B08_Att_5_Question_Responses_0001.pdf
PDF 104 KB Posted
- Attached to
- OCEAN BEACH SAND MANAGEMENT Federal contract opportunity
- Solicitation number
- 140P8525Q0020
About this file
This document is an attachment containing questions and responses for Solicitation 140P8525Q0020 for Sand Management at Ocean Beach. The file addresses four key clarification points from potential bidders, including confirmation that no bid bonds are required for the solicitation. The National Park Service (NPS) clarifies that while they do not require equipment to be run with natural oils, contractors must provide a spill containment plan per section 11.2 of the Performance Work Statement. The solicitation involves sand management work at stairwells 15-28, with a base bid for stairwells 15-22 to push sand out to 450 feet, and two optional bids for stairwells 23-28 - one to push sand 300 feet and another to push sand 450 feet. NPS will not provide any government-furnished equipment for this project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Att_6_Site_Visit_Sign_In_Sheet_0001.pdf | ||
| Sol_140P8525Q0020_Amd_0001.pdf | ||
| B08_Att_1_OB_Sand_Management_PWS.pdf | ||
| B08_Att_3_SCA_WD_2015-5637_Rev__28.pdf | ||
| B08_Att_2_Drawings_Maps_Figures.pdf | ||
| Sol_140P8525Q0020.pdf | ||
| B08_Att_4_Experience_and_PP_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 Solicitation 140P8525Q0020 – Sand Management Ocean Beach
1. Am I understanding right that there's no bid bond requirement for this project?
a. No Bonds are required for this solicitation.
2. Does NPS want to see an optional cost for a hydraulic oil alternative (vegetable oil vs hydraulic oil)?
a. The NPS does not require equipment to be run with natural oils but does require a spill containment plan in accordance with section 11.2 of the Performance Work Statement (PWS).
3. Does NPS have a Schedule of Items they could provide?
a. We are not providing any Government Furnished Equipment as part of this requirement.
4. Please also confirm the two option items are staircases 15-22 and 23-28.
a. In section 2 and section 14 of the Project Work Statement it describes the base bid for stairwells 15 to 22 to push sand out to 450 ft, with two options for pushing sand at stairwells 23 to 28 at 300ft (bid option 1) and to 450ft (bid option 2).