replace all breakers. Patch roof penetrations. Includes power disconnect and reconnect. Buildings included in this CLIN: 837 A&B, 833 A&B, 829 A&B, 825 A&B, 821 A&B, 809 A&B, 813 A&B, 801 A&B, 806, 807 A&B, 818 A&B, 811 A&B, 816 A&B, 815 A&B, 812 A&B, 810
Contract Line Item No.2 –
Bid Option 1: Paint new exterior components installed Under CLIN 1.
Contract Line Item No.3 –
Pre-Solicitation Announcement (140P8624R0007)
Bid Option 2: Remove and dispose of meter panels, service wire, riser, mast head, and associated conduit. Replace with new meter panels (sizes and type in specifications), riser, mast head, service wire and associated conduit. Replace feeder wire from new meter panel to main panel with wire sized for new service. Replace main panels with new 200-amp panel and replace all breakers. Patch roof penetrations. Includes power disconnect and reconnect. Buildings included in this Option: 838 A&B, 842 A&B, 846 A&B, 850 A&B, 854 A&B, 858 A&B, 862 A&B, 866 A&B, 870.
Contract Line Item No.4 –
Bid Option 3: Paint new exterior components installed Under Bid Option #2.
Contract Line Item No.5 –
Bid Option 4: Remove and dispose of meter panels, service wire, riser, mast head, and associated conduit. Replace with new meter panels (sizes and type in specifications), riser, mast head, service wire and associated conduit. Replace feeder wire from new meter panel to main panel with wire sized for new service. Replace main panels with new 200-amp panel and replace all breakers. .
Patch roof penetrations. Includes power disconnect and reconnect. Buildings included in this Option: 834 A&B, 832 A&B, 808 A&B, 804 A&B, 800 A&B, 805 A&B
Contract Line Item No.6 –
Bid Option 5: Paint new exterior components installed Under Bid Option #4.
All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work.
Per FAR 36.204 the project range is estimated to be between $500,000 and $1,000,000.
The North American Industry Classification System (NAICS) Code for this requirement is 238210, with a corresponding size standard of $19 million in annual gross receipts for the past three years.
This acquisition is a Service-Disabled Veteran-Owned Small Business set- aside. Offers are solicited only from Service-Disabled Veteran-Owned Small Business set- aside concerns. Offers received from concerns that are not Service-Disabled Veteran-Owned Small Business set- aside concerns shall not be considered.
The Request for Proposal (RFP) will be available on/about 04/26/2024, by electronic means only and can be downloaded along with all related attachments from the Contracting Opportunities website at www.sam.gov. The RFP will close 30 days from the actual date of issuance. The offeror is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFP.
The Government intends to award a single, firm-fixed-price contract. Evaluation for award will be made in accordance with the negotiated acquisition procedures outlined in FAR Part 15. Award selection will be made on a Best Value determination made after consideration of price and factors other than price (Experience, California Contractor License, Technical Approach & Schedule, Management & Safety, and Past Performance) as listed in Section M of the Request for Proposal.
Pre-Solicitation Announcement (140P8624R0007)
An organized site visit will be scheduled. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the RFP (when issued) for more information regarding the date, time, and location of the site visit.
File details come from the government source that posted it. Updated .