About this file
This is Amendment 0001 to a Request for Quotation (RFQ) for industrial batteries, issued by the National Park Service, Power Management office located in San Francisco, California. The amendment's effective date is April 7, 2026, and the RFQ closing date and time remain unchanged. The solicitation number is 140P8526Q0039.
The amendment responds to contractor questions regarding the battery specifications and requirements. The Government clarifies that it requires individual replacement Absolutyte GP batteries only, with no additional hardware, assemblies, or full system components such as racks, cabinets, interconnect hardware, monitoring systems, or battery management systems. Two battery types are specified: model 024AGP 05007WL V0 19RRK (24 batteries) with 1.9 final volts per cell and 6.8 amp-hours capacity, and model 024AGP 05013WL V0 19RRK (24 batteries) with 1.9 final volts per cell and 13 amp-hours capacity. The manufacturer is identified as GNB Industrial Power. Contractors must acknowledge receipt of this amendment prior to the RFQ deadline by either completing and returning the amendment form, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication that references the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| YOSE_Purchase_CDN_Absolyte_Batteries_SOW.pdf | ||
| Sol_140P8526Q0039.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jara Woodard
See continuation page
NPS, PWR - SF/SEA MABO
333 Bush Street Suite 500 San Francisco CA 94104
PPO
140P8526Q0039
04/07/2026
04/01/2026
1 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P8526Q0039/0001
140P8526Q0039 Amendment 0001 is hereby issued to 1) Answer Government received contractor
Request for Information, see below Questions &
Answers. 2) The RFQ closing date and time remains the same.
Question #1. Are these items required as individual replacement batteries only (i.e., 24 separate battery cells)?
Answer #1 See question #3 for response.
Question #2. Or are they required as complete new battery systems/assemblies (e.g., battery packs, cabinets, connection harnesses, trays, wiring, etc.)?
Answer #2. See question #3 for response.
Question #3. If a full new system is required, can you specify what additional components are included or expected (e.g., rack/cabinet, interconnect hardware, monitoring, BMS, etc.)?
Answer for 1-3: Abosolyte GP, individual replacements, we only need the batteries, no additional hardware/assemblies. Full new system is not required.
Question #4. Please clarify the exact voltage and total capacity (Ah) requirement for each item.
024AGP 05007WL V0 19RRK (24 batteries)
Answer #4 1.9 Final Volts per Cell 6.8 AH
024AGP 05013WL V0 19RRK (24 batteries)
Answer #4 1.9 Final Volts per Cell 13 AH
Question #5. If possible, please provide the manufacturer name, datasheet, or technical specification reference for these parts.
Answer #5: Manufacture name is GNB Industrial
Power
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .