Att_01_P8419R0006_Contract_Bid_Schedule.pdf

PDF 66 KB Posted

Attached to
Entrance Station Construction, NPS-PINN
Solicitation number
140P8419R0006
Issued by

About this file

Att 01_P8419R0006_Contract Bid Schedule

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

TOTAL PRICE

Construct the Complete Entrance Station Kiosk

Building as show on the Construction Documents 1 LS $

Provide Site Demolition; provide Site Excavation, Grading and Erosion Control; and Construct Roads, Island, Unpaved Shoulders, Drainage Features and miscellaneous amenities as shown on the

Construction Documents for the Base Bid

1 LS $

Construct Site Electrical and Data Utilities as shown on the Construction Documents for the Base Bid 1 LS $

OPTION A, Construct the Complete Support Building as shown on the Construction Documents 1 LS $

OPTION B, Construct Paving and Site Amentities as shown on the Construction Documents for the Bid

Option

1 LS $

OPTION C, Construct Water and Wastewater Systems as shown on the Construction Documents for the Bid

Option

1 LS $

CONTRACT BID SCHEDULE

SOLICITATION NUMBER: 140P8419R0006

PARK ‐ PMIS: PINN ‐ 198668

DEVELOPED AREA: Approximately 0.76 acres

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 4 through 6) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

TOTAL PROPOSED PRICE ‐ BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) ‐‐‐‐‐‐‐‐‐‐‐

All measurement and payment information is included in the project specifications, Section 01 27 00.

Notice: Refer to the clause Evaluation of Options, found in Section M of the Solicitation. Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all Option line items. Failure to do so may render the proposal unacceptable. On lump‐sum line items, provide the total price only. For all unit‐priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item.

In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award.

TOTAL BASE PRICE (Contract Line Item Number 1 through 3) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

PROJECT TITLE: Replace the East Entrance Station, Pinnacles National Park, San Benito County, CA

PINN‐198668

CBS ‐ 1

File details come from the government source that posted it.