Sol_140P8624Q0015_Amd_0002.pdf
PDF 92 KB Posted
- Attached to
- RENOVATION OF VAULT TOILETS
- Solicitation number
- 140P8624Q0015
About this file
This document is an amendment (Amendment P0002) to a solicitation (Solicitation Number: 140P8624Q0015) for the renovation of vault toilets. The amendment provides answers to various questions related to the contract, including details on the type of windows to be used, availability of water and power at the toilet locations, and requirements for the California contractor's license. It confirms that the vault toilets will not be pumped prior to the work, but can be arranged if needed. The amendment also states that the contractor is not required to provide temporary restroom facilities during the work, as the park will post closure notices and provide rental facilities if necessary. The key details of the federal contract opportunity are the renovation of vault toilets for the Department of the Interior National Park Service Pacific West Region.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8624Q0015 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
03/20/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/11/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment P0002 is to answer questions.
Question 1. Will all toilet vault locations be pumped/cleaned of waste before we begin?
Answer Question 1. No, but they are able to be pumped upon request if one is in need of pumping.
Question 2. What type of windows are we using to replace the existing? Plexiglass, or glass? If glass, is it safety glass with the embedded wire?
Answer Question 2. They are to match the existing windows, which is pebble finish poly carbonate sheet.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Patty Payne
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8624Q0015/0002
Question 3. For pressure washing, is there water available at each location? Or will water need to be brought in?
Answer Question 3. The toilets are located in remote locations, with no water located on site.
Water will need to be brought in.
Question 4. Is there power available at each location?
Answer Question 4. The toilets are located in remote locations, with no electricity on site. If electricity is needed, it will need to be brought in.
Question 5. Will we be able to access water from the fire hydrants or have access to water for the cleaning of the toilets?
Answer Question 5. The locations are remote, and most do not have fire hydrants near them. No water will be accessible on any of the sites, contractors should plan to provide their own water.
Question 6. Regarding the California contractor's license requirement, will a Class A general license be acceptable?
Answer Question 6. Yes, a class A California license is acceptable.
Question 7. Will the vault toilets be pumped prior to us doing our work or is that the responsibility of the contractor?
Answer Question 7. They will not be pumped, but if one is particularly bad, we can arrange pumping.
Question 8. Will the contractor need to provide temp facilities while work is being done at each location? Each restroom might be down for a couple of days and during the summer months there could be a lot of people visiting these locations.
Answer Question 8. This is not included in the contract. For all closures, we will be posting closure notices at trailheads and near the toilets ahead of closure. For busy trails the park may provide rental facilities if necessary.
Question 9. On the door louvers for the vault toilets doors that are to be replaced at Muir
Beach would .040 thick extruded aluminum frames
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8624Q0015/0002 and blades be an acceptable product to use, or does it need to meet the .063 thickness as stated in the specifications, if so did the government have a specific product in mind or could you please provide information on the existing doors that are currently in place?
Answer Question 9. 0.04 thick extruded frames and blades is acceptable.
All other terms and conditions apply.
Contracting Officer: Patty Payne Phone:
559-730-6435 Email: patty_payne@nps.gov
COR: Amy Wilson Phone: 415-547-9718 Email:
amy_wilson@nps.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .