This document is a summary of a site visit and questions and answers for a solicitation to replace the water storage tank at Lassen Volcanic National Park headquarters in California.
The key details are:
- The solicitation number is 140P8424R0006 for the "Replace HQ Water Tank, NPS-LAVO" requirement.
- A site visit was conducted on June 4, 2024, with attendees meeting at the park headquarters. The project involves replacing two 67,000-gallon water storage tanks for a total capacity of 134,000 gallons.
- Questions from the site visit and submitted via email cover topics such as soil/excavation management, tree removal, water source and usage, tank specifications, existing conditions, and other construction details. Several specification sections are referenced.
- This is a new requirement, with no incumbent contractor currently performing these services.
- The solicitation includes attachments for the specifications, wage determination, site visit sign-in sheet, and amended provisions and clauses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Attachment_3_Wage_Determination_14Jun2024_0003.pdf | ||
| B08_Attachment_1_Specifications_LAVO_323565_Amendment_3_0003.pdf | ||
| Sol_140P8424R0006_Amd_0003.pdf | ||
| B08_Attachment_5_Site_Visit_Sign-In_Sheet_LAVO_323565_0003.pdf | ||
| B08_Attachment_7_140P8424R0006_Provisions_and_Clauses_Rev_03Jul2024_0003.pdf | ||
| Sol_140P8424R0006_Amd_0002.pdf | ||
| Sol_140P8424R0006_Amd_0001.pdf | ||
| Sol_140P8424R0006.pdf | ||
| B08_Attachment_4_Proposal_Submission_Package.pdf | ||
| B08_Attachment_1_Specifications_LAVO_323565.pdf | ||
| B08_Attachment_3_Wage_Determination.pdf | ||
| B08_Attachment_2_Drawings_LAVO_323565.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LASSEN VOLCANIC NATIONAL PARK
REPLACE WATER STORAGE TANK AT
MINERAL HEADQUARTERS
PMIS No. 323565
AMENDMENT NO. 0003
NATIONAL PARK SERVICE
PACIFIC WEST REGION
JULY 2024
Solicitation 140P8424R0006, Attachment 6, Site Visit Notes, Q-A & Amendment 3 Summary
SITE VISIT SUMMARY:
A pre-proposal site visit was conducted on June 4, 2024. Participants met at 10:00 a.m. Pacific Daylight Time (PDT) at Lassen Volcanic National Park (LAVO) Headquarters area. Headquarters for LAVO is located approximately 40 miles east of Red Bluff California and 30 miles west of Chester, CA on state Hwy 36. The initial meeting spot was at the parking lot of LAVO's main HQ building. Introductions were made between NPS staff and attendees, sign in sheets filled out, and site visit question sheets were passed out to all. Prior to visiting to the site, Buildings/Utilities Supervisor and project COR Preston Marfuta gave instructions on proper protocol for RFI’s post visit and how questions would be answered during the visit. Afterwards, site visit attendees followed Preston Marfuta and Water Treatment Operator Stephen Cole to the parking area around the treatment building, the project scope was reviewed, and the site visit attendees were given an opportunity to ask any initial questions. A walk up to the existing tanks was made along the access route so that all had the chance to observe site conditions and access route. Once at the top and at the site, the existing tank and any visible appurtenances were viewed. The site visit concluded at approximately 12:00 Noon.
PROJECT QUESTIONS FROM SITE VISIT:
1. Question: What do we do with excavation soil? Answer: See Specification Section 31 10 10 – 2 SITE CLEARING, Stockpile topsoil where directed by Park Staff. Stockpile onsite for use for backfilling. As per specifications, cover to prevent erosion and loss.
2. Question: What is the consistency of finished soil? Answer: See Specification Section 31 22 00: 3.2/A-C Loosen top 2 inches, remove anything over 2 inches. 3.3/C- Make finished surface free of stones, sticks or other material 1 inch or more in any dimension.
3. Question: What to do with Hazard trees outside the footprint of worksite and drawings?
Answer: Trees outside the footprint are not within the scope of this project.
4. Question: Water usage/source/cost? Answer: The NPS intends to install a raw water hydrant adjacent to the water plant prior to construction. Specifications call for uninhibited and free use of water in 01 50 00 Temp Facilities. 1.3 Use Charges - Water Service:
Potable Water from existing water system is available for use without metering and without payment of use charges. COR Note: We do not have the ability to provide a consistent stream of potable water for construction activities. We can provide potable water at times such as commissioning etc. LAVO intends to install a raw water fire suppression hydrant that the NPS will provide access as free to use for construction activities.
PROJECT QUESTIONS RECEIVED VIA EMAIL:
5. Question: We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. Answer: This is a new requirement.
6. Question: What gallon size is this water tank? Answer: See Specification Section 33 16 13 Glass Fused Steel Water Tank which 2.2 TANK CAPACITY: A. Both tanks shall have an operating capacity to overflow point of at least sixty-seven thousand (67,000) gallons (nominal, U.S. gallons). (2 tanks at 67,000; totaling 134,000 gallons).
7. Question: Will a factory powder coated bolted steel tank be acceptable for this project in lieu of a glass fused steel water tank? Answer: No. A powder coated bolted steel tank does not meet the required specifications for this project.
8. Question: United Industries Group, Inc. respectfully request to be added to the specification section 33 16 13 – GLASS FUSED STEEL WATER TANK via an addendum.
United Industries Group, Inc. is a design committee team member of AWWA D103std.
tanks. We have designed and installed AWWA D103std glass-fused-to-steel tanks nationwide. UIG is ISO9001 certified and is listed on NSF website as approved and in full compliance with NSF61 and NSF372 standards. Link to UIG listing with NSF online.
http://info.nsf.org/Certified/PwsComponents/Listings.asp?Company=C0378776&Standard=061 UIG Inc. owns multiple sets of hydraulic tank jacking systems and employs multiple our own factory trained tank installation crews. UIG Inc. will perform the tank erection and not a subcontractor or a dealer. The tank will be on site 15-weeks after approval of drawings.
Answer: The section for preapproved suppliers will not be updated in specification section 33 16 13. While United Industries Group appears qualified for glass fused tank fabrication, NPS is unable to confirm that United Industries Group glass-fused lined tank experience in the USA conforms with the Buy American statute for all construction materials required for this project. This project requires manufacturers with ten or more years of experience, with tank construction materials conforming to the specifications and the Buy American statute.
9. Question: In the specifications I cannot locate the liquidated damages. Can you confirm what the liquidated damages are? Answer: Liquidated damages do not apply to this contract.
10. Question: Specification Section 33 16 13.13, Subsection 2.3 - D. Tank Design Loads mentions Roof Snow Load: (In accordance with Chapter 7 of ASCE 7 & The Snow Load Analysis for California) must be considered by the tank design loads. Tank Manufacturer would like to know if there are any case studies on ground snow loads as mentioned in Chapter 7. Answer: Online searches can provide snow load analysis to the public.
Additionally, the NPS recommends that all offerors contact NOAA for area specific studies.
Lassen National Park experiences some of the highest annual snow fall averages within the United States. It is the responsibility of the offeror and their engineers to do their due diligence to make all related calculations which must be in-line with IBC and any current industry standards.
11. Question: Can a plan sheet depicting just the existing topography be added? The tanks and design grades obscure the existing grades. Answer: The NPS has provided Topo maps that are accurate to the best of our knowledge. Any variations are to be confirmed by the offeror/successful contractor at no expense to the government. Specific language is provided in the specifications. Review all specs and focus on Glass Tank Sections for additional requirements. Attached are zoomed in screen shots with arrows to point out where the topo lines travel through the overlay tank drawings. After award, the Civil3D shape file can be provided to the successful contractor.
12. Question: Will a water source be provided? Answer: The temporary services section of the specifications provides that water will be available. Depending on contractor usage and distribution impacts, the NPS reserves the right to provide raw water from a hydrant adjacent to the treatment building for non-distribution system construction work. Treated potable water will be provided by the NPS for all testing requirements. The raw water hydrant will be clarified post-award and may be the most convenient construction utility service for all parties.
13. Question: Potable water will have to be made available for testing. Please provide nearest fire hydrant location? Can water be disposed on site after testing? The volume is 134,000 gallons. Answer: Potable water will be available. Raw water may be available for non-testing purposes. Please refer to pipe testing sections and all environmental controls required. Disposal of chlorinated water above allowable standards is forbidden until such time residuals fall below.
14. Question: Section 31 22 13 “Rough Grading” does not contain a field quality control section. As per sheet C-003 of the drawings there is a cut fill requirement for the new tank pad. Will compaction testing be required for the tank embankment? Please confirm.
Answer: Thoroughly review the following Division 31: Section 32 12 33.3.5 Compaction, Section 31 22 19 Topsoiling & Finished Grade and Section 33 16 13.13 - Glass Fused Steel Water Tank.
15. Question: Your attention is directed to Section 32 32 23 -2.01 A. There it states, “Basis of design: Integrity Retaining Wall Units as manufactured by County Materials Corporation.”
Our proposed manufacturer is Versa Lok. Please confirm this is acceptable? County
Materials Corporation serves the Mid West and Great lakes areas of the USA. Freight would be in excess. Versa Lok is in California. Answer: The Government will consider successful contractor-provided supporting data for any proposed "approved equal" items during the post-award submittal process as outlined in the specifications. Refer to County Materials Corporations industry-provided specification to compare prior to submitting your proposal.
16. Question: Your attention is directed to Section 32 32 23 -2.01 F. There is a requirement to perform compression strength tests conforming to the saw cut coupon provisions of ASTM C 140. We request that field strength test be eliminated? We will provide in house laboratory tests that meet the intent of the specification. Answer: Deviations from any specification testing requirement will not be entertained. Refer to Section 33 16 13 for additional engineering requirements.
17. Question: Your attention is directed to Section 32 23 -2.01 B. There it states, “color of SRW units shall be determined by the park.” Our proposed manufacturer Versa Lok will only supply gray or tan in the quantities your project. Please confirm gray or tan is acceptable? Answer: Gray or tan are potentially acceptable colors. Final color submittal for NPS review and approval will have to be provided post-award during the construction submittal period.
18. Question: What modifications will be allowed on the existing access road? To access the new tank site / existing tank location, the road will need to be leveled and graded. The road will be in a better condition upon project completion. Please consider. Answer: Yes, this is addressed under CLIN 2 (Site Preparation & Grading). Additional specifications can be found in section 32 16 00 - RESTORATION OF SURFACES.
NOTE: This Amendment 0003 revises the above-referenced Specification 32 16 00, 3, A.
to remove the sentence, “The repaving of asphalt surfaces is a Bid Option.”
19. Question: Are earthwork cross sections available for the new tank placement locations.
Please provide. Answer: No. Please refer to Specification 33 16 13 requirements.
20. Question: Will there be an engineer assigned to this solicitation before the due date of proposals? Answer: No.
21. Question: Your attention is directed to section 31 10 10 “Site Clearing.” Will stumps have to be removed from the project site? Answer: Yes.
22. Question: Your attention is directed to section 31 12 33-3.3 A “Utility Trenching and Backfilling.” There it describes the trench width and depth if rock is encountered. How is this trench excavation paid for? Rock Excavation. Answer: Excavation is paid for under the CLIN of the component required excavation.
23. Question: Your attention is directed to section 31 22 13 “Rough Grading.” There will be borrow material needed to construct the grades and contours as required. The footprint of the tanks will be placed on embankment. Please add a section in the specification on the type and gradation of borrowed material to complete construction. Answer: Please search the specifications PDF for Backfill, backfilling, finished grade, etc. Multiple sections cover these specifications.
24. Question: Your attention is directed to sheet C-002 of the construction drawings. This is the New Tank Site Plan. Please provide elevations for existing contours so fill volumes can be calculated. Answer: Elevations are provided on C-001, C-002. and C-003.
Correlations can be made from these diagrams, and it is the responsibility of the offeror to field verify elevations.
25. Question: We apologize for missing the initial organized site visit for this project on Tuesday June 4th. We would like to request for site access. Answer: While we are not offering additional site visits, you may view the publicly available site on your own.
26. Question: Your attention is directed to section 33 16 13.13 “Glass Fused Steel Water Tank.” Subsection 1.1 H reads, “A site-specific preliminary foundation drawing of the tank foundation showing dimensions and reinforcing steel shall be supplied with bid proposal.
The preliminary drawing shall be from an engineer or engineering firm holding a current engineering stamp in the state in which the project resides. Preliminary Foundations from contractors or non-engineering entities shall be rejected. Please consider eliminating the requirement for an engineering firm holding a current engineering stamp. We will provide a preliminary drawing. Answer: Specification Section 33 16 13.13, Subsection 1.1 H has been revised via this Amendment 0003 to indicate this will be required during the post-award submittal process (offerors will not be required to submit the CA engineer stamped submittal with their proposal).
27. Question: Your attention is directed to sheet C-002 of the construction drawings. There is a note that reads “protect existing tank upon completion abandon in place by filling with sand. Seal all access lids. How large is the existing tank so we can determine the volume of sand? Answer: Approximately 120,000 gallons.
28. Question: Your attention is directed to sheet C-010 of the construction drawings. There is shown the typical pipe trench detail. This detail is relative to water main/service as the minimum cover over the pipe is 36 “Please add a detail for an electrical trench as there is 600 lineal feet of 1 ½ “electrical conduit to place? Answer: Trenching requirements are covered in 31 12 33 Part 3 Trenching and Excavation "Execution." Additionally, the successful contractor is expected to be experienced and able to comply with all applicable building codes.
29. Question: Your attention is directed to sheet C-002 of the construction drawings. Please confirm the diameter of the inlet piping? The inlet piping that connects the existing 4-inch watermain to the new tanks. Please confirm the diameter and connection types of the 3 gate valves that separate water flow at the new inlet piping. Are the valves flanged or mechanical joint? Also, confirm the diameter of each 90-degree elbow as well. The elbows for the Westside and Eastside tanks. Answer: Refer to sheet C-005 and the notes for additional information.
30. Question: The description for CLIN 0008, Construct Electrical Conduit in Section 01 27 00 calls for the contractor to construct the electrical conduit as shown in the plans, including the handholes. The plans only show the conduit as 1-1/2” electrical conduit for future switch. What type of material is the conduit, PVC? Are any connections required at the tanks or water treatment plant? Is any wire to be placed? Answer: Schedule 40 grey PVC.
31. Question: The tank manufacturer is California Aquastore ( CST ) or approved equal. One of their standard terms and conditions is the site will be reasonably flat and level without obstructions with unrestricted access including access for 53 foot flatbed trailers for tank delivery. Will the contractor of record be allowed to unload these flatbed trailers near the park headquarters building then move the steel tank material on pallets to the tank site ?
This area in question will be needed for 3 weeks. Answer: Yes, NPS will provide an unload/storage location during construction.
32. Question: The typical tank profile is shown on drawing sheet number 7, sub sheet C-
005. There is a note that reads, “reinstall pressure transducer.” There is one (1) existing underground concrete water storage tank therefore, only one (1) transducer. We are placing two (2) new glass fused water tanks. We will need two (2) transducers. We recommend two (2) NEW transducers or at a minimum add the requirement for one (1) new transducer for one of the new water tanks. Please consider? Answer: There are currently two separate underground tanks which are cross connected in a similar manner as the proposed above ground tanks. As is, one (1) transducer meets the needs of the park. The additional manual level indicators function as a backup.
33. Question: On drawing sheet C-005 there is a check valve but there is no specification.
Please provide? Answer: A 4-inch check valve is in gray. Final approval after all consultations with tank manufacturer and submittals. Refer to Tank specification section requirements and C-005 notes.
34. Question: I believe that the scale on sheet C-001 is not correct as when you use the listed scale for the conduit takeoff it does not reflect actual lineal footage require. Answer: Please carefully read the notes on G-002. Specifically, notes 8 and 9. All verifications are the offeror’s/contractor’s responsibility alone.
SUMMARY OF AMENDMENT 0003 ITEMS:
The offeror shall make the following changes, modifications and additions to the pertinent sheets, pages and paragraphs of the specifications and drawings, and shall take the same into consideration in the proposed prices:
1. Revised specification sections
a. 32 16 00:
3.1.A (Asphalt and Aggregate Base Surfaces), remove the sentence, “The repaving of asphalt surfaces is a Bid Option.”
b. 33 16 13:
1.1.H, Offerors will not be required to submit the CA engineer stamped submittal with their proposal; this will be required during the post-award submittal process.
2. Updated provisions and clauses
a. Section G is updated as follows:
Update date of IPP Clause (FEB 2021)
b. Section I is updated as follows:
Remove FAR 52.204-4, Printed or Copied Double Sided on Postconsumer Fiber Content Paper (MAY 2011)
Add full-text version of FAR 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021)
Update date of FAR 52.219-6, Notice of Total Small Business Set-Aside
(NOV 2020)
Update date of FAR 52.219-8, Utilization of Small Business Concerns
(SEP 2023)
Update date of FAR 52.219-28, Post Award Small Business Program Rerepresentation (SEP 2023)
Moved from full text to Incorporate by Reference (IBR): FAR 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020)
Update date of FAR 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2024)
Delete 52.223-6, Drug-Free Workplace (MAY 2001) and replace with 52.226-7, Drug-Free Workplace (MAY 2024)
Delete 52.223-15, Energy Efficiency in Energy-Consuming Products
(MAY 2020)
Delete 52.223-17, Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (Aug 2018)
Delete 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) and replace with 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving
(MAY 2024)
Update date of 52.223-21, Foams (MAY 2024) Delete 52.228-11, Individual Surety—Pledges of Assets (FEB 2021) from
IBR and replace with full-text version of 52.228-11, Individual Surety— Pledges of Assets (FEB 2021) (DEVIATION MAY 2023)
Delete 52.228-15, Performance and Payment Bonds-Construction (JUN 2020) from IBR and replace with full-text version of 52.228-15, Performance and Payment Bonds-Construction (JUN 2020)
(DEVIATION MAY 2023)
Update FAR 52.244-6, Subcontracts for Commercial Products and Commercial Services (FEB 2024)
Add full-text FAR 52.252-6, Authorized Deviations in Clauses (NOV 2020)
c. Section J is updated to include the following new attachments:
B08_Attachment_1_Specifications_LAVO_323565_Amendment_3.pdf
B08_Attachment_3_Wage_Determination_14Jun2024.pdf B08_Attachment_5_Site Visit Sign-In Sheet_LAVO_323565.pdf B08_Attachment_6_Site Visit Notes_Q-A_Amendment_3_Summary.pdf
B08_Attachment_7_140P8424R0006_Provisions_and_Clauses_Rev_0 3Jul2024.pdf
d. Section K is updated as follows:
Update FAR 52.204-8, Annual Representations and Certifications (MAY
2024)
e. Section L is updated as follows:
Minor language updated for clarity Add full-text version of FAR 52.201-1, Acquisition 360: Voluntary Survey
(SEP 2023)
--END OF NOTES--