Sol_140P8422R0002_Amd_0002.pdf
PDF 93 KB Posted
- Attached to
- Water Tank Lining and Repairs, NPS-LABE
- Solicitation number
- 140P8422R0002
About this file
This document provides an amendment to a solicitation for water tank lining and repairs services at Lava Beds National Monument in Siskiyou County, California. The National Park Service seeks a contractor to drain an existing water storage tank, install a polypropylene liner to extend the tank's useful life and reduce water leakage, replace non-operational valves on outlet lines, and perform related work. The amendment answers bidder questions, clarifying that structural repairs are not required and patching will be limited, confirming testing will be the contractor's responsibility, and allowing the National Park Service to handle weekend sampling. The period of performance is September 5, 2022 to December 4, 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8422R0002 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPR
Point Reyes Station CA 94956-9703 1 Bear Valley Road Point Reyes National Seashore
NPS, PWR - PORE MABO
LABE 31691507/06/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/09/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WATER TANK LINING AND REPAIRS, LAVA BEDS NATIONAL MONUMENT, SISKIYOU COUNTY, CALIFORNIA.
This Amendment 0002 provides answers to questions received to date, as follows:
Q1: Please see sheet C4 note 4, also spec 334713 3.1 A,B,C these all make reference to repairing of the existing concrete. Depending on what kind of shape the existing concrete is in this could take a considerable effort. I am not sure there is enough information to quantify this. For bidding purposes how would you like to handle this?
A1: In general, we believe that the existing tank is in good condition. Previous dive inspection noted only minor deficiencies. Repairs will be limited to patching minor spalls
(generally less than ½" deep) and plugging minor leaks/crack perhaps from roots that may
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Alanna Gardner
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8422R0002/0002 have grown through the joints. There will be no structural repairs of the tank. The scope is limited to removing any spalling or flaking concrete and patching any cracks/spalls with mortar. For planning purposes, the total patching area will unlikely exceed 100 SF, and potentially up to 250 LF for hairline cracks.
Q2: See spec 33 11 00- 6.4. Can you confirm the plant staff will be performing the bacteriological sampling and testing? I am assuming there is someone onsite already doing this, versus the general contractor.
A2: The contractor will be responsible for testing. Typically the contractor takes the samples and sends them to an independent lab.
NPS will likely take their own samples for confirmation.
Q3: Please confirm the thickness of the tank walls.
A3: Based on the record drawings, the exterior walls are 9 inches thick, and the interior partition wall is 8 inches thick.
Q4: The plans call for the contractor to take no fewer than 4 chlorine residual samples per 24 hours that the temporary tank is in operation.
Our work hours will be a typical workday of 7-5.
Please confirm the 4 samples can be taken between the normal work hours.
A4: Yes, they can be taken during normal work hours.
Q5: Regarding chlorine samples, what about non-workdays or weekends? Will we be required to send someone to the jobsite on the weekends to take water samples throughout the day? If the contractor provided the testing equipment to NPS staff, perhaps NPS staff could cover the sampling when the contractor is not on site. It would save a lot of money in the contract.
A5: Yes, NPS can take samples over the weekend as required.
Legacy Doc #: NPS
Period of Performance: 09/05/2022 to 12/04/2022
Nathan Anderson is designated as the NPS
Contracting Officer's Representative (COR) for this contract and will be responsible for certifying receipt and acceptance of the services
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8422R0002/0002 rendered.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .