A06_ATT_6_REVISED_-_Drawings_CHIS_HQ_Drive_0001.pdf

PDF 3 MB Posted

Attached to
CHIS - REPLACE HQ DRIVE WITH CONCRETE Federal contract opportunity
Solicitation number
140P8424Q0087
Issued by
Department of the Interior National Park Service

About this file

This document contains construction drawings for a project at Channel Islands National Park to demolish and replace the existing asphalt paving in the headquarters parking lot with 6-inch thick concrete paving, as well as replace the non-compliant handrail on the accessible ramp. The project includes approximately 10,675 square feet of concrete paving work and 120 linear feet of new handrail. The National Park Service has issued a firm-fixed-price solicitation under NAICS code 238990 for this requirement, which is a total small business set-aside with an estimated value between $100,000 and $250,000. A site visit is scheduled for July 17, 2024, and quotations are due by the date specified in the solicitation. The government will evaluate proposals based on price and other factors outlined in the Request for Quotation.

View the file

Other files for this federal contract opportunity

Other files attached to CHIS - REPLACE HQ DRIVE WITH CONCRETE, newest first.
File Type Posted
Sol_140P8424Q0087_Amd_0002.pdf PDF
Questions_and_Answers_CHIS_HQ_Drive_140P8424Q0087_0002.pdf PDF
Sol_140P8424Q0087_Amd_0001.pdf PDF
B11_Site_Visit_Sign_In_Sheet_0001.pdf PDF
A06_ATT_2_Drawings_CHIS_HQ_Drive.pdf PDF
B08_Solicitaiton_ATT_5_140P8424Q0087_Bid_Bond_SF24.pdf PDF
B08_Solicitation_ATT_4_Tech_Info_Form_140P8424Q0087.pdf PDF
Sol_140P8424Q0087.pdf PDF
ATT_3_DBA_Wage_Determinations_CHIS_HQ_Drive.pdf PDF
A06_ATT_1_Specifications_CHIS_HQ_Drive.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHANNEL ISLANDS NATIONAL PARK, VENTURA, CA

COVER SHEET

PMIS 185464 – SHEET 1 OF 6

NOTES:

1. PROJECT LOCATION: PARKING LOT OF THE CHANNEL ISLANDS NATIONAL PARK:

1901 SPINNAKER DRIVE, VENTURA, CA 93001.

2. ACTUAL DIMENSIONS RELATING TO THE WORK SHALL BE FIELD VERIFITED BY THE

CONTRACTOR.

3. PROTECT ALL EXISTING FACILITIES AND UTILITIES EXCEPT FOR THOSE

DESIGNATED IN THE CONSTRUCTION DOCUMENTS TO BE DEMOLISHED.

4. CONTRACTOR SHALL BE REQUIRED TO REPAIR ANY FACILITIES/UTILITIES

DAMAGED OR BROKEN BY THE CONTRACTOR IN PERFORMING THE CONTRACT.

5. CONTRACTOR SHALL FILE & SUBMIT A NOTICE OF INTENT (NOI) ALONG WITH AN

UNDER-AN-ACRE STORM WATER POLLUTION PREVENTION PLAN.

6. CONTRACTOR MUST FOLLOW THE CONSTRUCTION DOCUMENTS IN CARRYING

OUT THE WORK UNDER THE CONSTRUCTION CONTRACT.

CONSTRUCTION DRAWINGS

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

INTERIOR REGIONS 8, 9 ,10, & 12

SHEET INDEX

SHEET# SUBSHEET TITLE OF SHEET

1 (NA) COVER SHEET

2 G1 DEMOLITION PLAN

3 C1 CONCRETE PAVING PLAN

4 C2 PARKING AREA DRAINAGE PLAN

5 C3 ENTRY ROAD DRAINAGE PLAN

6 C4 ACCESIBLE PARKING SPACES

& ACCESS AISLE

REPLACE ASPHALT WITH CONCRETE AT HQ PARKING LOT

APPROVED FOR CONSTRUCTION

BY REGIONAL CIVIL ENGINEER,

STEVEN L. BOSILJEVAC, P.E.

MAY 7TH, 2023

FIG 1. DEMOLITION OF EXISTING ASPHALT PAVING AND EXISTING HAND RAIL ON ACCESS RAMP

DEMOLITION PLAN

PMIS 185464 – SHEET 2 OF 6 SUBSHEET G1 05/07/2023

NOTES:

1. DEMOLISH (E) HANDRAIL ON ACCCESS RAMP – APPROXIMATELY 120 LF.

2. DEMOLISH (E) ASPHALT PAVING IN THE HEADQUARTERS (HQ) PARKING LOT

AND NPS ACCESS ROAD TO THE PARKING LOT WITHIN THE AREA DESIGNATED BY

THE RED BOUNDARY LINE IN FIGURE 1. FIELD VERIFY THE AREA OF (E) ASPHALT

PAVING. APPROXIMATE AREA OF (E) ASPHALT IS 10,675 SF.

3. THE (E) CONCRETE CURB & GUTTER TO REMAIN IN PLACE. IF THE (E) CONCRETE

CURB & GUTTER IS DAMAGED BY THE CONTRACTOR DURING THE DEMOLITION OF

THE (E) ASPHALT THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS AND/OR

REPLACEMENT OF THE DAMAGED CURB & GUTTER.

4. THE (E) CONCRETE SWALES WITHIN THE HQ PARKING CAN REMAIN OR BE

DEMOLISHED (AND THEN REPLACED) AT THE DESCRETION OF THE CONTRACTOR,

EXCEPT FOR SPECIFIC (E) CONCRETE SWALES DESIGNATED FOR DEMOLITION IN

THE CONSTRUCTION DRAWINGS.

5. THE CONCRETE DRAIN STRUCTURE IN THE HQ PARKING LOT (DETAILED ON

SHEET ? MUST REMAIN IN PLACE AND MUST NOT BE DAMAGED. THE RIM

ELEVATION OF THIS DRAIN STRUCTURE REPRESENTS THE LOWEST ELEVATION IN

THE PARKING LOT.

6. THE NPS WILL REMOVE ALL VEHICLES AND OTHER ITEMS AND EQUIPMENT

FROM THE PARKING AREA PRIOR TO THE CONTRACTOR INITIATING DEMOLITION

ACTIVITIES.

CONSTRUCTION DRAWINGS

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

INTERIOR REGIONS 8, 9 ,10, & 12

D

EM

O

LISH

(E) ASPH

ALT

1. (E) ASPHALT PAVING LAYER TO BE DEMOLISHTED.

2. (E) SUBBASE LAYER, IF PRESENT, TO BE REMOVED AS

NECESSARY TO ALLOW FOR NEW CONCRETE PAVING.

3 3. EXCAVATE NATIVE SOIL AS NECESSARY TO ALLOW

FOR NEW CONCRETE PAVING.

REPLACE ASPHALT WITH CONCRETE AT HQ PARKING LOT

DETAIL: PROFILE OF CONCRETE PAVEMENT/SUBBASE/SUBGRADE

PHOTOGRAPH 1. (E) DAMAGED CONCRETE SWALE TO BE DEMOLISHED

& REPLACED. (E) STORMWATER DRAIN CAN BE SEEN IN THE BACKGROUND.

APPROVED FOR CONSTRUCTION

BY REGIONAL CIVIL ENGINEER,

STEVEN L. BOSILJEVAC, P.E.

MAY 7TH, 2023

clairelewis Callout New project area will include additional 112 square feet as outlined by blue box.

FIG 2. INSTALLATION OF NEW CONCRETE PAVING IN HQ PARKING LOT AND INSTALLATION OF NEW HAND

RAIL ON ACCESS RAMP

CHANNEL ISLANDS NATIONAL PARK, VENTURA, CA

CONCRETE PAVING PLAN

PMIS 185464 – SHEET 3 OF 6 SUBSHEET C1 05/07/2023

NOTES:

1. (N) CONCRETE PAVING CONSTRUCTION WITHIN THE LIMITS DEFINED BY THE

BLUE BORDER LINE IN FIGURE 2 TO BE IN ACCORDANCE WITH ACI 330.1.

2. CONCRETE 28-DAY STRENGTH MUST BE GREATER THAN 3000 PSI.

3. THE TOP OF (E) CONCRETE GUTTER SHALL BE USED TO ESTABLISH THE TOP OF

CONCRETE PAVEMENT ADJACENT TO THE GUTTERS SO AS TO MAINTAIN SURFACE

WATER DRAINAGE TO THE (E) STORMWATER DRAIN IN THE PARKING AREA.

4. THE THICKNESS OF CONCRETE PAVEMENT MUST BE A MINIMUM OF 6 INCHES.

5. THE SPACING OF JOINTS (CONSTRUCTION & ISOLATION) SHALL NOT BE SPACED

AT GREATER INTERVALS THAT 15 FEET IN ANY DIRECTION. ASPECT RATIO OF (N)

CONCRETE PANELS MUST NOT EXCEED 1:1.5. “T” PANELS OR “L” PANELS WILL

NOT BE ALLOWED.

6. CHECKERBOARD CONCRETE PANEL POUR SEQUENCING WILL NOT BE ALLOWED.

7. MATCH JOINTS IN (N) CONCRETE PAVING WITH (E) JOINTS IN GUTTERS/CURBS.

8. USE ISOLATION JOINTS BETWEEN (N) CONCRETE PAVING AND (E) CONCRETE

FLATWORK.

9. (N) CONCRETE PAVING TO HAVE EITHER BURLAP DRAG FINISH OR BROOM

FINISH.

10. PAINT NEW WHITE PARKING PLACE LINES AFTER THE (N) CONCRETE PAVING

HAS PROPERLY CURED. REFER TO SHEET 6 OF 6 FOR PAINTING OF ACCESIBLE

PARKING PLACES AND ACCESIBLE AISLE.

11. INSTALL (N) HAND RAIL ON THE RAMP THAT PROVIDES ACCESS TO THE HQ

BUILDING. THE (N) HAND RAILS MUST BE COMPLIANT WITH CHAPTER 5: GENERAL

SITE AND BUILDING ELEMENTS, SUBPART 505 HANDRAILS. POSTS AND RAILS

SHALL BE EXTRUDED 6063-T6 ALUMINUM 1.5” SCHEDULE 40 PIPE SIZE; ELBOW

EXTRUDED FROM 6063-T4; AND RAILING ACCESSORIES CAST FROM 713 ALLOY;

WITH ALL FASTENERS USED IN THE SYSTEM BEING EITHER ALUMINUM OR

STAINLESS STEEL. RAILING SHALL HAVE A MILL FINISH.

CONSTRUCTION DRAWINGS

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

INTERIOR REGIONS 8, 9 ,10, & 12

(N

) CO

N

CRETE PAVIN

G

(N) HAND RAIL

1. (N) CONCRETE PAVING TO BE INSTALLED – 6 INCHES THICK.

2. SUBBASE LAYER, IF PRESENT, CAN HAVE (N) CONCRETE

PAVING INSTALLED ON TOP OF IT IF PROPERLY COMPACTED.

3 3. IF NO SUBBASE PRESENT, (N) CONCRETE PAVING TO BE

INSTALLED ON PROPERLY COMPACTED SUBGRADE.

REPLACE ASPHALT WITH CONCRETE AT HQ PARKING LOT

DETAIL: PROFILE OF CONCRETE PAVEMENT/SUBBASE/SUBGRADE

APPROVED FOR CONSTRUCTION

BY REGIONAL CIVIL ENGINEER,

STEVEN L. BOSILJEVAC, P.E.

MAY 7TH, 2023

clairelewis

FIG 3. PARKING STALLS AREA OF HQ PARKING LOT – DRAINAGE PLAN

PARKING AREA DRAINAGE PLAN

PMIS 185464 – SHEET 4 OF 6 SUBSHEET C2 05/07/2023

NOTES:

1. THE TOP OF (E) CONCRETE GUTTER SHALL BE USED TO ESTABLISH THE TOP

OF CONCRETE PAVEMENT ADJACENT TO THE GUTTERS SO AS TO MAINTAIN

SURFACE WATER DRAINAGE TO THE (E) STORMWATER DRAIN IN THE PARKING

AREA. THE (E) STORMWATER DRAIN LOCATION IS SHOWN IN FIGURE 3 & IN

PHOTOGRAPH 1.

2. CONTOUR CONCRETE PAVING TO PREVENT LOW AREAS WHERE WATER

WILL POND.

CONSTRUCTION DRAWINGS

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

INTERIOR REGIONS 8, 9 ,10, & 12

GENERAL DIRECTION OF

STORMWATER FLOW ON THE

SURFACE OF THE PARKING LOT

LEGEND

REPLACE ASPHALT WITH CONCRETE AT HQ PARKING LOT

PHOTOGRAPHS 2 (LEFT) & 3 (RIGHT). (E) CONCRETE STORMWATER DRAIN WTH

TRAFFIC-RATED STEEL DRAIN COVER GRATE.

APPROVED FOR CONSTRUCTION

BY REGIONAL CIVIL ENGINEER,

STEVEN L. BOSILJEVAC, P.E.

MAY 7TH, 2023

clairelewis

FIG 4. ENTRY ROAD TO HQ PARKING LOT – DRAINAGE PLAN

ENTRY ROAD DRAINAGE PLAN

PMIS 185464 – SHEET 5 OF 6 SUBSHEET C3 05/07/2023

NOTES:

1. THE TOP OF (E) CONCRETE GUTTER SHALL BE USED TO ESTABLISH THE TOP

OF CONCRETE PAVEMENT ADJACENT TO THE GUTTERS SO AS TO MAINTAIN

SURFACE WATER DRAINAGE TO THE (E) STORMWATER DRAIN IN THE PARKING

AREA. THE (E) STORMWATER DRAIN LOCATION IS SHOWN IN FIGURE 4.

2. CONTOUR CONCRETE PAVING TO PREVENT LOW AREAS WHERE WATER

WILL POND.

CONSTRUCTION DRAWINGS

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

INTERIOR REGIONS 8, 9 ,10, & 12

GENERAL DIRECTION OF

STORMWATER FLOW ON THE

SURFACE OF THE PARKING LOT

LEGEND

REPLACE ASPHALT WITH CONCRETE AT HQ PARKING LOT

PHOTOGRAPH 4. ENTRY ROAD TO HQ PARKING AREA

APPROVED FOR CONSTRUCTION

BY REGIONAL CIVIL ENGINEER,

FIG 5. ACCESSIBLE PARKING ZONE

ACCESSIBLE PARKING SPACES & ACCESS AISLE

PMIS 185464 – SHEET 6 OF 6 SUBSHEET C4 05/07/2023

NOTES:

1. THE ZONE FOR THE ACCESSIBLE PARKING SPACES AND ACCESS AISLE IS

IDENTIFIED IN FIGURE 4 WITHIN THE BLUE RECTANGLE.

2. THE ACCESSIBLE PARKING SPACES AND ACCESS AISLE SHALL CONFORM TO THE

ARCHITECTURAL BARRIERS ACT STANDARDS (LATEST EDITION), CHAPTER 5.

3. THE ACCESSIBLE PARKING SPACES AND ACCESS AISLE SHALL BE PAINTED IN

BLUE ACCORDING TO THE NPS MARKING STANDARDS. SIGNAGE SHALL BE POSTED

THAT INDICATES THE ACCESSIBLE PARKING SPACES AND ACCESS AISLE ARE

RESERVED FOR PERSONS WITH DISABILITIES ONLY.

CONSTRUCTION DRAWINGS

UNITED STATES

DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

INTERIOR REGIONS 8, 9 ,10, & 12

REPLACE ASPHALT WITH CONCRETE AT HQ PARKING LOT

APPROVED FOR CONSTRUCTION

BY REGIONAL CIVIL ENGINEER,

File details come from the government source that posted it. Updated .