NORTH CASCADES NATIONAL PARK SERVICE COMPLEX
NORTH CASCADES NATIONAL PARK
ROSS LAKE NATIONAL RECREATION AREA
LAKE CHELAN NATIONAL RECREATION AREA
STEHEKIN, WASHINGTON
Erosion and Drainage Improvements on Stehekin Valley Road Mile 4, 5.5, and 8
PMIS NO. 247586
STATEMENT OF WORK
NATIONAL PARK SERVICE
PACIFIC WEST REGION
July 2019
Erosion and drainage improvements (PMIS 247586) North Cascades NPS Complex Attachment 1: Statement of Work
PART 1 - GENERAL
1 .1 DESCRIPTION OF WORK
A. The work of this contract consists of purchasing and installing ultrablocks and improve surrounding drainage channels at mile 8, improve erosion control at mile 4 and improve erosion control at mile
5.5 of the Stehekin Road at the North Cascades National Park (NOCA) located in Stehekin, WA.
Work specific elements include, but are not limited to, the following:
1. Mile 8 - Purchase and install 112 concrete ultrablocks that are 2.5’x2.5’x5’ with the Quarrystone face finish and install along two sections at mile 8. The section includes 200 feet at the north end of the site and 80 feet up valley from the existing dry rock wall for a total of 280 feet according to the specifications in Attachment A. The ultrablock wall shall be placed as far from the toe of the slope as possible to maintain adequate road width (minimum 14 feet). All rocks and sediment shall be removed from the road and slope edge before placement of the blocks to allow a level resting surface. The ultrablock wall shall be stacked two blocks high for a finished height of five feet. Blocks shall be stacked such that the upper block is resting on the lower two. Due to the coarse nature of the sediment expected to fill in behind the wall, no wall drainage is included in the work.
2. Mile 4 - Purchase and install 50 cubic yards of large rocks to be utilized with large woody debris provided by the NPS to create a rock barb in the channel at mile 4 according to specifications in Attachment B. The 50 cubic yards of large rocks shall be made up using FHWA Class 5 riprap specifications. The contractor also shall construct a 20 foot long access road from the Stehekin valley road 5 feet down a steep embankment to reach the river edge.
The road would start from the upstream end of the project area. No machinery below OHWM (Ordinary High Water Mark). See 1.5 A.
3. Mile 5.5 - Purchase and install 100 cubic yards of large rocks to be utilized with large woody debris provided by the NPS to create two rock barbs in the channel at mile 5.5 according to specifications in Attachment C. The 100 cubic yards of large rocks shall be made up using FHWA Class 5 riprap specifications. The contractor also shall construct a 150 foot long access road from the Stehekin valley road 15 feet down a steep embankment to reach the river bottom. The road would start from the downstream end of the project area. No machinery below OHWM. See 1.5 A.
B. All work will be performed under a single firm fixed price contract.
1 .2 DEFINITION OF CONTRACT LINE ITEMS
A. Base Item No. 1 – Purchase and Install Ultrablocks at Mile 8
This price item consist of providing all labor and equipment required to purchase, barge and install ultrablocks. This also includes removal of any rocks prior to placement of the blocks to ensure as level a surface as possible.
B. Option Item A – Mile 4 Erosion Control and Bank Stabilization
This price item consist of providing all labor and equipment required to purchase large rocks, barge them to Stehekin and construct the rock barb. This also includes construction of a temporary access road to reach the river edge.
C. Option Item B – Mile 5.5 Erosion Control and Bank Stabilization
This price item consist of providing all labor and equipment required to purchase large rocks, barge them to Stehekin and construct the rock barb. This also includes construction of a temporary access road to reach the river edge.
1 .3 LOCATION
A. The road section for these three sites is located in Stehekin, Washington, at the north end of Lake Chelan. The site is remote, and there is no road access to Stehekin, though there are roads within Stehekin Valley.
1. The location where the toe stabilization ultrablocks will be installed is located 8 miles from Stehekin landing along Stehekin Road just before Stehekin Valley Ranch.
2. The location of mile 4 erosion control and bank stabilization is located 4 miles from Stehekin landing along Stehekin Road just after the Buckner Orchard road.
3. The location of mile 5.5 erosion control and bank stabilization is located 5.5 miles from Stehekin landing along Stehekin Road and about 1 mile after passing Harlequin Bridge. Note that the work is along Stehekin road and not across Harlequin Bridge.
B. The maintenance area “fairway” is located approximately 4.5 miles from Stehekin landing. The site is located after crossing Harlequin Bridge and passing through the NPS maintenance area. The site is just on the west side before coming to the airstrip.
C. The NPS will provide road access to the property in the event of snow. However, the NPS will not be responsible for removing snow in and around where work will occur.
D. NPS-concessionaire and private lodging options may be available in Stehekin. Maps, description, accommodations, and services may be viewed at www.lodgeatstehekin.com, http://www.nps.gov/noca/planyourvisit/stehekin.htm, www.stehekinvalley.com, and www.stehekin.com.
E. Public phone service at Stehekin is limited to a single telephone requiring credit or calling card.
Cellular phone service is not available.
F. Public internet access is not available.
G. Transportation is available via the Lake Chelan Boat Company (passenger ferries), private boat or barge to the marina at Stehekin. Materials may be transported to the site by barges, which do not run on a fixed schedule but can be chartered for a fee. Some tools and materials may be transported on the ferries.
H. Transportation – Information and links to area public transportation: (Provided for information purposes only)
1. Lake Chelan Boat Company (Lady of the Lake) Address: 1418 W Woodin Ave, Chelan, WA 98816 Phone: 509-682-4584 Website: http://ladyofthelake.com/ http://www.lodgeatstehekin.com/ http://www.nps.gov/noca/planyourvisit/stehekin.htm http://www.stehekin.com/ http://ladyofthelake.com/
2. Mountain Barge Service (MBS) Address: 1222 W. Woodin Ave, Chelan, WA 98816 Phone: 509-682-2493 Email: info@mountainbarge.com
1 .4 SCHEDULE
A. Target dates for on-site work are October 1 – December 15, 2019.
B. Period of performance: Contractor has 60 days to complete the entire work for use after the date the contractor receives the notice to proceed.
1 .5 SPECIAL CONSTRUCTION REQUIREMENTS
A. The NPS will acquire permits through the Washington State Joint Aquatic Resource Permit Application (JARPA) for Mile 4 and Mile 5.5 (Option Items A and B). The Contractor must have a complete understanding of all restrictions and permitting requirements. It is the contractor’s responsibility to familiarize him/herself with the conditions of the permit and perform all work in accordance with permit provisions. The permit for this work include the Section 404 Clean Water Act approval from the U.S. Army Corps of Engineers. NPS will provide the permit upon approval.
The application for the required permit is in process and approval is expected in September or October. The NPS does not expect significant mitigations as a part of the required work.
B. Contractor shall at all times conduct their operations to ensure the least inconvenience to the public.
Confine storage of materials to the work limits of the project.
C. All excess materials and project debris, including all trash from any Contractor generated source, shall be completely removed from the park for reuse, recycling, or environmentally responsible disposal at a down lake site. No disposal of any items shall be allowed within the park or surrounding community.
D. Work Restrictions: Work may occur only between 7:00 am and 5:00 pm, Monday through Friday, except those days designated as federal holidays, unless prior permission is granted by the COR. The Contractor shall propose a schedule, which shall be discussed with the COR. The final schedule shall be approved by the COR prior to the commencement of the actual work.
E. Traffic control: Stehekin road is the only means to access areas of Stehekin for residents, park staff and visitors. While it is expected delays will occur during work, maximum delay for traffic in any direction shall not exceed 15 minutes. Provide signage on each end of the construction site for notification. The NPS shall notify the Stehekin community of the work occurring and to expect delays.
F. Keep project area neat, orderly and in a safe condition at all times.
1 .6 FIELD VERIFICATION
Field verify all conditions affecting the work of this contract before mobilizing. All provided measurements are estimates only.
1 .7 CONSTRUCTION MATERIALS
mailto:info@mountainbarge.com
A. The Contractor shall supply all materials required for the work except for woody debris.
B. The NPS will provide woody debris for the rock bar construction. Material will be located at the lower field located at mile 7.2. It will be the contractor’s responsibility to haul woody debris to the job site.
1 .8 WATER AND SANITARY SERVICES
A. Water is not available for Contractor’s use at the work site. NPS shall not provide any water to the contractor.
1. If the contractor plans to draw any amount of surface water (from a river, stream, spring, or lake) for any purpose then they must contact the Washington State Department of Ecology to apply for a permit and follow the limitations on draw rates. Please keep in mind that permits can take 90-120+ days to acquire. https://ecology.wa.gov/
2. If the contractor plans to use groundwater (from a well) then a permit from the Washington State Department of Ecology is required if the contractor will draw more than 5,000 gallons per day for this industrial use. https://ecology.wa.gov/
B. Public restrooms are located at the Stehekin Landing near the general store, approximately 4, 5.5 and 8 miles from each respective job site. Vault toilets are also available at Rainbow Falls, approximately 1, 2.5 and 5 miles from each respective job site.
1 .9 ELECTRICAL POWER
A. Contractor will need to furnish their own auxiliary source of power for power tools and lights if required.
B. Auxiliary power source, such as generators, are to be run during working hours only as to disturb residences are little as possible.
PART 2 – SPECIFICATIONS AND DETAILS
2 .1 EQUIPMENT
A. All equipment shall be leak-free, and all servicing must occur off-site on private property or in a location approved by the COR.
B. It is required that all equipment used in this contract contains bio-based hydraulic fluid. Information on this material can be viewed at https://www.biopreferred.gov/BioPreferred/
C. Equipment gross weight shall not exceed Harlequin bridge weight limits and sizes. Crossing the bridge is the only way to access the maintenance area “fairway” to store rock for the rock barbs.
Please refer to Attachment D for exact details.
2 .2 ULTRABLOCK SPECIFICATIONS
This requirement is subject to FAR Clause 52.211-6 Brand Name or Equal.
Ultrablock Specifications are based off Ultrablock, Inc concrete blocks.
https://ecology.wa.gov/ https://ecology.wa.gov/ https://www.biopreferred.gov/BioPreferred/
The requirements include but are not limited to:
A. Ultrablock Specifications
1. 2.5’ x 2.5’x 5’ Full style, 4320 lbs each
2. Quarrystone face finish
B. Approved Equals:
1. For each item proposed as an “approved equal,” submit supporting data, including:
a. Drawings and samples as appropriate.
b. Comparison of the characteristics of the proposed item with that specified.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
e. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
2 .3 ROCK BARB SPECIFICATIONS
A. Rock composition shall meet FHWA class 5 riprap specifications and adhere to FHWA standards.
See Attachment E for details.
B. Purchased rock may be stored in the maintenance area “fairway” located just across Harlequin Bridge. It is the contractors responsibility to haul rock delivered from the barge to the fairway and then to and from the job site. The COR will designate the space for the rock to be stored at this location.
PART 3 – EXECUTION
3. 1 CONTRACTOR TASKS
A. Prior to beginning work, coordinate work schedule with the Contracting Officers Representative
(COR).
B. No physical work shall commence at the site until a notice to proceed is issued by the Contracting Officer.
C. Contractor shall give a minimum 7 day notice to the COR prior to mobilization.
D. Furnish and provide all labor, materials, equipment, supervision, water, transportation, and lodging required to complete the work specified.
3 .2 AVOIDANCE OF NOXIOUS WEEDS
A. To prevent the introduction of the seeds from noxious weeds into Stehekin valley or onto NPS land, the Contractor shall wash all mechanized equipment thoroughly, top to bottom, before transport via barge. This includes the removal of all soil, seeds, vegetative matter or other debris that could contain or hold seeds or plant material. Diffuse or Spotted Knapweed, Rush Skeleton weed and Japanese Knotweed are the primary noxious weeds of concern.
1. The Contractor shall employ whatever cleaning methods are necessary to ensure compliance with the terms of this provision, and shall notify the NPS prior to moving each piece of mechanized equipment into Stehekin valley. Cleaning of equipment shall not occur on NPS land. Notification will include identifying the location of the equipment's most recent operation.
2. The NPS will inspect each piece of equipment prior to its being placed into service. If a piece of equipment fails the inspection, the Contractor will be responsible to perform whatever methods are necessary to pass upon re-inspection and will bear all costs.
3. The Contractor shall certify in writing, compliance with the terms of this clause prior to placement on a barge for arrival in Stehekin valley. For the purposes of this provision, "equipment" means all ground-based contract machinery, including pickup trucks, cars, or other vehicles used to transport personnel.
3 .3 ACCIDENT PREVENTION
A. Accident Prevention Plan (APP): Prior to beginning work contractor shall submit for approval a site-specific APP. The Contracting Officer will review the proposed program for compliance with OSHA and project requirements. If the program requires any revisions or corrections, the Contractor shall resubmit the program within 10 days. The Contracting Officer will not issue the Notice to Proceed until the APP is approved. The plan shall include:
1. Name of responsible supervisor to carry out the program.
2. Weekly and monthly safety meetings.
3. First aid procedures.
4. Description of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees.
5. Training, both initial and continuing.
6. Planning for possible emergency situations, such as earthquakes, floods, wind storms, fires, cave ins, slides, explosions, and power outages. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
7. Waste control and potential hazardous materials precautions.
8. Personal protective equipment.
9. Hauling routes – coordinate with Contracting Officer.
B. Ensure first aid is available and training adequate for the number of employees and the type of construction at the site.
C. Report all accidents to the COR immediately. A reportable accident is defined as death, occupational disease, traumatic injury to an employee or the public, property damage in excess of $100, and fires.
Form DI-134 must be completed and submitted to the COR within three days of an accident. Forms are available from the COR.
D. Provide personal protective equipment that meets the requirements of OSHA, NIOSH and MSHA, Material Safety Data information where applicable, as well as ANSI.
E. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
F. Provide all necessary traffic barriers, traffic control signs, markers, and flaggers when required during operations. Traffic control for occupied work areas shall be in accordance with National Standards contained in the Manual of Uniform Traffic Control Devices (MUTCD).
G. Post specific reporting instructions for contacting Emergency Response Personnel in Stehekin in conspicuous locations at the work site.
H. Identify materials considered to be “Hazardous Materials” by industry standards and provide protection and security for identified materials throughout contract period. Hazardous materials spills shall be reported immediately and clean up shall be the sole responsibility of contractor.
I. As a minimum, conduct weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all personnel at the worksite. Conduct monthly safety meetings for all levels of supervision. Notify the COR so that they may attend. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe work activities, and for updating the accident prevention program. The COR will enter the results of the meetings into their daily log.
J. The work site is designated as a hard hat area by the Contracting Officer. The hard hat area shall be posted by the Contractor in a manner satisfactory to the COR. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide six hard hats for use by visitors. Change liners before reissuing hats.
3 .4 SPILL PREVENTION
Spill Prevention/Response Plan (SPP): Prior to beginning work contractor shall submit for approval a site-specific Spill Prevention and Response Plan. The COR will review the proposed program for compliance with OSHA and project requirements. If the program requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days. The Contracting Officer will not issue the Notice to Proceed until the SPP is approved.
3 .5 SITE RESTORATION
A. Road finish shall be as close to current slope and width as possible.
B. Fill materials, if needed, shall be native soils, stone, gravel or sand, free of debris, frozen materials, roots and other organic matter.
1. Fill material shall be approved by COR prior to use.
2. Fill material may come from the park depending on the amount required. Contractor will be responsible for hauling of material to the job site. Material shall be approved by COR prior to use.
C. Ensure all areas to be backfilled are free of standing water, frost, frozen material and debris.
D. Grade backfilled areas to blend with original contours.
PART 4 - SUBMITTALS
4 .1 PRE-WORK
A. Accident Prevention Plan (APP).
B. Spill Prevention Plan (SPP).
C. Certificate of Insurance
D. Payment Bond
PART 5 – ATTACHMENTS
A. Mile 8 Ultrablocks Maps and Photos
B. Mile 4 Erosion Control Maps and Photos
C. Mile 5.5 Erosion Control Maps and Photos
D. Harlequin Bridge Weight Limit and Report Excerpt
E. Federal Highways Riprap Specifications
F. Maintenance Area Fairway Location
| 1 .1 DESCRIPTION OF WORK |
| A. The work of this contract consists of purchasing and installing ultrablocks and improve surrounding drainage channels at mile 8, improve erosion control at mile 4 and improve erosion control at mile 5.5 of the Stehekin Road at the North Cascades Na... |
| 1. Mile 8 - Purchase and install 112 concrete ultrablocks that are 2.5’x2.5’x5’ with the Quarrystone face finish and install along two sections at mile 8. The section includes 200 feet at the north end of the site and 80 feet up valley from the existi... |
| 2. Mile 4 - Purchase and install 50 cubic yards of large rocks to be utilized with large woody debris provided by the NPS to create a rock barb in the channel at mile 4 according to specifications in Attachment B. The 50 cubic yards of large rocks sha... |
| 3. Mile 5.5 - Purchase and install 100 cubic yards of large rocks to be utilized with large woody debris provided by the NPS to create two rock barbs in the channel at mile 5.5 according to specifications in Attachment C. The 100 cubic yards of large ... |
B. All work will be performed under a single firm fixed price contract.
| 1 .2 DEFINITION OF CONTRACT LINE ITEMS |
| A. Base Item No. 1 – Purchase and Install Ultrablocks at Mile 8 |
| This price item consist of providing all labor and equipment required to purchase, barge and install ultrablocks. This also includes removal of any rocks prior to placement of the blocks to ensure as level a surface as possible. |
| B. Option Item A – Mile 4 Erosion Control and Bank Stabilization |
| This price item consist of providing all labor and equipment required to purchase large rocks, barge them to Stehekin and construct the rock barb. This also includes construction of a temporary access road to reach the river edge. |
| C. Option Item B – Mile 5.5 Erosion Control and Bank Stabilization |
| This price item consist of providing all labor and equipment required to purchase large rocks, barge them to Stehekin and construct the rock barb. This also includes construction of a temporary access road to reach the river edge. |
| 1 .3 LOCATION |
| A. The road section for these three sites is located in Stehekin, Washington, at the north end of Lake Chelan. The site is remote, and there is no road access to Stehekin, though there are roads within Stehekin Valley. |
| 1. The location where the toe stabilization ultrablocks will be installed is located 8 miles from Stehekin landing along Stehekin Road just before Stehekin Valley Ranch. |
| 2. The location of mile 4 erosion control and bank stabilization is located 4 miles from Stehekin landing along Stehekin Road just after the Buckner Orchard road. |
| 3. The location of mile 5.5 erosion control and bank stabilization is located 5.5 miles from Stehekin landing along Stehekin Road and about 1 mile after passing Harlequin Bridge. Note that the work is along Stehekin road and not across Harlequin Bridge. |
| B. The maintenance area “fairway” is located approximately 4.5 miles from Stehekin landing. The site is located after crossing Harlequin Bridge and passing through the NPS maintenance area. The site is just on the west side before coming to the airstrip. |
| C. The NPS will provide road access to the property in the event of snow. However, the NPS will not be responsible for removing snow in and around where work will occur. |
| D. NPS-concessionaire and private lodging options may be available in Stehekin. Maps, description, accommodations, and services may be viewed at www.lodgeatstehekin.com, http://www.nps.gov/noca/planyourvisit/stehekin.htm, www.stehekinvalley.com, and ... |
| E. Public phone service at Stehekin is limited to a single telephone requiring credit or calling card. Cellular phone service is not available. |
| F. Public internet access is not available. |
| G. Transportation is available via the Lake Chelan Boat Company (passenger ferries), private boat or barge to the marina at Stehekin. Materials may be transported to the site by barges, which do not run on a fixed schedule but can be chartered for a f... |
| H. Transportation – Information and links to area public transportation: (Provided for information purposes only) |
| 1. Lake Chelan Boat Company (Lady of the Lake) |
| Address: 1418 W Woodin Ave, Chelan, WA 98816 |
| Phone: 509-682-4584 Website: http://ladyofthelake.com/ |
| 2. Mountain Barge Service (MBS) |
| Address: 1222 W. Woodin Ave, Chelan, WA 98816 |
| Phone: 509-682-2493 Email: info@mountainbarge.com |
| 1 .4 SCHEDULE |
| 1 .5 SPECIAL CONSTRUCTION REQUIREMENTS |
| 1 .6 FIELD VERIFICATION |
| Field verify all conditions affecting the work of this contract before mobilizing. All provided measurements are estimates only. |
| 1 .7 CONSTRUCTION MATERIALS |
| A. The Contractor shall supply all materials required for the work except for woody debris. |
| B. The NPS will provide woody debris for the rock bar construction. Material will be located at the lower field located at mile 7.2. It will be the contractor’s responsibility to haul woody debris to the job site. |
| 1 .8 WATER AND SANITARY SERVICES |
| A. Water is not available for Contractor’s use at the work site. NPS shall not provide any water to the contractor. |
| 1. If the contractor plans to draw any amount of surface water (from a river, stream, spring, or lake) for any purpose then they must contact the Washington State Department of Ecology to apply for a permit and follow the limitations on draw rates. Pl... |
| 2. If the contractor plans to use groundwater (from a well) then a permit from the Washington State Department of Ecology is required if the contractor will draw more than 5,000 gallons per day for this industrial use. https://ecology.wa.gov/ |
B. Public restrooms are located at the Stehekin Landing near the general store, approximately 4, 5.5 and 8 miles from each respective job site. Vault toilets are also available at Rainbow Falls, approximately 1, 2.5 and 5 miles from each respective jo...
| 1 .9 ELECTRICAL POWER |
| A. Contractor will need to furnish their own auxiliary source of power for power tools and lights if required. |
| B. Auxiliary power source, such as generators, are to be run during working hours only as to disturb residences are little as possible. |
| 2 .1 EQUIPMENT |
| A. All equipment shall be leak-free, and all servicing must occur off-site on private property or in a location approved by the COR. |
| B. It is required that all equipment used in this contract contains bio-based hydraulic fluid. Information on this material can be viewed at https://www.biopreferred.gov/BioPreferred/ |
| C. Equipment gross weight shall not exceed Harlequin bridge weight limits and sizes. Crossing the bridge is the only way to access the maintenance area “fairway” to store rock for the rock barbs. Please refer to Attachment D for exact details. |
| 2 .2 ULTRABLOCK SPECIFICATIONS |
| A. Ultrablock Specifications |
| 1. 2.5’ x 2.5’x 5’ Full style, 4320 lbs each |
| 2. Quarrystone face finish |
| B. Approved Equals: |
| 1. For each item proposed as an “approved equal,” submit supporting data, including: |
| a. Drawings and samples as appropriate. |
| b. Comparison of the characteristics of the proposed item with that specified. |
| c. Changes required in other elements of the work because of the substitution. |
| d. Name, address, and telephone number of vendor. |
| e. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of re... |
| 2 .3 ROCK BARB SPECIFICATIONS |
| A. Rock composition shall meet FHWA class 5 riprap specifications and adhere to FHWA standards. See Attachment E for details. |
| B. Purchased rock may be stored in the maintenance area “fairway” located just across Harlequin Bridge. It is the contractors responsibility to haul rock delivered from the barge to the fairway and then to and from the job site. The COR will designate... |
| 3. 1 CONTRACTOR TASKS |
| A. Prior to beginning work, coordinate work schedule with the Contracting Officers Representative (COR). |
| B. No physical work shall commence at the site until a notice to proceed is issued by the Contracting Officer. |
| C. Contractor shall give a minimum 7 day notice to the COR prior to mobilization. |
| D. Furnish and provide all labor, materials, equipment, supervision, water, transportation, and lodging required to complete the work specified. |
| 3 .2 AVOIDANCE OF NOXIOUS WEEDS |
| A. To prevent the introduction of the seeds from noxious weeds into Stehekin valley or onto NPS land, the Contractor shall wash all mechanized equipment thoroughly, top to bottom, before transport via barge. This includes the removal of all soil, seed... |
| 1. The Contractor shall employ whatever cleaning methods are necessary to ensure compliance with the terms of this provision, and shall notify the NPS prior to moving each piece of mechanized equipment into Stehekin valley. Cleaning of equipment shall... |
| 2. The NPS will inspect each piece of equipment prior to its being placed into service. If a piece of equipment fails the inspection, the Contractor will be responsible to perform whatever methods are necessary to pass upon re-inspection and will bear... |
| 3. The Contractor shall certify in writing, compliance with the terms of this clause prior to placement on a barge for arrival in Stehekin valley. For the purposes of this provision, "equipment" means all ground-based contract machinery, including pic... |
| 3 .3 ACCIDENT PREVENTION |
| A. Accident Prevention Plan (APP): Prior to beginning work contractor shall submit for approval a site-specific APP. The Contracting Officer will review the proposed program for compliance with OSHA and project requirements. If the program requires an... |
| 1. Name of responsible supervisor to carry out the program. |
| 2. Weekly and monthly safety meetings. |
| 3. First aid procedures. |
| 4. Description of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees. |
| 5. Training, both initial and continuing. |
| 6. Planning for possible emergency situations, such as earthquakes, floods, wind storms, fires, cave ins, slides, explosions, and power outages. Such planning shall take into consideration the nature of construction, site conditions, and degree of exp... |
| 7. Waste control and potential hazardous materials precautions. |
| 8. Personal protective equipment. |
| 9. Hauling routes – coordinate with Contracting Officer. |
| B. Ensure first aid is available and training adequate for the number of employees and the type of construction at the site. |
| C. Report all accidents to the COR immediately. A reportable accident is defined as death, occupational disease, traumatic injury to an employee or the public, property damage in excess of $100, and fires. |
| Form DI-134 must be completed and submitted to the COR within three days of an accident. Forms are available from the COR. |
| D. Provide personal protective equipment that meets the requirements of OSHA, NIOSH and MSHA, Material Safety Data information where applicable, as well as ANSI. |
| E. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual. Inspect and maintain other protective equipment and devices ... |
| F. Provide all necessary traffic barriers, traffic control signs, markers, and flaggers when required during operations. Traffic control for occupied work areas shall be in accordance with National Standards contained in the Manual of Uniform Traffic ... |
| G. Post specific reporting instructions for contacting Emergency Response Personnel in Stehekin in conspicuous locations at the work site. |
| H. Identify materials considered to be “Hazardous Materials” by industry standards and provide protection and security for identified materials throughout contract period. Hazardous materials spills shall be reported immediately and clean up shall be ... |
| I. As a minimum, conduct weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all personnel at the worksite. Conduct monthly safety meetings for all levels of supervision. Notify the COR so that th... |
| J. The work site is designated as a hard hat area by the Contracting Officer. The hard hat area shall be posted by the Contractor in a manner satisfactory to the COR. It is the Contractor's responsibility to require all those working on or visiting th... |
| 3 .4 SPILL PREVENTION |
| Spill Prevention/Response Plan (SPP): Prior to beginning work contractor shall submit for approval a site-specific Spill Prevention and Response Plan. The COR will review the proposed program for compliance with OSHA and project requirements. If the p... |
| 3 .5 SITE RESTORATION |
| A. Road finish shall be as close to current slope and width as possible. |
| B. Fill materials, if needed, shall be native soils, stone, gravel or sand, free of debris, frozen materials, roots and other organic matter. |
| 1. Fill material shall be approved by COR prior to use. |
| 2. Fill material may come from the park depending on the amount required. Contractor will be responsible for hauling of material to the job site. Material shall be approved by COR prior to use. |
| C. Ensure all areas to be backfilled are free of standing water, frost, frozen material and debris. |
| D. Grade backfilled areas to blend with original contours. |