This document is a Dust Control and Air Quality Monitoring Plan for the Lassen Volcanic Park Dixie Fire Cleanup project. It outlines the dust control measures, worker exposure monitoring, and worksite air quality monitoring that will be implemented during the debris removal operations.

The plan references the Statement of Work for the Hazard Assessment and Soil Remediation project and the Debris Removal Operation Plan. It provides details on the specific sites to be cleaned up, including the Drakesbad Water Treatment Plant, Kelley Cabin, and various boardwalks. The plan addresses the monitoring and control of potential hazards such as crystalline silica, lead, asbestos, and other metals. It specifies the monitoring methods, sampling procedures, and exposure limits to be followed. The plan is supplementary to the overall Debris Removal Operation Plan for the Lassen Volcanic Park Dixie Fire Cleanup.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

http://www.xrfresearchinc.com;info@xrfresearch.comPage 1 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

Dust Control and Air Quality Monitoring Plan

Lassen Volcanic Park Dixie Fire Cleanup

Address: 38050 Highway 36 E, Mineral, CA 96061 (NPS Headquarter)

Prepared by: XRF Research Inc.

Prepared for: FedVet Construction, Inc

Date of Report December 12, 2022

http://www.xrfresearchinc.com;info@xrfresearch.comPage 2 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

December 12, 2022

Edgar DeLeon, President, Fedvet Construction

Re: Air Quality Monitoring Plan, Lassen Volcanic Park Fire Cleanup

Dear Mr. DeLeon,

Thefollowingdustcontrolandairmonitoringworkplanisbasedon
specificationsinthedocumententitled“140P8422Q0158Attachment01-
StatementofWork,HazardAssessmentandSoilRemediation”(“SOW”or
“StatementofWork”).ThisisrelatedtoDixiefiredebriscleanupoperations
intheLassenVolcanicNationalPark(LAVO),expectedtotakeplacein2023.
Someoftheproposedairborneexposureassessmentsarebasedonfindings
fromthesitecharacterizationcarriedoutinOctober2022andsummarizedin
thedocumententitledFireCleanupProject,LassenVolcanicPark,PhaseISite
VisitReportdatedNovember30,2022(“SiteVisitReport”).
TheworkplanbelowissupplementarytotheDROP,thedocumententitled
DebrisRemovalOperationPlanforLassenVolcanicPark,DixieFireCleanup,
datedDecember11,2022.
Ifyouhaveanyquestionsregardingthesefindings,pleasefeelfreetocontact
meat858-243-5415.

Regards,

JavierGonzalez,Ph.D.,AshleyA.Allison
SeniorIndustrialHygienistCAC#10-680
http://www.xrfresearchinc.com;info@xrfresearch.comPage 3 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

TABLE OF CONTENTS

I. Project Overview 4

II. Dust Control Measures 5

III. Worker Exposure Monitoring 7

IV. Worksite Air Quality Monitoring 11

http://www.xrfresearchinc.com;info@xrfresearch.comPage 4 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

I. Project Overview

Thefollowingdocumentisanoperationsplanfordustcontrolandair
monitoringtobedoneduringtheexpectedcleanupoffireashanddebrisfrom
theDixiefire(July2021)thatdamagedanumberofpropertiesintheLassen
VolcanicNationalPark(LAVO),operatedbytheUSNationalParkService.Per
theSOWdocumentreferenceabove,therecommendedworkpracticesare
based,inpart,onthedocumententitledPlumasCountyFireDebrisRemoval,
Alternative(Private)DebrisRemovalProgram;BeckwourthComplexandDixie
Fires,September24,2021.
Theburnsitesareallinruralareas.Mostconsistofboardwalksconstructed
ofpressuretreatedwoodinwatershedormarshyareas,someaccessibleonly
onfoot.Threeofthesites,theDrakesbadWaterTreatmentPlant,Kelley
CabinatJuniperLake,andMt.HarknessLookoutandpittoilet,were
developedsiteswithpreviouslyexistingstructures.
Apre-worktripwasconductedonOctober2022tosurveytheburnsitesand
collectashandsoilforcompositionanalysis.Theresultsweresummarizedin
atripreportthathasbeenpreviouslysubmittedandreferencedinthecover
letterabove.SpecificationsfortheworkcanbefoundintheDROPdocument
above,subjecttotheHealth&Safetyplan,alsosubmittedseparately

Section II below has general specifications for dust control for the project.

SectionIIIhasasite-specificplanforexposuremonitoringofworkers.Thisis
basedonfindingsfromthesitecharacterizationthatarebothfromvisual
observationsandfromthewastecharacterizationfindingssummarizedinthe
tripreport.
SectionIVhasspecificationsforworksiteareamonitoringforairbornedust
andcontaminants.
http://www.xrfresearchinc.com;info@xrfresearch.comPage 5 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

II. Dust Control Measures

Dustmustbecontrolledatalltimesduringallfiredebriscleanupoperations.
Thespecificationsherearereferencedinthemainworkplanfortheremoval
work(“DROP”).

Nuisance dust control measures include:

• Control1-Waterintheformoramistorspraymustbeusedduringthe
cleanupworktopreventdustemissions.Eachareawhereashand
debrisaretoberemovedwillbepre-wateredwithafinespraynozzlein
advanceofinitiatingdebrisremovalandasneededduringtheremoval.
o Note:Thewatermustbeappliedinamannerthatdoesnot
generaterunoff.Whennecessary,engineeringcontrolsforstorm
waterdischargessuchastheuseofbarriersmustbeinplaceprior
todustcontroloperations.
• Control2-Allloadsshallbecoveredwithatarp;thisincludesmetal
andconcretedebris.Ashanddebrisloadsshallalsobefully
encapsulatedwith6to10Milpolyethyleneplastic(“burritowrap”

method).

o Inthecaseofloadsthatareclassifiedashazardouswaste,the
wastecontainersmustbelinedwiththeplasticsheeting,thentop
oftheloadshouldalsobeenclosedwiththesameplastic,withthe
tarpactingasasecondarybarrier.
• Control3-Allwastematerialthatisnotremovedattheendofeach
workdaywillbeconsolidated,sufficientlywetted,and/orcoveredto
preventtheoffsitemigrationofcontaminants.
• Control4-Allsoilsurfacesintheworksitethatappeartobevisiblydry
shouldbemoistenedwithwatertominimizetheformationoffugitive
dustemissionsduringthework.
http://www.xrfresearchinc.com;info@xrfresearch.comPage 6 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230
o Note:thewatershouldbedeliveredbymistingwithasprayerand
shouldbelimitedtoavoidpoolingorrunoff(“erosion”).
o Note:Uponcompletionofthecleanupoperations(includingthe
confirmatorysoilsampling),thefreshly-scraped(disturbed)soil
surfaceshouldbemoistenedwithasprayerbeforeitiscovered
withmulchpertheDROP.
• Control5–Whentravelingonunpaved(“dirt”)roads,thespeedshould
belimitedto15mph(milesperhour).
o Note:Maintainingaproperdistance(e.g.,50feet)inbetween
vehicleshelpsminimizeexposuretodusttotheoccupantsof
vehiclesthatarefollowing.
• Control6–Soiland/orashmustbecontainedattheworksiteand
duringtransportsotheydonotcontaminateroadwaysorneighboring
parcels,asthiscouldcreateanairbornehealthhazard.
o Theuseofblowerdevices,dryrotarybrushes,orbroomsfor
removalofcarryoutandtrackoutonpublicroadsisstrictly

prohibited.

http://www.xrfresearchinc.com;info@xrfresearch.comPage 7 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

III. Worker Exposure Monitoring

Thissectionpertainstotheworkerexposuremonitoring.Forthearea
monitoring,see§IV.WorksiteAirQualityMonitoring,below.
PersonalBreathingZoneMonitoringistobeperformedforworkersand
supervisorswhoareengagedinthefiredebriscleanupwork.Thisisdoneto
ensurecompliancewithOSHA/CALOSHAregulationsandforhealthand
safetyreasons.
Thehazardoussubstancesthataremonitoredforeachworksitedepend,in
part,onwhatwasobservedduringtheinitialsiteinvestigationandthe
analyticalresults.SeeTableIII-1,below.Specificpollutantsofconcernare
discussedbelow.
1.CrystallineSilicaandDust.Crystallinesilicaiscommoninbuilding
materialssuchassandstone,rock,concrete,brickandmortarandisreleased
intotheairfromoperationsusedinconstruction.Exposuretoairborne
crystallinesilicaofsmallparticlesizecausessilicosis,lungcancer,COPDand
kidneydiseaseandisregulatedbyOSHA.TherelevantCALOSHAregulations
areCCRTitle8,§1532.3,OccupationalExposurestoRespirableCrystalline
SilicaandtheFederalregulationsareCFR1910.1053,RespirableCrystalline

Silica.

• Thepermissibleexposurelimit(PEL)forrespirablecrystallinesilicais
50µg/m³basedonan8-hourTWA(timeweightedaverage)andthe
actionlevelis25µg/m³basedonan8-hourTWA.
• OSHAandCALOSHAregulationsrequirethatemployerscarryout
exposureassessmentsforemployeeswhomaybeexposedtorespirable
crystallinesilicaatorabovetheactionlevel.
• NuisancedustisclassifiedbyOSHAas“Particulates,nototherwise
Regulated(PNOR)”.ThePELforrespirabledustis5mg/m³basedonan
8-hourTWA.
http://www.xrfresearchinc.com;info@xrfresearch.comPage 8 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

Table III-1. Exposure Monitoring for the various Lassen burn sites

Site

ID

Structure Silica/Dust* Lead¶ Asbestos† Other¶

A Fire Lookout – Mt.

Harkness √ √ √ Copper

B§ Pit Toilet – Mt.

Harkness§

C

KelleyCabin
JuniperLake

D

DrakesbadWater
TreatmentPlant

√ √ √ Antimony

E Drakesbad Boardwalks

√ - - Arsenic, Copper

F

Boardwalks–
GrassySwale

√ - - Arsenic, Copper

G Hot Springs Creek

Bridge √ - - Copper

H

Devil’sKitchen
Boardwalks&

Bridge √ - - Copper

I Boardwalks –

Drake’sLakeTrail
√--Arsenic,

Copper

J

Boardwalks-
SummitLake

√ - - Arsenic, Copper

§Thepittoiletisincloseproximitytothefirelookoutstructure
(approximately90feetSoutheastofthelookoutstructure).
http://www.xrfresearchinc.com;info@xrfresearch.comPage 9 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230
*MethodNIOSH7500(SilicabyXRD;EMSLalsoreportsrespirabledust);SKC
cassette225-803(PVCfilters,GLA-5000,5.0µm,37mm)
¶MethodNIOSH7082(Lead),orNIOSH7300(metals);SKCcassette225-3-01
(MCEFilterspreloadedincassettes,0.8µm,37mm).UsemethodNIOSH7300
whenmetalsotherthanleadormultiplemetalsareinvolved.
†NIOSH7402(AsbestosbyTEM;VariationinvolvingusingofNIOSH7400–
fibersbyPCM,withapositivetriggerforTEM;useofstandardPCMcassette,
25mm,0.8µm)
2.Asbestos.Itisnotknownifasbestosispresentattheworksites,but
suspectmaterialswereobservedinthreeoftheworksites(TableIII-1,A,C
andD),soexposuremonitoringwouldbecarriedoutasaprecautionto
complywithCCRTitle8,Subchapter4,Article4,§1529(CALOSHAAsbestos
inConstructionstandard).
• Thepermissibleexposurelevel(PEL)is0.1fibers/ccofairasan8-h
time-weightedaverage(TWA).

• The Excursion Limit is 1.0 fibers/cc of air averaged over 30 minutes.

3.LeadandMetals.Oneormoremetalswereobservedinallsitesat
hazardouswastelevels(TableIII-1,above).
LeadregulationsaffectingexposurerelevanttotheprojectareafoundinCCR
Title8,§1532.1(CALOSHALeadinConstructionStandard)
• Thepermissibleexposurelevel(PEL)forleadis50µg/m3ofairasan8-
htime-weightedaverage(TWA).
o Theactionlevelforleadis30µg/m3ofairasan8-htime-
weightedaverage(TWA).
• ThePELforArsenicis10µg/m3ofair(8hTWA)*
• ThePELforAntimonyis500µg/m3ofair(8hTWA)*
• ThePELforCopperis1000µg/m3ofair(8hTWA)*
http://www.xrfresearchinc.com;info@xrfresearch.comPage 10 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230
*ThePELsformetalsarefromTableAC-1,CCRTitle8§5155(Airborne
Contaminants-Subchapter7,GeneralIndustrySafetyOrders;Group16.
ControlofHazardousSubstances,Article107,Dust,Fumes,Mists,Vaporsand

Gases)

Field Procedures for personal exposure monitoring.

• Setupwiththeappropriatecartridgesandcalibrationofpumpsistobe
donebythefieldindustrialhygienistprojectmonitor(IH).Note
crystallinesilicarequiresaconstantflowpumpliketheGilaire-5.
• Theworkersbeingmonitoredshouldbetheonesmostlikelytobe
exposedtoaparticularcontaminant,tobedeterminedbytheIH
immediatelybeforeplacingthepumpsandcartridgesperdiscussion
withthesupervisor.
o Forexample,inthecaseofremovalofafire-damagedleadacid
battery,theworkerdoingtheactualremovalshouldbemonitored
forlead(orleadandothermetals,asappropriate);theworker
operatingthesprayerorcollectingdebriscouldbemonitoredfor
otherairbornepollutantssuchasasbestosorcrystalline

silica/dust.

• Typicallyasinglepump/cartridgewouldbeusedforeachworkerper
shiftanddatacollectionmayberepresentative.
• Pumpsshouldbecalibratedbeforeandaftercollectionwiththemedia
attached.Thisisespeciallyimportantfornon-constantflowpumps
suchastheGillianBDX,astheflowcanchangeiftheporosityofthe
filterisreducedwithincreasedloading.
• ThesamplesshouldbecollectedbytheIHandlabeledcarefullywith
datarequiredforthechainofcustodysuchsampleIDs,names,dates,
flowratesandtimes,etc.andsubmittedtothelabunderchain-of-
custodyproceduresassoonasitispractical.
http://www.xrfresearchinc.com;info@xrfresearch.comPage 11 of 11
9921CarmelMountainRd.#326SanDiego,CA92129858-442-3230

IV. Worksite Air Quality Monitoring

Thissectionpertainstotheworkareaperimetermonitoring.Forpersonal
monitoring,see§III.WorkerExposureMonitoring,above.Additional
informationrelevanttothehazardousairbornesubstancescanbefoundin
thepersonalmonitoringsection.

A. Dust and particulates

DustTrak™IIparticulatemonitors(e.g.,Model8535),orsimilar
instrumentationmountedonsurveyor’stripodsataheightof~5feetfromthe
groundshouldbeusedtomeasureambientdustlevelsatalltheworksites.
ThisshouldalsoincludemonitoringandrecordingofPM10andPM2.5
particlelevels.
Thesemonitoringstationsshouldbeplaceincloseproximitytotheoperations,
e.g.,neartheboundaryoftheworkzone.Dependingonthesizeand
configurationoftheworksite,theremaybemorethanonemonitorsetup,for
example,oneupwindandonedownwindfromtheoperations.
Thesemonitorsproducereal-timedatathatshouldbeobservedbytheproject
monitor(IH).ThePELforrespirabledustis5mg/m³basedonan8-hour
TWA.IfthePELlevelisexceededatanytimeduringoperations,thework
shouldbestoppedanddustcontrolmeasuresimplemented.Thiswould
include,e.g.,mistingwithasprayerand,ifappropriate,modificationofwork
practices(videsupra).

B. Crystalline silica, Asbestos and Lead/Metals – Area Monitoring

Theworksitewouldbemonitoredusingthesamemethodsdescribedabove
forworkers,excepttheplacementwouldinvolvetripods.Samplingwouldbe
doneintheperimeteroftheworkareaoutsidetheactualregulatedarea(ash

footprint).