140P8418Q0023 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPR
Point Reyes Station CA 94956-9703 1 Bear Valley Road Point Reyes National Seashore
NPS, PWR - PORE MABO
03/13/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/28/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
REPLACE OLEMA CREEK FENCING AT STEWART HORSE CAMP, POINT REYES NATIONAL SEASHORE, MARIN
COUNTY, CALIFORNIA
This Amendment provides the Questions and Answers from a recently requested Site Visit on
March 8, 2018, as follows:
Q: The Statement of Work reads, "square posts are preferred", is that a requirement?
A: Yes. The Statement of Work is updated to clarify that square posts are required. See the revised SOW (attached). Note: Revised information in the SOW is indicated by red text.
Q: Should the new fencing tie into the existing vehicle access bridge?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Alanna Gardner
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8418Q0023/0001
A: No, end posts should be installed directly adjacent to the bridge.
Q: Where do the sections of fence end?
A: Fence ends in shrubs at old fence alignment, if existing, at Rift Zone Trail, and at vehicle access bridge (see above). End points will be marked by NPS prior to construction.
Q: Can we trim willows to assist with fence alignment in two locations?
A: Yes, willows can be trimmed but minimize trimming to 3-4 feet.
Q: Can we move two existing fire pits if needed to assist with fence alignment?
A: Yes, all fire pits are scheduled to be removed, but if they have not yet been removed at time of construction they can be pushed out of the way.
Q: Is there a designated staging area?
A: Yes, behind the trash/campground signage area.
Q: Will the campground be operational during construction?
A: The campground may be operational after April
1st, however NPS will coordinate with the campground manager to ensure the area along the creek where fencing is to be installed is not occupied by campers.
Legacy Doc #: NPS
Period of Performance: 04/02/2018 to 05/01/2018
Dylan Voeller will be designated as the
Contracting Officer's Representative for this order and will be responsible for certifying receipt and acceptance of the services rendered.
He can be reached at 415-464-5216 or
Dylan_Voeller@nps.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it.