B08_Attachment_2_PINN_331043_Drawings.pdf
PDF 12 MB Posted
- Attached to
- Rehab Bear Valley School Foundation, NPS-PINN
- Solicitation number
- 140P8426R0001
About this file
This document is a comprehensive set of structural design drawings and specifications for Phase 1 rehabilitation of Bear Valley School located within Pinnacles National Park in San Benito County, California. The project is under the jurisdiction of the National Park Service Pacific West Region and is assigned PMIS number 331043.
Phase 1 structural work includes construction of a modern, code-compliant foundation utilizing contracted construction services, reconstruction of the porch floor to address deterioration and facilitate future change of occupancy, and seismic retrofits. The design is based on the 2024 International Building Code and 2024 International Existing Building Code (Alteration Level 2 per IEBC §604), with the building classified as Group A-3 occupancy for assembly purposes with occupant load less than 49 persons. Key design parameters include: Risk Category II; USGS elevation 1,285 feet; basic design wind speed of 92 mph; seismic design category E with spectral response acceleration parameters SS=2.06g and S1=0.77g; soils site class CD; and maximum allowable bearing pressure of 2,500 PSF static and 3,325 PSF short-term. Foundation work specifies reinforced concrete footings with 18-inch to 24-inch minimum widths bearing on 12 inches of compacted engineered fill below minimum 1-foot embedment depth. Structural wood framing requires Douglas Fir-Larch No. 2 or better dimensional lumber and No. 1 or better solid timber members, all pressure-treated where exposed to weather or in contact with concrete or masonry, with all fasteners and connectors meeting corrosion-resistant requirements. The drawings include detailed foundation and floor framing plans, shear wall elevations, typical details, foundation sections, and reinforcing schedules with concrete mix specifications for 4,500 PSI footings and 5,000 PSI slab-on-grade applications. Special inspections are required in accordance with IBC Chapter 17 for soils, concrete construction, reinforcing steel, and designated seismic systems.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEAR VALLEY SCHOOL, CA. 1905 (PROVIDED BY NPS)
BEAR VALLEY SCHOOL, 2025 (ANDERSON HALLAS ARCHITECTS)
PACIFIC WEST
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
OF
SHEET
DEPARTMENT OF THE INTERIOR
UNITED STATES
STATEREGION COUNTY
LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING DRAWING NO.
PMIS/PKG NO.
QUALITY DESIGN CERTIFICATION
Prepared in Accordance with design Development (Title I)
Drawing No.
Variance from Design Development (Title I) Approved by Superintendent on
Date
OR
Construction Drawing Not Preceded by Design Development (Title I)
OR
Project Manager Date
InitialDateREVISIONSheetMark
BEAR VALLEY SCHOOL
PINNACLES NATIONAL PARK
CAPACIFIC WEST SAN BENITO
100% CD
CALIFORNIA
ANDERSON HALLAS ARCHITECTS, PC
STRUCTURAL:
JVA CONSULTING ENGINEERS
BOULDER, CO
80302
CIVIL:
OTAK
PORTLAND, OR
97204
PRIME / ARCH:
ANDERSON HALLAS, PC
GOLDEN, CO
80401
140P2021D0014
PMIS
1/1 6/2
6 8
:21 :43
A M
Au tod es k D oc s:/
/20
-2
P
IN
N Be ar V all ey
S ch oo l R eh ab
/20
0-
NP
S
PI
NN
B ea r V all ey S ch oo l-v
-B
IM
0.r vt
BEAR VALLEY SCHOOL REHABILITATION
1 12
331043
XXX
XXXXX
331043
PINNACLES NATIONAL PARK
BEAR VALLEY SCHOOL REHABILITATION PHASE 1
PROJECT LOCATION
PINNACLES NATIONAL PARK
PROJECT LOCATION
BEAR VALLEY SCHOOL AT
PINNACLES NATIONAL PARK
BEAR VALLEY SCHOOL
CA-25
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE CONTRACT DOCUMENTS, VERIFYING FIELD CONDITIONS AND DIMENSIONS, AND CONFIRMING THAT THE WORK MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION. CONTRACTOR SHALL NOTIFY C.O.
IN WRITING OF ANY DISCREPANCY WITHIN THE CONTRACT DOCUMENTS AND REQUEST CLARIFICATION PRIOR
TO PROCEEDING WITH CONSTRUCTION.
SHOULD THERE BE ANY QUESTIONS CONCERNING THE CONTRACT DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM
THE C.O. PRIOR TO PROCEEDING WITH THE WORK, OR RELATED WORK IN QUESTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH THE PROJECT SCOPE OF WORK, SCHEDULE, AND DEADLINES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADVISING THE C.O. OF ALL ITEMS REQUIRING A LONG LEAD TIME UPON NOTICE TO PROCEED THAT WILL AFFECT THE SCHEDULE.
ORDER CONFIRMATIONS AND DELIVERY DATES FOR THE ITEMS IN QUESTION SHALL BE INCLUDED IN THE
CONSTRUCTION SCHEDULE AND SUBMITTED TO THE C.O.
ALL WORK TO BE PERFORMED TO APPLICABLE BUILDING CODES (SEE CODE SUMMARY THIS SHEET FOR LIST
OF APPLICABLE CODES).
DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.
THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LAYOUT AND COORDINATION OF DIMENSIONS IN
THE FIELD THAT ESTABLISH WORK POINTS FOR THEIR WORK AND VARIOUS TRADES.
“ALIGN” AS USED IN THESE DOCUMENTS SHALL MEAN TO ACCURATELY LOCATE FINISHED FACES IN THE SAME
PLANE.
DIMENSIONS ARE TO FACE OF <N> STUD WHERE INTERFACING WITH <N> FRAMING AND TO FACE OF FINISH
WHERE INTERFACING WITH <E> WALLS, UON.
TYPICAL (TYP) OR SIMILAR (SIM) NOTATION USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITIONS ARE THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS, UNLESS NOTED OTHERWISE. ACTUAL CONDITIONS MAY VARY, BUT DO NOT REVOKE THE INTENT OF THE CONFIGURATION INDICATED. DETAILS ARE USUALLY KEYED AND NOTED “TYPICAL” OR “SIMILAR” ONLY ONCE WITH THE FIRST OCCURRENCE AND ARE
REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, UNLESS NOTED OTHERWISE.
INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER’S RECOMMENDED SPECIFICATIONS, EXCEPT WHERE THE CONTRACT DOCUMENTS ARE
MORE STRINGENT.
ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED BUT REQUIRED FOR PROPER
INSTALLATION SHALL BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR.
THE CONTRACTOR SHALL FURNISH TO THE C.O. ALL WARRANTIES AND GUARANTEES REQUIRED AT THE
CONCLUSION OF THE PROJECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HOOK UPS / UTILITY CONNECTIONS, ETC. TO TEMPORARY
TRAILERS.
IF DISCREPANCIES OCCUR BETWEEN DRAWINGS OR BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, NOTIFY THE C.O. FOR RESOLUTION.
THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF DEBRIS. THE CONTRACTOR IS RESPONSIBLE
FOR ALL PHASES OF SECURING, HANDLING, TRANSPORTING AND DISPOSING OF DEBRIS.
THE CONTRACTOR SHALL NOT SHUT OFF OR INTERRUPT ANY SYSTEMS OR SERVICES WITHOUT FIRST
COORDINATING WITH THE C.O.
THE CONTRACTOR SHALL COORDINATE WITH THE C.O. TO IDENTIFY AND PROTECT EXISTING STRUCTURE, SYSTEMS, UTILITIES, SURFACES AND FINISHES WHICH ARE TO REMAIN. ALL SYSTEMS DAMAGED DURING
CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT THEIR EXPENSE.
DELIVERY AND STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT (STAGING AREAS) IS TO BE
COORDINATED WITH THE C.O.
PROVIDE ELECTROLYTIC PROTECTION / ISOLATION BETWEEN ALL DISSIMILAR METALS, WHERE THEY OCCUR
TO PREVENT ELECTROLYTIC REACTION AND/OR CORROSION.
ALL <N> WOOD MEMBERS IN DIRECT CONTACT WITH CONCRETE, MASONRY, OR EARTH SHALL BE PRESSURE
TREATED TO PREVENT MOISTURE WICKING AND TO RESIST DECAY.
GENERAL NOTES
ROOM
250 SF
A#.#
FIRST FLOOR
100'-0"
KEY NOTE
ELEVATION MARK NORTH ARROW
BUILDING
SECTION MARK
ROOM
TAG
SYMBOLS
BLD
G.
NORTH
BUILDING
NORTH ARROW
A2??
1 A4??
ELEVATION VIEW MARK
GRID MARK
X
CODE ANALYSIS
REFER TO INDIVIDUAL DISCIPLINE SHEETS FOR ADDITIONAL CODE INFORMATION
PROJECT NAME: REHABILITATE BEAR VALLEY SCHOOL
ADDRESS: SAN BENITO COUNTY, CA 95403
AHJ: PINNACLES NATIONAL PARK
STRUCTURAL FIRE AHJ: NATIONAL PARK SERVICE, PACIFIC WEST REGION
CLIMATE ZONE: 3C WARM MARINE PER 2024 IECC (EXEMPT FROM IECC PER BELOW)
SCOPE OF WORK
BEAR VALLEY SCHOOL REHABILITATION INCLUDES SELECT STRUCTURAL MODIFICATIONS IN ADVANCE OF A FUTURE CHANGE OF OCCUPANCY WITHOUT A CHANGE IN RISK CATEGORY. PHASE 1 WORK INCLUDES THE FOLLOWING:
CONSTRUCTION OF A MODERN, CODE-COMPLIANT FOUNDATION UTILIZING CONTRACTED CONSTRUCTION
SERVICES
RECONSTRUCTION OF PORCH FLOOR TO ADDRESS DETERORIATION AND FUTURE CHANGE OF OCCUPANCY
SEISMIC RETROFITS
APPLICABLE CODES AND STANDARDS
2024 INTERNATIONAL BUILDING CODE (IBC)
2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2024 INTERNATIONAL WILDLAND-URBAN INTERFACE CODE (IWUIC)
REFER TO OTHER DISCIPLINES FOR ADDITIONAL APPLICABLE CODES
NATIONAL PARK SERVICE MANAGEMENT POLICIES, 2006
THE SECRETARY OF THE INTERIOR’S STANDARDS AND GUIDELINES FOR THE TREATMENT OF HISTORIC PROPERTIES
DIRECTOR’S ORDER 50B: OCCUPATIONAL SAFETY AND HEALTH PROGRAM
DIRECTOR’S ORDER 58: STRUCTURAL FIRE MANAGEMENT
DENVER SERVICE CENTER REQUIREMENTS
NFPA 101 (LIFE SAFETY CODE) – USE WHEN THE IBC IS SILENT
LOCATION-SPECIFIC STRUCTURAL LOAD DESIGN (SNOW AND WIND LOADS)
BEAR VALLEY SCHOOL IS CURRENTLY UNCONDITIONED. PER IECC §C402.1.1.1, BUILDINGS THAT DO NOT CONTAIN
CONDITIONED SPACES SHALL BE EXEMPT FROM BUILDING THERMAL ENVELOPE PROVISIONS.
ALTERATION LEVEL
ALTERATION LEVEL 2 PER IEBC §604
ALL <N> CONSTRUCTION TO COMPLY WITH IBC
EXCEPTIONS:
PER IEBC §801.4 THE MINIMUM CEILING HEIGHT OF THE NEWLY CREATED HABITABLE AND OCCUPIABLE SPACES AND
CORRIDORS SHALL BE 7 FEET.
USE & OCCUPANCY CLASSIFICATION
BEAR VALLEY SCHOOL OPERATED AS A SCHOOLHOUSE UNTIL 1950, AFTER WHICH IT REMAINED OPEN AS A COMMUNITY HALL UNTIL IT WAS BOARDED UP IN 2002 AND IS CURRENTLY UNOCCUPIED. CODE UPGRADES FOR THE CHANGE OF USE TO A COMMUNITY HALL LIKELY DID NOT OCCUR. THE SCOPE OF THIS PROJECT ANTICIPATES FUTURE LIMITED PUBLIC USE CLASSIFIED BY GROUP A-3 OCCUPANCY FOR ASSEMBLY PURPOSES WITH AN OCCUPANT LOAD OF LESS THAN 49 PERSONS WITH SIGNAGE POSTED. PER IEBC §1205.1, THE CODE OFFICIAL SHALL BE AUTHORIZED TO ACCEPT EXISTING FLOOR AND PREVIOUSLY APPROVED LIVE LOADS AND ROOF LIVE LOADS AND TO APPROVE
OPERATIONAL CONTROLS THAT LIMIT THE LIVE LOAD OR ROOF LIVE LOAD.
TYPES OF CONSTRUCTION
CONSTRUCTION CLASSIFICATION: TYPE V-B PER IBC §602.5
PROPOSED WORK DOES NOT MODIFY BUILDING HEIGHT OR NUMBER OF STORIES
MEANS OF EGRESS
MINIMUM 80" HEADROOM OVER ANY WALKING SURFACE PER IBC §1003.3.1
MINIMUM 4" AND MAXIMUM 7" RISER HEIGHT AT <N> EXTERIOR STEP PER IBC §1011.5.2
NO HANDRAIL REQUIRED AT <N> EXTERIOR STEP PER IBC §1011.11
DESIGN OCCUPANT LOAD PER IBC TABLE 1004.5
FUNCTION OF SPACE ASSEMBLY UNCONCENTRATED
OCCUPANT LOAD FACTOR 15 SF NET
BUILDING FLOOR AREA 827 SF NET
56 OCCUPANTS*
*SIGNAGE TO BE POSTED LIMITING OCCUPANCY TO 49 PERSONS OR LESS. PER IBC
TABLE 1006.2.1 ONE EXIT IS ALLOWED.
CRAWL SPACE ACCESS AND VENTILATION
PER IBC §1202.4.1.2 THE NET AREA OF VENTILATION OPENINGS FOR CRAWL SPACES WITH GROUND SURFACE COVERED WITH A CLASS I VAPOR RETARDER SHALL NOT BE LESS THAN 1 SQUARE FOOT FOR EACH 1500 SF OF CRAWL
SPACE AREA.
COMBINED CRAWL SPACE AREA = 1000 SF +/-
REQUIRED VENTILATION NET AREA = .67 SF
PROVIDED:
VENTILATION NET AREA = .17 SF X 4 VENTS = .67 SF
PER IBC §1209.1 CRAWL SPACES SHALL BE PROVIDED WITH NOT LESS THAN ONE ACCESS OPENING THAT SHALL NOT
BE LESS THAN 18 INCHES BY 24 INCHES.
PROVIDED:
PORCH CRAWL SPACE = (1) 18 INCHES BY 24 INCHES IN PORCH FLOOR
SCHOOLROOM CRAWL SPACE = (2) 18 INCHES BY 24 INCHES IN FOUNDATION WALL
VENTILATION OPENINGS SHALL NOT EXCEED 144 SQUARE INCHES EACH. SUCH VENTS SHALL BE COVERED WITH NONCOMBUSTIBLE CORROSION-RESISTANT MESH WITH OPENINGS NOT TO EXCEED 1/8 INCH OR SHALL BE DESIGNED
AND APPROVED TO PREVENT FLAME OR EMBER PENETRATION INTO THE STRUCTURE.
TRAVEL DISTANCE:
40' - 8
MAX ALLOWED 75' - 0
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF1/1
6/2
6 1
:26 :52
P M
Au tod es k D oc s:/
/20
-2
P
IN
N Be ar V all ey
S ch oo l R eh ab
/20
0-
NP
S
PI
NN
B ea r V all ey S ch oo l-v
-B
IM
0.r vt
G001.1
CR/MS
BEAR VALLEY SCHOOL REHABILITATION
PINNACLES NATIONAL PARK
XXX
XXXXX
331043
MS
CR/EH/WS
1/16/2026 2 12
GENERAL NOTES AND
INDEX - PHASE 1
GENERAL ABBREVIATIONS
SHEET INDEX - PHASE 1
SHEET SUB SHEET TITLE OF SHEET
GENERAL
1 G000.1 COVER SHEET - PHASE 1
2 G001.1 GENERAL NOTES AND INDEX - PHASE 1
CIVIL
3 C100.1 TESC PLAN - PHASE 1
ARCHITECTURAL
4 A100.1 PLAN AND ELEVATIONS - PHASE 1
5 A600.1 DETAILS - PHASE 1
STRUCTURAL
6 S001.1 STRUCTURAL GENERAL NOTES - PHASE 1
7 S002.1 STRUCTURAL GENERAL NOTES - PHASE 1
8 S003.1 STRUCTURAL ABBREVIATIONS & SYMBOLS & 3D VIEW - PHASE 1
9 S101.1 FOUNDATION & FLOOR FRAMING PLAN - PHASE 1
10 S401.1 SHEAR WALL ELEVATIONS - PHASE 1
11 S501.1 TYPICAL DETAILS - PHASE 1
12 S511.1 FOUNDATION SECTIONS - PHASE 1
# POUND(S) or NUMBER
& AND
(S) SEALANT
(T) TEMPERED
< ANGLE
<E> EXISTING
<N> NEW
@ AT
A/V AUDIO VISUAL
ABAAS ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS
ABV ABOVE
ACM ASBESTOS CONTAINING MATERIAL
ACT ACOUSTICAL CEILING TILE
ADD ADDENDUM
ADJ ADJACENT or ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
APPROX APPROXIMATE(LY)
ARCH ARCHITECTURAL
ASPH ASPHALT
BC BASE CABINET
BLDG BUILDING
BLKG BLOCKING
BO BOTTOM OF
BR BACKER ROD
BTWN BETWEEN
C.O. CONTRACTING OFFICER
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTBB CEMENTITIOUS TILE BACKER BOARD
CTR CENTER
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DIAM DIAMETER
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
E EAST
EA EACH
EG FOR EXAMPLE
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQP EQUIPMENT
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH(ED)
FIXT FIXTURE
FLR FLOOR(ING)
FO FACE OF
FP FIRE PROTECTION
FRP FIBERGLASS REINFORCED PANEL(ING)
FT FEET
FTG FOOTING
FURR FURRING
GA GAUGE OR GYPSUM ASSOCIATION
GALV GALVANIZED
GC GENERAL CONTRACTOR
GD GRADE
GL GLASS or GLAZING
GND GROUND
GRT GROUT
GWB GYPSUM WALLBOARD
HAZMAT HAZARDOUS MATERIAL
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HPTC HISTORIC PRESERVATION TRAINING
CENTER
HT HEIGHT
HVAC HEATING, VENTILATION and AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
INCL INCLUDING
INFO INFORMATION
INS INSULATION or INSULATED
INT INTERIOR
JT JOINT
LAV LAVATORY
LIN LINOLEUM
LS LANDSCAPE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL and PLUMBING
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OTE OPEN TO EXISTING
OTS OPEN TO STRUCTURE
OVH OVERHANG
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PT PRESSURE TREATED
PTD PAINTED
PWD PLYWOOD
QT QUARRY TILE
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFER TO or REFERENCE
REINF REINFORCED
RELOC RELOCATED
REQ REQUIRED
REV REVISE, REVISED or REVISION
RM ROOM
RO ROUGH OPENING
RR RESTROOM(S)
RS ROUGH SAWN
S SOUTH
SCHED SCHEDULE
SF SQUARE FEET
SHTG SHEATHING
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STN STAIN
STRUCT STRUCTURE or STRUCTURAL
T&G TONGUE AND GROOVE
T.O. TOP OF
TD THRESHOLD
TYP TYPICAL
UC UPPER CABINET
UON UNLESS OTHERWISE NOTED
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VIN VINYL
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WIN WINDOW
WRB WEATHER-RESISTIVE BARRIER
RESOURCE DATA
BEAR VALLEY SCHOOL, ALSO KNOWN AS “BEAR VALLEY HALL,” WAS COMPLETED IN 1903 TO REPLACE A SCHOOLHOUSE IN APPROXIMATELY THE SAME LOCATION. IT WAS AN ACTIVE RURAL SCHOOL UNTIL JUNE 1950, AFTER WHICH IT SERVED AS A COMMUNITY HALL UNTIL 2002 WHEN IT WAS SHUTTERED. OWNERSHIP OF THE PROPERTY WAS CONVEYED TO THE NPS IN 2011 AND IT WAS LISTED IN THE NATIONAL REGISTER OF HISTORIC PLACES IN 2014. ITS PERIOD OF SIGNIFICANCE IS UNDERSTOOD TO BE 1902–1950.
CHARACTER DEFINING FEATURES INCLUDE:
SITE NEAR CENTER OF PARCEL IN A GROVE OF MATURE VALLEY OAKS
EAST-WEST ORIENTATION
RECTANGULAR ONE-STORY FORM WITH CENTRAL SCHOOLROOM AND HALF-HEIGHT OPEN PORCH
WITH COATROOMS AT THE NORTH AND SOUTH SIDES
MODERATELY PITCHED FRONT-GABLED ROOF WITH SHALLOW OVERHANGS AND HIPPED ROOF PORCH
DOUBLE-HUNG, FOUR-OVER-FOUR WOOD WINDOWS
FOUR-PANELED WOOD ENTRY DOORS
INTERIOR MILLWORK AND FINISHES INCLUDING EXTANT ORIGINAL HARDWOOD FLOORING
INTERIOR FEATURES RELATED TO THE BUILDING'S USE AS A SCHOOL INCLUDING A DECORATIVE BRASS PLATE AT THE WEST SCHOOLROOM CEILING THAT ONCE ADMITTED THE BELFRY CORD AND
CHALKBOARDS FROM THE PERIOD OF SIGNIFICANCE
THE SCOPE OF PHASE 1 WORK
ANTICIPATES NO OCCUPANCY OR USE
OF THE BUILDING UNTIL PHASE 2 WORK
IS COMPLETE. SIGNAGE SHALL BE
POSTED TO INDICATE THIS
RESTRICTION OF USE.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
BEAR VALLEY SCHOOL REHABILITATION
PINNACLES NATIONAL PARK
XXX
XXXXX
331043
LIC
EN
SE
D PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC IV IL
KY
LE
DAVID CHILDER
S68843
TESC PLAN - PHASE 1
C100.1
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
<N> FOUNDATION AND GRADE SHOWN FOR REFERENCE ONLY. REFER TO OTHER DISCIPLINES FOR EXTENT OF
FOUNDATION WORK AND ADDITIONAL SCOPE.
FFE 100'-0" = 1286.55' USGS. CONTRACTOR TO VERIFY IN FIELD.
ALL EXISTING ELEMENTS ARE SHOWN BASED ON AVAILABLE INFORMATION AND NON-DESTRUCTIVE FIELD OBSERVATION. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONSTRUCTION AND NOTIFY C.O. OF ANY
DISCREPANCY BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS AND REQUEST
CLARIFICATION PRIOR TO PROCEEDING WITH CONSTRUCTION.
DRAWINGS SEEK TO REPRESENT THE SCOPE AND RANGE OF WORK REQUIRED BUT ARE NOT INTENDED TO BE INCLUSIVE OF ALL NECESSARY WORK. DIMENSIONS SHOWN ARE APPROXIMATE. VERIFY IN FIELD TO ACHIEVE
<N> WORK.
VERIFY DIMENSIONS OF ALL <E> CONSTRUCTION IN FIELD. EXPECT THAT EXISTING BUILDING ELEMENTS MAY
NOT BE PLUMB, LEVEL OR SQUARE.
ALL REMOVAL AND DEMO ACTIVITIES SHALL BE EXECUTED IN A MANNER WHICH PROTECTS ALL UNDERLYING
AND ADJACENT HISTORIC MATERIALS. PROTECT IN PLACE ALL ELEMENTS <E> TO REMAIN.
WHERE WORK REQUIRES REMOVAL OF HISTORIC ELEMENTS/MATERIALS NOT INDICATED IN CONTRACT DOCUMENTS FOR REMOVAL, STOP WORK AND CONFIRM WITH C.O. FOR APPROVAL TO REMOVE ADDITIONAL
MATERIALS.
UNLESS OTHERWISE NOTED, <E> ELEMENTS REMOVED ARE TO BE CATALOGUED AND INSPECTED FOR REHABILITATION OR REPLACEMENT IN KIND AND REINSTALLED IN CURRENT LOCATION AND CONFIGURATION BY HPTC IN PHASE 2. PARK TO PROVIDE TEMPORARY, SECURE, WEATHERPROOF STORAGE UNTIL
REINSTALLATION.
COORDINATE ALL DEMO WORK WITH HAZARDOUS ABATEMENT, RE: SPECIFICATIONS AND HAZARDOUS MATERIALS REPORT FOR KNOWN HAZARDOUS MATERIALS AND REMOVAL REQUIREMENTS. CONTAMINATION DUE TO ANIMAL INFESTATION, LEAD-CONTAINING PAINT, AND LEAD-BASED PAINT IDENTIFIED THROUGHOUT WORK AREA. STOP WORK AND NOTIFY C.O. IF ANY ADDITIONAL SUSPECTED HAZARDOUS MATERIAL IS FOUND
DURING WORK.
NO SHTG EXISTS AT EXT WALLS. <N> SHTG AND BASE FLASHING TO BE INSTALLED IN PHASE 2, UON.
A600.1
A600.1
43'-4"+/-
4'-0" +/-
4'- 0"
02.08
02.04
02.11
02.11
02.05
02.21
02.21
02.19
02.19
827 SF+/-
SCHOOLROOM
134 SF+/-
PORCH
22 SF+/-
RR
22 SF+/-
RR
02.20
02.20
7'-1 3/4" +/-
'-8
08.0208.02
02.28 08.02 08.02
08.03
02.29
02.29
02.27
4'- 3 1
/8"
08.04
02.30
100'-0"99'-6 1/4"100'-0"
02.04
A100.1
CTR CRAWL SPACE VENT
CTR CRAWL SPACE VENTCTR CRAWL SPACE VENT
CTR CRAWL SPACE VENT
'-2
03.03
5'-0"
7'- 8 3
/4"
99'-5"
BEYOND
ABOVE ABOVE
ABOVE ABOVE
4'- 6 7
/8"
CL
CL 08.04
BEYOND
4'- 5 1
/2"
A600.1
24"
'-5
11'-2" +/-
'-2
3/ 8"
6'- 7 3
/4"
2'- 9"
<N> PORCH FFE
<E> SCHOOLROOM FFE
CL CL
CL CL
A100.1
LEGEND
<E> TO BE REMOVED UON
<E> TO REMAIN, PROTECT IN PLACE UON
<N> CONSTRUCTION
SALVAGE <E> 1X PORCH FLOOR FINISH TO ACCOMMODATE
PORCH FLOOR RECONSTRUCTION. FINISH TO BE
REHABILITATED AND REINSTALLED IN PHASE 2.
REMOVE <E> WD ELEMENTS AS REQUIRED TO ACCOMODATE
STRUCTURAL WORK AND REINSTALL
<N> CONCRETE ELEMENTS, RE: STRUCT
PROVIDE <N> EXPANSION JOINT AND JOINT SEALANT
EXISTING SCHOOLROOM
FLOOR/NEW PORCH
FLOOR
100'-0"
A B C
CL
02.19
02.08
02.04
02.20
02.28
CL
08.02 08.02
03.03
6" M
IN
42 1
05.01
02.08
02.04
RE: STRUCTRE
: S
TR
UC
T
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
1/1 6/2
6 1
1:1 5:1
6 A M
Au tod es k D oc s:/
/20
-2
P
IN
N Be ar V all ey
S ch oo l R eh ab
/20
0-
NP
S
PI
NN
B ea r V all ey S ch oo l-v
-B
IM
0.r vt
A100.1
CR/MS
BEAR VALLEY SCHOOL REHABILITATION
PINNACLES NATIONAL PARK
XXX
XXXXX
331043
MS
CR/EH/WS
1/16/2026 4 12
PLAN AND
ELEVATIONS - PHASE 1
B
LD
G
N O
R T
H
40 84
SCALE OF FEET
KEYNOTES
02.04 <E> TO REMAIN CONCRETE ELEMENTS AT BUILDING REAR, PROTECT
IN PLACE
02.05 REMOVE <E> CONCRETE STEP
02.08 <E> TO REMAIN TREE, PROTECT IN PLACE
02.11 REMOVE <E> FIXTURE AND ASSOCIATED PLUMBING
02.19 REMOVE <E> VENT PIPE TO CEILING LEVEL AND CAP, ROOF TO BE
REPLACED IN PHASE 2
02.20 REMOVE AND SALVAGE <E> HOSE BIBB AND ASSOCIATED PLUMBING,
REINSTALL IN <E> LOCATION
02.21 REMOVE <E> DOOR, DOOR TRIM, AND THRESHOLD TO
ACCOMMODATE PORCH FLOOR RECONSTRUCTION, SALVAGE FOR
REHABILITATION AND REINSTALLATION IN PHASE 2
02.27 REMOVE <E> SEWER LINE, RE: CIVIL FOR FULL EXTENT
02.28 REMOVE <E> ELECTRICAL COMPONENTS, PROVIDE TEMPORARY
WATERTIGHT WOOD PATCH AT ALL PENETRATIONS
02.29 REMOVE <E> DOOR TRIM AND THRESHOLD TO ACCOMMODATE
PORCH FLOOR RECONSTRUCTION, SALVAGE FOR REHABILITATION
AND REINSTALLATION IN PHASE 2
02.30 MODIFY <E> DOOR AND TRIM TO ACCOMMODATE PORCH FLOOR
RECONSTRUCTION
03.03 <N> SLAB ON GRADE, RE: STRUCT FOR CONC DETAILS
05.01 <N> MTL SCREEN PER IWUIC, FIT TO OPENING
08.02 <N> 4"X14" GALV STL VENT IN FOUNDATION, ALIGN CENTER WITH
WINDOW OPENING ABOVE, RE: STRUCT FOR ADDITIONAL DETAILS
08.03 <N> CRAWL SPACE ACCESS IN FLOOR, MIN 18"X24", RE: STRUCT FOR
ADDITIONAL DETAILS
08.04 <N> ACCESS OPENING IN FOUNDATION BELOW, MIN 18"X24", RE:
STRUCT FOR ADDITIONAL DETAILS
SCALEA100.1
PLAN1
A
SCALEA100.1
SOUTH ELEVATION2
A
FRONT FACADE
(ANDERSON HALLAS ARCHITECTS, 2024)
REAR FACADE
(ANDERSON HALLAS ARCHITECTS, 2024)
<E> CONC STEP TO BE
REMOVED, RE: KN 02.05
MODIFY <E> VENTS TO
FACILITATE FOUNDATION
WORK, RE: KN 02.19
<E> CONC ELEMENTS TO
BE PROTECTED IN PLACE,
RE: KN 02.04
<E> TREE TO BE
PROTECTED IN PLACE, RE:
KN 02.08
<E> HOSE BIBB TO BE
SALVAGED AND
REINSTALLED IN PLACE,
RE: KN 02.20
<E> FOUNDATION TO BE
REMOVED, RE: STRUCT
SCALEA100.1
EAST ELEVATION3
A
EXISTING SCHOOLROOM
FLOOR/NEW PORCH
FLOOR
100'-0"
<E> TO REMAIN TREE,
PROTECT IN PLACE
SLOPE GRADE AWAY FROM <N> FOUNDATION
RE: STRUCT
<N> MINERAL WOOL BATT INSULATION BETWEEN
FRAMING, CONTRACTOR TO PROVIDE SUPPORTS
<N> CONTINUOUS
VAPOR RETARDER
<N> EXTERIOR FIRE-RETARDANT
TREATED WD SHTG
<N> SILL PLATE
GASKET
<N> CUTOFF WALL, RE:
STRUCT, ALL WD
ELEMENTS TO BE
TREATED
<N> 2X TREATED SILL, RE: STRUCT
<E> TO REMAIN 1X FINISH
FLOOR OVER 1X6
STRAIGHT SHTG,
PROTECT IN PLACE
<N> CUTOFF WALL AND JOGGED FOOTING BEYOND
COMPACTED
EARTH FILL
RE: STRUCT RE: STRUCT
<N> FOOTING,
RE: STRUCT
<N> CONC BEAM, RE: STRUCT
PROVIDE CONTINUOUS SEALANTPROVIDE CONTINUOUS
SEALANT
<N> FOOTING BEYOND, RE: STRUCT
8" M
IN
<N> DAMPROOFING
MEMBRANE
<N> MTL SCREEN PER
IWUIC, FIT TO OPENING
IN CUSTOM FRAME AND
COVER IN PLACE AT
GRADE
PROTECT <E> TO
REMAIN TREE ROOTS
EXISTING SCHOOLROOM
FLOOR/NEW PORCH
FLOOR
100'-0"
EXISTING PORCH FLOOR
99'-8 3/4"
<N> 4"X14" GALV STL
VENT, TYP
<N> CONTINUOUS VAPOR
RETARDER, EXTEND TO
BOTTOM OF OPENING
WHERE OPENINGS OCCUR
<E> TO REMAIN 1X FINISH
FLOOR OVER 1X6
STRAIGHT SHTG,
PROTECT IN PLACE
<E> TO REMAIN FRAMING,
TIE TO <N> FOUNDATION,
RE: STRUCT FOR
ADDITIONAL
<N> MINERAL WOOL BATT
INSULATION BETWEEN
FRAMING, CONTRACTOR
TO PROVIDE SUPPORTS
COMPACTED
EARTH FILL
T.O. NEW PORCH STEP
99'-5"
<N> 2X TREATED SILL
CONTINUOUS OVER
OPENINGS, RE: STRUCT
RE: STRUCT
RE
: S
TR
UC
T
PROVIDE <N>
TERMINATION BAR WITH
SEALANT
<N> DAMPPROOFING
MEMBRANE, EXTEND TO
T.O. FOUNDATION
SLOPE GRADE AWAY
FROM <N> FOUNDATION
COMPACTED
EARTH FILL
<N> FOOTING,
RE: STRUCT
6" M
IN
RECONSTRUCT PORCH FLOOR AT
SCHOOLROOM LEVEL, ANTICIPATE
PHASE 2 INSTALLATION OF
SALVAGED 1X WD FINISH.
RE: STRUCT FOR <N> SHTG AND
FRAMING.
<N> CONTINUOUS VAPOR
RETARDER, EXTEND TO
WITHIN 3" OF T.O.
FOUNDATION
SLOPE GRADE AWAY
FROM <N> FOUNDATION
<N> 2X TREATED SILL,
RE: STRUCT
COMPACTED
EARTH FILL
1/4" SLOPE MAX
COMPACTED
EARTH FILL
<N> SILL PLATE GASKET
RE
: S
TR
UC
T
RE: STRUCT
PROVIDE <N>
TERMINATION BAR WITH
SEALANT
<N> DAMPPROOFING
MEMBRANE, EXTEND TO
T.O. FOUNDATION
WALL TO BE TEMPORARILY
SUPPORTED AT BASE UNTIL
PHASE 2 ALTERATIONS,
RE: STRUCT
<N> FOOTING,
RE: STRUCT
6" M
IN
<N> CONTINUOUS VAPOR
RETARDER
CAREFULLY REMOVE AND
REINSTALL <E> THRESHOLD AND
DOOR TRIM BEYOND TO
ACCOMMODATE PORCH FLOOR
RECONSTRUCTION
RE
: S
TR
UC
T
TIE <N> PORCH
FRAMING TO <E>
SCHOOLROOM
FRAMING, RE: STRUCT
<N> 2X TREATED SILL,
RE: STRUCT
COMPACTED
EARTH FILL
<N> 18"X24" MIN CRAWL
SPACE ACCESS
CENTERED BELOW
OPENING ABOVE
<N> SILL PLATE GASKET
RE: STRUCT
<N> MINERAL WOOL BATT
INSULATION BETWEEN
FRAMING, CONTRACTOR
TO PROVIDE SUPPORTS
<N> FOOTING,
RE: STRUCT
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
<N> FOUNDATION AND GRADE SHOWN FOR REFERENCE ONLY. REFER TO OTHER DISCIPLINES FOR EXTENT OF
FOUNDATION WORK AND ADDITIONAL SCOPE.
FFE 100'-0" = 1286.55' USGS. CONTRACTOR TO VERIFY IN FIELD.
ALL EXISTING ELEMENTS ARE SHOWN BASED ON AVAILABLE INFORMATION AND NON-DESTRUCTIVE FIELD OBSERVATION. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONSTRUCTION AND NOTIFY C.O. OF ANY
DISCREPANCY BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS AND REQUEST
CLARIFICATION PRIOR TO PROCEEDING WITH CONSTRUCTION.
DRAWINGS SEEK TO REPRESENT THE SCOPE AND RANGE OF WORK REQUIRED BUT ARE NOT INTENDED TO BE INCLUSIVE OF ALL NECESSARY WORK. DIMENSIONS SHOWN ARE APPROXIMATE. VERIFY IN FIELD TO ACHIEVE
<N> WORK.
VERIFY DIMENSIONS OF ALL <E> CONSTRUCTION IN FIELD. EXPECT THAT EXISTING BUILDING ELEMENTS MAY
NOT BE PLUMB, LEVEL OR SQUARE.
ALL REMOVAL AND DEMO ACTIVITIES SHALL BE EXECUTED IN A MANNER WHICH PROTECTS ALL UNDERLYING
AND ADJACENT HISTORIC MATERIALS. PROTECT IN PLACE ALL ELEMENTS <E> TO REMAIN.
WHERE WORK REQUIRES REMOVAL OF HISTORIC ELEMENTS/MATERIALS NOT INDICATED IN CONTRACT DOCUMENTS FOR REMOVAL, STOP WORK AND CONFIRM WITH C.O. FOR APPROVAL TO REMOVE ADDITIONAL
MATERIALS.
UNLESS OTHERWISE NOTED, <E> ELEMENTS REMOVED ARE TO BE CATALOGUED AND INSPECTED FOR REHABILITATION OR REPLACEMENT IN KIND AND REINSTALLED IN CURRENT LOCATION AND CONFIGURATION BY HPTC IN PHASE 2. PARK TO PROVIDE TEMPORARY, SECURE, WEATHERPROOF STORAGE UNTIL
REINSTALLATION.
COORDINATE ALL DEMO WORK WITH HAZARDOUS ABATEMENT, RE: SPECIFICATIONS AND HAZARDOUS MATERIALS REPORT FOR KNOWN HAZARDOUS MATERIALS AND REMOVAL REQUIREMENTS. CONTAMINATION DUE TO ANIMAL INFESTATION, LEAD-CONTAINING PAINT, AND LEAD-BASED PAINT IDENTIFIED THROUGHOUT WORK AREA. STOP WORK AND NOTIFY C.O. IF ANY ADDITIONAL SUSPECTED HAZARDOUS MATERIAL IS FOUND
DURING WORK.
NO SHTG EXISTS AT EXT WALLS. <N> SHTG AND BASE FLASHING TO BE INSTALLED IN PHASE 2, UON.
LEGEND
<E> TO REMAIN, PROTECT IN PLACE UON
<N> CONSTRUCTION
REMOVE <E> WD ELEMENTS AS REQUIRED TO ACCOMODATE
STRUCTURAL WORK AND REINSTALL
<N> CONCRETE ELEMENTS, RE: STRUCT
<E> 1X WD FINISH TO BE SALVAGED AND
REINSTALLED IN PHASE 2
SCALEA600.1
SCHOOLROOM BEARING1
ASCALEA600.1
PORCH BEARING2
A
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SCALE: A
1/1 6/2
6 1
1:1 8:5
9 A M
Au tod es k D oc s:/
/20
-2
P
IN
N Be ar V all ey
S ch oo l R eh ab
/20
0-
NP
S
PI
NN
B ea r V all ey S ch oo l-v
-B
IM
0.r vt
A600.1
CR/MS
BEAR VALLEY SCHOOL REHABILITATION
PINNACLES NATIONAL PARK
XXX
XXXXX
331043
MS
CR/EH/WS
1/16/2026 5 12
DETAILS - PHASE 1
12012 6
SCALE OF INCHES
SCALEA600.1
FOUNDATION SECTION AT AREA OF TREE PROTECTION3
FOUNDATION DESIGN:
1. REFER TO SOILS REPORT NO. 502075008 BY NINYO & MOORE, DATED JANUARY 27, 2025.
2. GEOTECHNICAL ENGINEER ASSOCIATED WITH THE SPECIAL INSPECTOR SHALL VERIFY SOIL CONDITIONS AND TYPES
DURING EXCAVATION AND PRIOR TO PLACEMENT OF FORMWORK OR CONCRETE.
3. MINIMUM EMBEDMENT DEPTH SHALL BE 1'-0" BELOW EXTERIOR GRADE.
FOOTINGS:
1. DESIGN OF FOOTINGS W/ MINIMUM 18" WIDTH FOR CONTINUOUS & 24" WIDTH FOR ISOLATED IS BASED ON:
A. MAXIMUM ALLOWABLE BEARING PRESSURE, STATIC 2,500 PSF
B. MAXIMUM ALLOWABLE BEARING PRESSURE, SHORT TERM 3,325 PSF
C. PASSIVE RESISTING 300 PCF
D. COEFFICIENT OF SLIDING FRICTION 0.40
2. BEAR ON 12" OR MORE OF COMPACTED ENGINEERED FILL OR APPROVED EXISTING FILL/ALLUVIUM. FOOTINGS SHALL
BEAR BELOW MINIMUM EMBEDMENT DEPTH.
REINFORCED CONCRETE:
1. DESIGN IS BASED ON ACI 318 "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE."
2. CONCRETE WORK SHALL CONFORM TO ACI 301 "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE."
3. STRUCTURAL CONCRETE SHALL HAVE THE PROPERTIES INDICATED IN THE CONCRETE MIX TABLE.
4. CONCRETE MIX TABLE NOTES:
A. CONCRETE MIX SUBMITTAL SHALL INCLUDE A SINGLE PAGE LIST OF MIXES, IN TABULAR FORMAT, WITH KEY MIX REQUIREMENTS.
B. N/R: NO REQUIREMENT, NO STRUCTURAL REQUIREMENTS.
C. SLUMP:
1. CONCRETE SUPPLIER TO PROVIDE TARGET SLUMP ON BATCH TICKETS FOR TESTING AGENCY QUALITY CONTROL.
D. CEMENT SHALL CONFORM TO ASTM C150, ASTM C595, OR ASTM C1157.
E. AIR CONTENT:
1. N/P: AIR ENTRAINING ADMIXTURES NOT PERMITTED, ENTRAPPED AIR ONLY
2. N/R: NO REQUIREMENT, NO STRUCTURAL AIR CONTENT REQUIREMENTS
F. CHLORIDE ION: MAXIMUM WATER-SOLUBLE CHLORIDE ION (Cl-) CONTENT IN CONCRETE, PERCENT BY WEIGHT OF CEMENT
G. ADMIXTURES/COMMENTS
1. SCM: LIMITS ON MAXIMUM SCM CONTENT PER ACI 318 TABLE 26.4.2.2(b)
2. AAR: PROVIDE DOCUMENTATION THAT AGGREGATES ARE NOT ALKALI-SILICA REACTIVE OR ALKALI-CARBONATE REACTIVE PER
ASTM C1778.
3. FA: LIMITS ON FLY ASH, 15% MINIMUM, 25% MAXIMUM
5. DETAILING, FABRICATION, AND PLACEMENT OF REINFORCING STEEL SHALL BE IN ACCORDANCE WITH ACI 315 "DETAILS AND DETAILING OF
CONCRETE REINFORCEMENT."
6. REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60, EXCEPT BARS SHOWN TO BE FIELD-BENT SHALL BE ASTM A706, GRADE 60.
7. UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS, LAP BARS PER THE CONCRETE LAP SPLICE SCHEDULE.
8. AT CORNERS AND INTERSECTIONS, MAKE HORIZONTAL BARS CONTINUOUS OR PROVIDE MATCHING CORNER BARS FOR EACH LAYER OF
REINFORCEMENT.
9. TRIM OPENINGS IN WALLS AND STRUCTURAL CONCRETE SLABS WITH (2) #5 FOR EACH LAYER OF REINFORCEMENT, FULLY DEVELOPED BY
EXTENSION OR HOOK.
10. FORM INTERMITTENT SHEAR KEYS AT ALL CONSTRUCTION JOINTS AND AS SHOWN ON THE STRUCTURAL DRAWINGS.
11. EXCEPT AS NOTED ON THE DRAWINGS, CONCRETE PROTECTION FOR REINFORCEMENT IN CAST-IN-PLACE CONCRETE SHALL BE AS FOLLOWS:
A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
B. EXPOSED TO EARTH OR WEATHER:
1. #6 THROUGH #18 BARS 2"
2. #5 BAR, W31 OR D31 WIRE, AND SMALLER 1-1/2"
12. ANCHOR BOLTS SHALL BE PLACED WITH SETTING TEMPLATES.
POST-INSTALLED ANCHORS
1. ALL CAST-IN-PLACE ANCHORS DESIGNED IN ACCORDANCE WITH ACI 318.
2. POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE SPECIFIED ON THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL OBTAIN
APPROVAL FROM THE CONTRACTING OFFICER PRIOR TO INSTALLING POST-INSTALLED ANCHORS IN PLACE OF MISSING OR MISPLACED CAST-IN-
PLACE ANCHORS.
3. CARE SHALL BE TAKEN IN PLACING POST-INSTALLED ANCHORS TO AVOID CONFLICTS WITH EXISTING REBAR. EXISTING REINFORCING BARS SHALL
NOT BE CUT UNLESS APPROVED BY THE CONTRACTING OFFICER.
4. ALL ANCHORS MUST BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER’S PRINTED INSTALLATION INFORMATION (MPII) IN CONJUNCTION WITH EDGE DISTANCE, SPACING, AND EMBEDMENT DEPTH AS INDICATED ON THE DRAWINGS. HOLES SHALL BE DRILLED AND
CLEANED IN ACCORDANCE WITH THE MPII.
5. SUBSTITUTION REQUESTS, FOR PRODUCTS OTHER THAN THOSE SPECIFIED, SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CONTRACTING OFFICER ALONG WITH CALCULATIONS THAT ARE PREPARED & SEALED BY A REGISTERED PROFESSIONAL ENGINEER; REGISTRATION MUST BE IN THE STATE OF CALIFORNIA. THE CALCULATIONS SHALL DEMONSTRATE THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING EQUIVALENT PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S) AS
REQUIRED BY THE AUTHORITY HAVING JURISDICTION.
6. THE CONTRACTOR SHALL ARRANGE FOR A MANUFACTURER’S FIELD REPRESENTATIVE TO PROVIDE INSTALLATION TRAINING FOR ALL PRODUCTS TO BE USED, PRIOR TO THE ANCHOR INSTALLATION. A RECORD OF TRAINING SHALL BE KEPT ON SITE AND MADE AVAILABLE TO THE SPECIAL
INSPECTOR AS REQUESTED.
7. ADHESIVE ANCHORS INSTALLED IN HORIZONTAL TO VERTICALLY OVERHEAD ORIENTATION THAT SUPPORT SUSTAINED TENSION LOADS SHALL BE DONE BY A CERTIFIED ANCHOR INSTALLER (AAI) AS CERTIFIED THROUGH ACI/CRSI (ACI 318-19 17.2.3). PROOF OF CURRENT CERTIFICATION SHALL
BE SUBMITTED TO THE EOR FOR APPROVAL PRIOR TO COMMENCEMENT OF INSTALLATION.
8. ADHESIVE ANCHORS MUST BE INSTALLED IN CONCRETE AGED A MINIMUM OF 21 DAYS (ACI 318-19 17.2.2)
9. ALL POST-INSTALLED ANCHORS SHALL BE INSTALLED IN DRY HOLES THAT HAVE BEEN DRILLED, CLEANED, AND PREPARED IN STRICT ACCORDANCE
WITH THE MANUFACTURER’S PRINTED INSTALLATION INFORMATION AND THE RESPECTIVE ICC-ES EVALUATION REPORTS.
10. PROVIDE SPECIAL INSPECTION FOR ALL MECHANICAL AND ADHESIVE ANCHORS PER THE APPLICABLE BUILDING CODE AND PER THE CURRENT ICC-
ES REPORT (IBC TABLE 1705.3 NOTE B).
FIELD VERIFICATION OF EXISTING CONDITIONS:
1. THE GENERAL CONTRACTOR SHALL THOROUGHLY INSPECT AND SURVEY THE EXISTING STRUCTURE TO VERIFY CONDITIONS THAT
AFFECT THE WORK SHOWN ON THE DRAWINGS.
2. THE GENERAL CONTRACTOR SHALL REPORT ANY VARIATIONS OR DISCREPANCIES TO THE CONTRACTING OFFICER BEFORE PROCEEDING.
3e a a a a
2e
2r
3r2n
2e
GABLE ROOF (θ = 35.3°) (a=3ft) aa
3r
2n
3e
3r
2n
3e
3e 3r2n h
STRUCTURAL SCOPE OF WORK:
THE PRIMARY SCOPE OF THIS PROJECT IS REHABILITATION WITH A CHANGE OF OCCUPANCY WITHOUT A CHANGE IN RISK CATEGORY, INCLUDING THE FOLLOWING STRUCTURAL ITEMS OF WORK:
• PHASE 1
• NEW FOUNDATION AND LEVELING TO ADDRESS SEVERE DIFFERENTIAL SETTLEMENT
• PORCH FLOOR FRAMING REPLACEMENT TO ADDRESS WOOD DETERIORATION
• SEISMIC RETROFIT AS MANDATED PER RP10-22
• ANCHORAGE OF BUILDING TO NEW FOUNDATION, INCLUDING HOLDOWNS FOR PHASE 2 SHEAR WALLS
DESIGN LOADS:
1. AUTHORITY HAVING JURISDICTION: UNITED STATES GOVERNMENT
2. DESIGN BASED ON: 2024 INTERNATIONAL BUILDING CODE (IBC), 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC), ASCE 7-22, AND NIST (NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY) INTERAGENCY REPORT STANDARDS OF SEISMIC SAFETY FOR EXISTING FEDERALLY OWNED AND LEASED BUILDINGS ICSSC (INTERAGENCY COMMITTEE ON SEISMIC SAFETY IN CONSTRUCTION)
RECOMMENDED PRACTICE 10 (RP10-22)
3. RISK CATEGORY: II STANDARD
4. SITE LOCATION:
A. ELEVATION 1,285 FT
B. COORDINATES 36.5341 N, 121.1471 W
5. ROOF LIVE LOADS:
A. ROOF LIVE LOAD 20 PSF, 300 LBS
6. FLOOR LIVE LOADS:
7. WIND:
A. BASIC DESIGN WIND SPEED, V, (3-SECOND GUST) 92 MPH
B. ALLOWABLE STRESS DESIGN WIND SPEED, VASD, (3-SECOND GUST) 71 MPH
C. INTERNAL PRESSURE COEFFICIENT, GCpi ±0.18 (ENCLOSED)
D. WIND EXPOSURE C
E. GROUND ELEVATION FACTOR, Ke 0.95
F. COMPONENTS AND CLADDING ULTIMATE DESIGN WIND PRESSURES
1. PRESSURES MAY BE REDUCED FOR EFFECTIVE WIND AREAS LARGER THAN 10 SQUARE FEET, BUT NOT BELOW 16 PSF.
G. ALLOWABLE WIND PRESSURE (ASD) MAY BE DETERMINED BY MULTIPLYING THE ULTIMATE PRESSURE BY 0.6.
8. SEISMIC:
A. SPECTRAL RESPONSE ACCELERATION PARAMETERS
1. SHORT PERIOD
a. SS 2.06g
b. SDS 1.45g
2. ONE SECOND
a. S1 0.77g
b. SD1 1.19g
B. SOILS SITE CLASS CD
C. SEISMIC IMPORTANCE FACTOR 1.0
D. SEISMIC DESIGN CATEGORY E
E. BASIC SEISMIC-FORCE-RESISTING SYSTEM
• LIGHT-FRAME WOOD WALLS W/ WOOD STRUCTURAL SHEAR PANELS
F. DESIGN BASE SHEAR 10 KIPS
G. SEISMIC RESPONSE COEFFICIENT, CS 0.223
H. RESPONSE MODIFICATION COEFFICIENT, R 6.5
I. ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE
PHASE 1 STRUCTURAL DRAWING LIST
SHEET NO SHEET TITLE
S001.1 STRUCTURAL GENERAL NOTES - PHASE 1
S002.1 STRUCTURAL GENERAL NOTES - PHASE 1
S003.1 STRUCTURAL ABBREVIATIONS & SYMBOLS & 3D VIEW - PHASE 1
S101.1 FOUNDATION & FLOOR FRAMING PLAN - PHASE 1
S401.1 SHEAR WALL ELEVATIONS - PHASE 1
S501.1 TYPICAL DETAILS - PHASE 1
S511.1 FOUNDATION SECTIONS - PHASE 1
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF1
/1
/2
:1 :4
A
M A u to d e s k D o c s /2
-2
P
IN
N
B e a r
V a lle y S c h o o l R e h a b /2
N
P S
P
IN
N B
V S
S tr u c t S
C lo u d .r v t
S001.1
CMS
BEAR VALLEY SCHOOL REHABILITATION
PINNACLES NATIONAL PARK
XXX
XXXXXX
331043
JSS / CMS
JSS
01/16/2026 12
STRUCTURAL GENERAL
NOTES - PHASE 1
OCCUPANCY OR USE UNIFORMLY DISTRIBUTED (PSF) CONCENTRATED LOAD (LBS) LIVE LOAD REDUCTION
PUBLIC SPACES (W/ SIGNAGE POSTED) 75 2,000 NO
UNINHABITABLE ATTIC STORAGE 20 N/A YES
CONCRETE POST-INSTALLED ANCHORS
ANCHOR TYPE DEWALT HILTI SIMPSON
EXPANSION POWER-STUD+ SD2 (ICC ESR-2502) KWIK BOLT TZ2 (ICC ESR-4266) STRONG-BOLT 2 (ICC ESR-3037)
SCREW SCREW-BOLT+ (ICC ESR-3889) KWIK HUS-EZ (ICC ESR-3027) TITEN HD (ICC ESR-2713)
ADHESIVE AC200+ (ICC ESR-4027) HIT HY-200 V3 (ICC ESR-4868) AT-XP (UES ER-263)
STRUCTURAL GENERAL NOTES
MASONRY POST-INSTALLED ANCHORS
ANCHOR TYPE DEWALT HILTI SIMPSON
ADHESIVE AC100+ GOLD (ICC ESR-4105) HIT HY-270 (ICC ESR-4144) ET-3G (UES ER-870)
COMPONENT AND CLADDING
ULTIMATE WIND PRESSURE -
GABLE ROOF
ROOF
(EFFECTIVE
WIND AREA)
ROOF SURFACE
PRESSURE (psf)
10 s f 100 s f
Negative Zone 1 -30 -16
Negative Zone 2 -33 -21
Negative Zone 3 -40 -23
Positive All Zones 16 16
Overhang Zone 1 -43 -26
Overhang Zone 2 -46 -32
Overhang Zone 3 -58 -36
WALL
(EFFECTIVE
WIND AREA)
WALL
SURFACE
PRESSURE
(psf)
10 sf 100 sf
Negative Zone 4 -19 -17
Negative Zone 5 -24 -18
Positive All Zones 18 16
CONCRETE MIX TABLE
INTENDED USE
EXPOSURE
CLASS
COMPRESSIVE
STRENGTH, f'c
CONCRETE
WEIGHT
CEMENT
TYPE
MAX
W/CM
RATIO
MAXIMUM
AGGREG
ATE SIZE
SLUMP,
INCHES
(+/- 1")
AIR
CONTENT
PERCENT
(+/- 1.5%)
MAXIMUM
CHLORIDE
ION, (Cl-) MIX NOTES/ COMMENTSPSI
TESTING
AGE, DAYS
FOOTINGS/GRADE BEAMS F2-S0-W1-C1 4500 56 NW N/R 0.45 1" N/R 6% 0.30% AAR; FA
SLAB ON GRADE - EXTERIOR F3-S0-W1-C0 5000 28 NW N/R 0.40 1" N/R 6% 1.00% SCM; AAR; FA
STRUCTURAL WOOD FRAMING:
1. IN-GRADE BASE VALUES HAVE BEEN USED FOR DESIGN.
2. DIMENSIONAL LUMBER FRAMING SHALL BE S4S DOUGLAS FIR-LARCH NO. 2 OR BETTER UNO.
3. SOLID TIMBER BEAMS AND POSTS SHALL BE DOUGLAS FIR-LARCH NO. 1 OR BETTER UNO.
4. STUDS SHALL BE DOUGLAS FIR-LARCH NO. 2 GRADE OR BETTER UNO.
5. TOP AND BOTTOM PLATES SHALL BE DOUGLAS FIR-LARCH NO. 2 OR BETTER UNO.
6. ALL LUMBER SHALL BE 19% MAXIMUM MOISTURE CONTENT AT THE TIME OF INSTALLATION UNO.
7. ALL WOOD EXPOSED TO WEATHER OR IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE TREATED DOUGLAS FIR-LARCH OR
SOUTHERN YELLOW PINE WITH NO INCISCIONS PERMITTED WHERE LUMBER IS VISIBLE. PRESERVATIVE-TREATED WOOD SHALL BE TREATED IN ACCORDANCE WITH AWPA STANDARDS U1 AND M4. TREATMENTS SHALL HAVE NO AMMONIA ADDED AND SHALL BE THE FOLLOWING USE
CATEGORY:
A. UC2 AT INTERIOR
B. UC3B AT EXTERIOR WITH NO GROUND CONTACT
8. FASTENERS FOR USE WITH TREATED WOOD SHALL BE CORROSION RESISTANT IN ACCORDANCE WITH SECTION 2304.10.6 OF THE IBC.
9. ALL CONNECTORS USED WITH PRESSURE-TREATED MATERIAL SHALL BE STAINLESS STEEL ASTM 304 OR 316, OR HAVE A SIMPSON Z-MAX (G185) OR
HDG COATING. STANDARD COATING (G90) IS ACCEPTABLE AT INTERIOR CONDITIONS WITH NON PRESSURE-TREATED LUMBER ONLY. CONNECTORS
ARE TO BE IN ACCORDANCE WITH ASTM A653 OR ASTM 123.
10. ALL IRON AND STEEL PRODUCTS ATTACHED TO TREATED LUMBER SHALL BE HOT-DIPPED GALVANIZED IN ACCORDANCE WITH ASTM A123 OR SHALL
BE TYPE 304 OR 316 STAINLESS STEEL.
11. STRUCTURAL MEMBERS SHALL NOT BE CUT FOR PIPES, ETC. UNLESS SPECIFICALLY NOTED OR DETAILED ON THE STRUCTURAL DRAWINGS.
12. ALL BOLTS SHALL BE RETIGHTENED PRIOR TO CLOSING IN OF WALLS, FLOORS, AND ROOFS.
13. ALL BOLTS BEARING ON WOOD SHALL HAVE STANDARD CUT WASHERS UNDER HEAD AND/OR NUT, UNO.
14. LIGHT GAGE METAL FRAMING CONNECTORS SPECIFIED IN THE DRAWINGS ARE SIMPSON STRONG-TIE CODE-APPROVED PRODUCTS. THEY ARE
SPECIFIED AS THE BASIS OF DESIGN. ALTERNATE PRODUCTS WITH CODE-APPROVED TESTING REPORTS MAY BE SUBSTITUTED THAT HAVE EQUAL OR GREATER SALIENT CHARACTERISTICS. CHARACTERISTICS INCLUDE SAME OR GREATER ALLOWABLE STRESS DESIGN CAPACITIES FOR THE SAME INTENDED USE(S) AND SIMILAR BASIC GEOMETRIC PROPERTIES. SEE SPECIFICATIONS FOR A LIST OF SALIENT CHARACTERISTICS. THE CONTRACTOR SHALL COMPARE SPECIFIED BASIS OF DESIGN PRODUCTS USING THE LATEST EDITION OF SIMPSON STRONG-TIE'S CATALOG TO PROPOSED SUBSTITUTION PRODUCTS AND SUBMIT TO CONTRACTING OFFICER FOR APPROVAL. CONNECTORS SHALL BE INSTALLED WITH ALL HOLES FILLED (ROUND AND TRIANGULAR) WITH THE MAXIMUM SIZE FASTENERS RECOMMENDED BY THE MANUFACTURER TO DEVELOP THE
MAXIMUM RATED CAPACITY, UNLESS SPECIFICALLY NOTED OTHERWISE.
15. CONNECTOR BOLTS AND LAG SCREWS SHALL CONFORM TO ANSI/ASME B18.2.1 AND ASTM SAE J429 GRADE 1.
16. NAILS AND SPIKES SHALL CONFORM TO ASTM F1667.
17. WOOD SCREWS SHALL CONFORM TO ANSI/ASME B18.6.1.
18. LEAD HOLES FOR LAG SCREWS SHALL BE 40%-70% OF THE SHANK DIAMETER AT THE THREADED SECTION AND EQUAL TO THE SHANK DIAMETER AT
THE UNTHREADED SECTION.
19. CONVENTIONAL LIGHT FRAMING SHALL COMPLY WITH IBC SECTION 2308.
20. ALL BEAMS AND TRUSSES SHALL BE BRACED AGAINST ROTATION AT POINTS OF BEARING.
21. 2X BLOCKING SHALL BE PLACED BETWEEN JOISTS OR RAFTERS AT ALL SUPPORTS, UNO.
22. PROVIDE A MINIMUM OF (3) STUDS AT EACH CORNER, UNO.
23. ALL JOISTS AND BEAMS SHALL BE SEAT-CUT FOR FULL UNIFORM BEARING AT SUPPORTS, SEATS, CAPS, ETC.
24. VENTING IS REQUIRED IN ALL ENCLOSED ROOF AND CRAWL SPACE FRAMING CAVITIES, SEE ARCHITECTURAL DRAWINGS.
25. EXCEPT AS NOTED OTHERWISE, MINIMUM NAILING SHALL BE PROVIDED AS SPECIFIED IN TABLE 2304.10.2 "FASTENING SCHEDULE" OF THE IBC.
26. ALL MULTIPLE MEMBER BEAMS SHALL BE NAILED TOGETHER WITH MAX NUMBER OF 10D NAILS VERTICALLY @ 3" AND HORIZONTALLY @ 12" PER PLY.
SHOP DRAWINGS:
1. THE STRUCTURAL DRAWINGS ARE COPYRIGHTED AND SHALL NOT BE COPIED FOR USE AS ERECTION PLANS OR SHOP DETAILS. USE OF JVA'S
ELECTRONIC FILES AS THE BASIS FOR SHOP DRAWINGS REQUIRES PRIOR APPROVAL BY JVA, A SIGNED RELEASE OF LIABILITY BY THE GENERAL CONTRACTOR AND/OR HIS/HER SUBCONTRACTORS, AND DELETION OF JVA'S NAME AND LOGO FROM ALL SHEETS SO USED.
2. THE GENERAL CONTRACTOR SHALL SUBMIT IN WRITING ANY REQUESTS TO MODIFY THE STRUCTURAL DRAWINGS OR PROJECT SPECIFICATIONS.
3. ALL SHOP AND ERECTION DRAWINGS SHALL BE CHECKED AND STAMPED (AFTER HAVING BEEN CHECKED) BY THE GENERAL CONTRACTOR PRIOR TO
SUBMISSION FOR CONTRACTING OFFICER'S REVIEW; SHOP DRAWING SUBMITTALS NOT CHECKED BY THE GENERAL CONTRACTOR PRIOR TO
SUBMISSION TO THE CONTRACTING OFFICER WILL BE RETURNED WITHOUT REVIEW.
4. FURNISH ELECTRONIC VERSION (PDF) OF SHOP AND ERECTION DRAWINGS TO THE CONTRACTING OFFICER FOR REVIEW PRIOR TO FABRICATION
FOR:
A. CONCRETE MIX DESIGNS
B. CONCRETE REINFORCING STEEL
5. SUBMIT IN A TIMELY MANNER TO PERMIT 10 WORKING DAYS FOR REVIEW BY THE CONTRACTING OFFICER.
6. SHOP DRAWINGS SUBMITTED FOR REVIEW DO NOT CONSTITUTE "REQUEST FOR CHANGE IN WRITING" UNLESS SPECIFIC SUGGESTED CHANGES ARE
CLEARLY MARKED. IN ANY EVENT, CHANGES MADE BY MEANS OF THE SHOP DRAWING SUBMITTAL PROCESS BECOME THE RESPONSIBILITY OF THE
ONE INITIATING THE CHANGE.
PRECAUTIONARY NOTES ON STRUCTURAL BEHAVIOR:
1. INTERIOR ARCHITECTURAL FINISH DETAILING MUST ACCOMMODATE THE RELATIVE DIFFERENTIAL MOVEMENTS OF SUPPORTING STRUCTURAL
ELEMENTS.
2. WHERE THE ROOF FRAMING ELEMENT SPANS ARE LONG, APPLIED LOADING WILL NATURALLY CAUSE SUBSTANTIAL DEFLECTION. INTERIOR
ELEMENTS HUNG FROM THE ROOF STRUCTURE WILL DEFLECT WITH THE ROOF.
3. EXTERIOR/PERIMETER WALL ASSEMBLIES HUNG FROM THE EDGE OF THE BUILDING STRUCTURE WILL BE DIRECTLY AFFECTED (TO SOME DEGREE)
BY CHANGES IN EXTERNAL TEMPERATURE AND FLOOR DEFLECTION.
4. EXTERIOR/PERIMETER AND INTERIOR ARCHITECTURAL FINISH DETAILS SHOULD ALLOW FOR RELATIVE MOVEMENTS BETWEEN ELEMENTS WITH
DIFFERENT SUPPORT CONDITIONS.
STRUCTURAL ERECTION AND BRACING REQUIREMENTS:
1. THE STRUCTURAL DRAWINGS ILLUSTRATE AND DESCRIBE THE COMPLETED STRUCTURE WITH ELEMENTS IN THEIR FINAL POSITIONS, PROPERLY
SUPPORTED, CONNECTED, AND/OR BRACED.
2. THE STRUCTURAL DRAWINGS ILLUSTRATE TYPICAL AND REPRESENTATIVE DETAILS TO ASSIST THE GENERAL CONTRACTOR. DETAILS SHOWN
APPLY AT ALL SIMILAR CONDITIONS UNLESS OTHERWISE INDICATED. ALTHOUGH DUE DILIGENCE HAS BEEN APPLIED TO MAKE THE DRAWINGS AS COMPLETE AS POSSIBLE, NOT EVERY DETAIL IS ILLUSTRATED AND NOT EVERY EXCEPTIONAL CONDITION IS ADDRESSED.
3. ALL PROPRIETARY CONNECTIONS AND ELEMENTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS.
4. ALL WORK SHALL BE ACCOMPLISHED IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH THE APPLICABLE CODES AND LOCAL ORDINANCES.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL WORK, INCLUDING LAYOUT AND DIMENSION VERIFICATION, MATERIALS
COORDINATION, SHOP DRAWING REVIEW, AND THE WORK OF SUBCONTRACTORS. ANY DISCREPANCIES OR OMISSIONS DISCOVERED IN THE COURSE OF THE WORK SHALL BE IMMEDIATELY REPORTED TO THE CONTRACTING OFFICER FOR RESOLUTION.
6. CONTINUATION OF WORK WITHOUT NOTIFICATION OF DISCREPANCIES RELIEVES THE CONTRACTING OFFICER FROM ALL CONSEQUENCES.
7. UNLESS OTHERWISE SPECIFICALLY INDICATED, THE STRUCTURAL DRAWINGS DO NOT DESCRIBE METHODS OF CONSTRUCTION.
8. THE GENERAL CONTRACTOR, IN THE PROPER SEQUENCE, SHALL PERFORM OR SUPERVISE ALL WORK NECESSARY TO ACHIEVE THE FINAL
COMPLETED STRUCTURE, AND TO PROTECT THE STRUCTURE, WORKMEN, AND OTHERS DURING CONSTRUCTION. SUCH WORK SHALL INCLUDE, BUT NOT BE LIMITED TO TEMPORARY BRACING, SHORING FOR CONSTRUCTION EQUIPMENT, SHORING FOR EXCAVATION, FORMWORK, SCAFFOLDING, SAFETY DEVICES AND PROGRAMS OF ALL KINDS, SUPPORT AND BRACING FOR CRANES AND OTHER ERECTION EQUIPMENT.
9. TEMPORARY BRACING SHALL REMAIN IN PLACE UNTIL ALL FLOORS, WALLS, ROOFS AND ANY OTHER SUPPORTING ELEMENTS ARE IN PLACE.
10. THE CONTRACTING OFFICER BEARS NO RESPONSIBILITY FOR THE ABOVE ITEMS, AND OBSERVATION VISITS TO THE SITE DO NOT IN ANY WAY
INCLUDE INSPECTIONS OF THESE ITEMS.
SPECIAL INSPECTIONS:
1. FOR THE DETAILED LIST OF REQUIRED INSPECTIONS, REFER TO THE "STATEMENT OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS" CONTAINED IN
SECTION 01 40 00 QUALITY REQUIREMENTS OF THE SPECIFICATIONS. THE FOLLOWING SPECIAL INSPECTIONS AND TESTING LIST IS SHOWN HERE FOR REFERENCE ONLY AND SHALL BE PERFORMED BY A QUALIFIED SPECIAL INSPECTOR, EMPLOYED BY THE GENERAL CONTRACTOR, IN ACCORDANCE
WITH CHAPTER 17 OF THE IBC:
A. SECTION 1704 SPECIAL INSPECTIONS, CONTRACTOR RESPONSIBILITY, AND STRUCTURAL OBSERVATIONS AND THE FOLLOWING SUB-
SECTIONS:
1. 1704.2 SPECIAL INSPECTIONS AND TESTS
2. 1704.3 STATEMENT OF SPECIAL INSPECTIONS
B. SECTION 1705 REQUIRED VERIFICATION AND INSPECTION AND THE FOLLOWING SUB-SECTIONS:
1. 1705.1.1 SPECIAL CASES (POST-INSTALLED ANCHORS)
2. 1705.3 CONCRETE CONSTRUCTION
3. 1705.6 SOILS
4. SECTION 1705.13 SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE AND THE FOLLOWING SUB-SECTIONS:
a. 1705.13.2 STRUCTURAL WOOD
b. 1705.13.4 DESIGNATED SEISMIC SYSTEM
2. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE CONTRACTING OFFICER, FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION. THE APPROVED INSPECTOR MUST BE INDEPENDENT FROM THE CONTRACTOR RESPONSIBLE FOR THE WORK BEING INSPECTED.
3. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR SHALL BE TO INSPECT AND/OR TEST THE WORK OUTLINED ABOVE AND WITHIN THE STATEMENT OF SPECIAL INSPECTIONS IN ACCORDANCE WITH CHAPTER 17 OF THE IBC FOR CONFORMANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS.
4. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR AND CONTRACTING OFFICER FOR CORRECTION.
5. PER SECTION 1704.2.4 THE SPECIAL INSPECTOR SHALL FURNISH REGULAR REPORTS TO THE CONTRACTING OFFICER. PROGRESS REPORTS FOR
CONTINUOUS INSPECTION SHALL BE FURNISHED WEEKLY. INDIVIDUAL REPORTS OF PERIODIC INSPECTIONS SHALL BE FURNISHED WITHIN ONE WEEK OF INSPECTION DATES. THE REPORTS SHALL NOTE UNCORRECTED DEFICIENCIES, CORRECTION OF PREVIOUSLY REPORTED DEFICIENCIES, AND CHANGES TO THE APPROVED CONSTRUCTION DOCUMENTS AUTHORIZED BY THE CONTRACTING OFFICER.
6. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT WITHIN 10 DAYS OF THE FINAL SPECIAL INSPECTION STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE INSPECTOR'S KNOWLEDGE, IN CONFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE IBC. WORK NOT IN COMPLIANCE SHALL BE NOTED IN THE REPORT.
7. THE CONTRACTOR SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE CONTRACTING OFFICER PRIOR TO THE COMMENCEMENT OF WORK ON A MAIN WIND- OR SEISMIC-FORCE-RESISTING SYSTEM PER SECTION 1704.4. THE STATEMENT SHALL ACKNOWLEDGE THE AWARENESS OF THE SPECIAL LISTED REQUIREMENTS OF DESIGNATED SEISMIC SYSTEM OR A WIND- OR SEISMIC-RESISTING COMPONENT IN THE STATEMENT OF
SPECIAL INSPECTIONS PER SECTION 1705.
8. EXCEPT AS NOTED, THE SPECIAL INSPECTIONS OUTLINED ABOVE ARE IN ADDITION TO, AND BEYOND THE SCOPE OF, PERIODIC STRUCTURAL OBSERVATIONS AS DEFINED IN SECTION 1704.6. STRUCTURAL OBSERVATIONS ARE INCLUDED IN THE CONTRACTING OFFICER'S CONSTRUCTION
ADMINISTRATION SERVICES.
WOOD SHEATHING:
1. PLYWOOD AND ORIENTED STRAND BOARD (OSB) FLOOR AND ROOF SHEATHING SHALL BE APA RATED WITH STAMP INCLUDING APA TRADEMARK
AND PANEL SPAN RATING.
A. MINIMUM FLOOR SHEATHING: 23/32" APA STURD-I-FLOOR RATED 24 INCH O.C. TONGUE & GROOVE, GLUED AND NAILED.
2. ALL SHEATHING SHEETS SHALL HAVE 1/8" GAP AT ALL EDGES AND JOINTS.
3. FULLY NAIL FLOOR SHEATHING IMMEDIATELY AFTER GLUING (DO NOT SPOT NAIL).
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF1
/1
/2
:1 :4
A
M A u to d e s k D o c s /2
-2
P
IN
N
B e a r
V a lle y S c h o o l R e h a b /2
N
P S
P
IN
N B
V S
S tr u c t S
C lo u d .r v t
S002.1
CMS
BEAR VALLEY SCHOOL REHABILITATION
PINNACLES NATIONAL PARK
XXX
XXXXXX
331043
JSS / CMS
JSS
01/16/2026 12
STRUCTURAL GENERAL
NOTES - PHASE 1
GRID
SWx
X
DIRECTION OF DECK SPAN
GRID DESIGNATION
REVISION
SHEAR WALL
SHORING
STEP IN FLOOR ELEVATION
CMU (CONCRETE MASONRY UNIT)
BRICK
CIP CONCRETE
PRECAST CONCRETE
EXISTING CONCRETE
EARTH
[XXX'-X]
XXX'-X TOP OF CONCRETE OR
MASONRY ELEVATION
TOP OF BEAM ELEVATION
JB XXX'-X JOIST BEARING ELEVATION
BL XXX'-X
BRICK LEDGE ELEVATION
(XXX'-X) TOP OF FOOTING ELEVATION
TOP OF FLOOR ELEVATIONXXX'-X
FX.X ISOLATED SPREAD FOOTING MARK
FXX SPREAD FOOTING MARK
STEP STEP IN BOTTOM OF
WALL/GRADE BEAM
CONT
CXX
B
CXX
STUB
CXX
HGR
COLUMN CONTINUOUS FROM
LEVEL BELOW
COLUMN STARTING AT THIS LEVEL
COLUMN STOPPING BELOW THIS
LEVEL, SEE FRAMING PLAN AT NEXT
LOWER LEVEL
COLUMN STARTING AND ENDING AT
THIS LEVEL OF FRAMING
COLUMN CONNECTING A LOWER
BEAM TO A HIGHER BEAM AT THIS
LEVEL OF FRAMINGB
U
IL
D
IN
G C
O L U
M N
D E
S
IG
N A
T
IO
N S
SYMBOLS KEY
ABBREVIATIONS
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF1
/1
/2
:1 :4
A
M A u to d e s k D o c s /2
-2
P
IN
N
B e a r
V a lle y S c h o o l R e h a b /2
N
P S
P
IN
N B
V S
S tr u c t S
C lo u d .r v t
S003.1
CMS
BEAR VALLEY SCHOOL REHABILITATION
PINNACLES NATIONAL PARK
XXX
XXXXXX
331043
JSS / CMS
JSS
01/16/2026 12
STRUCTURAL
ABBREVIATIONS & SYMBOLS
& 3D VIEW - PHASE 1
(E) EXISTING
(N) NEW
(R) REMOVE
@ ON CENTER SPACING
AB ANCHOR ROD (BOLT)
ADDL ADDITIONAL
ADJ ADJUSTABLE
AESS ARCH EXPOSED STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AMT AMOUNT
ANCH ANCHOR, ANCHORAGE
APPROX APPROXIMATE
ARCH ARCHITECT, -URAL
ATR ALL THREAD ROD
AVG AVERAGE
BC BOTTOM OF CONCRETE
BL BRICK LEDGE
BLK BLOCK
BLKG BLOCKING
BM (S) BEAM, BEAMS
BOT BOTTOM
BRG BEARING
BW BOTTOM OF WALL
CB COUNTERBORE
CF CUBIC FOOT
CFS COLD FORMED STEEL
CG CENTER OF GRAVITY
CIP CAST-IN-PLACE
CJ CONSTRUCTION JOINT, CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER, -MENT
CMU CONCRETE MASONRY UNIT
COL COLUMN
COM COMMON
COMB COMBINATION
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS, CONTINUE
COORD COORDINATE, COORDINATION
CS COIL STRAP, COUNTERSINK
CTR CENTER
CY CUBIC YARD
DBL DOUBLE
DET DETAIL
DEV DEVELOP
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DN DOWN
DP DRILLED PIER
DT DOUBLE TEE
DWG DRAWING
DWL DOWEL
E-E END TO END
E-W EAST TO WEST
EA EACH
ECC ECCENTRIC
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC, ELECTRICAL
EMBED EMBEDMENT
ENGR ENGINEER
EOR ENGINEER OF RECORD
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EACH SIDE
EST ESTIMATE
EXC EXCAVATE
EXP EXPANSION
EXT EXTERIOR
F-F FACE TO FACE
FD FLOOR DRAIN
FDN FOUNDATION
FF FINISHED FLOOR, FAR FACE
FIG FIGURE
FIN FINISH
FL FLUSH
FLG FLANGE
FLR FLOOR
FO FACE OF
FP FULL PENETRATION
FS FOOTING STEP, FAR SIDE
FTG FOOTING
GA GAGE, GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GL GLUED LAMINATED, GLULAM
GND GROUND
GR GRADE
GT GIRDER TRUSS
GYP BD GYPSUM BOARD
HAS HEADED ANCHOR STUD
HD HOLDOWN
HDG HOT-DIP GALVANIZED
HDR HEADER
HORIZ HORIZONTAL
HP HIGH POINT
HPTC HISTORIC PRESERVATION TRAINING
CENTER
HT HEIGHT
ID INSIDE DIAMETER
IF INSIDE FACE
INT INTERIOR, INTERMEDIATE
IT INVERTED TEE
JB JOIST BEARING
JST JOIST
JT JOINT
K KIPP (1,000 LBS)
LGS LIGHT GAGE STEEL
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LP LOW POINT
LSL LAMINATED STRAND LUMBER
LT LIGHT
LVL LAMINATED VENEER LUMBER
MACH MACHINE
MASY MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURE, -ER, -ED
MIN MINIMUM
ML MICROLLAM (TRUS-JOIST BRAND LVL)
MO MASONRY OPENING
MTL METAL
N-S NORTH TO SOUTH
NF NEAR FACE
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
OCJ OSHA COLUMN JOIST
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
PAF POWDER ACTUATED FASTENER
PC PRECAST
PCF POUNDS PER CUBIC FOOT
PE PRE-ENGINEERED
PEN PENETRATION
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUND PER LINEAR FOOT
PNL PANEL
PP PANEL POINT
PS PRESTRESSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .